BainUltra 6634 Ultra Evanescence Thermomasseur Tub Instruction Manual

June 15, 2024
BainUltra

BainUltra-logo

BainUltra 6634 Ultra Evanescence Thermomasseur Tub

BainUltra-6634-Ultra-Evanescence-Thermomasseur-Tub-product-
image

Product Information: Evanescence Freestanding Baths

Specification

  • Model : Evanescence 6634 & Evanescence Oval 5936, 6636, 7440
  • Parts Included : A-1 Floor anchoring, A-2 Installation template
  • Tools Required : B-1 48-inch level, B-2 Caulking gun, B-3 Silicone, B-4 Saw, B-5 ABS & PVC Glue

Site Preparation
Evanescence Freestanding models require a 13 x 14 (33 cm X 36 cm) compartment for the drain, distance air inlet, and space for control cables and options. Please refer to the installation template for specific measurements.

Access and Air Inlet
For these models, the turbine is not installed on the bathtub. Choose a location near the bathtub, within a maximum distance of 15 feet or 4.6 meters under the floor, in a cabinet or any other concealed location to house the turbine and optional accessory casings. The chosen location must also allow sufficient air intake for the turbine.

Installation Instructions

Location

  1. Place the installation template on the ground at the desired location.
  2. Align the position of the overflow drain with the floor drain and ensure that the compartment size meets requirements.
  3. Mark the location of the anchor point screws.
  4. Remove the installation template and screw in the anchor points in the marked locations.

Installation of Bath

  1. Assemble the drain on the bathtub, using the provided overflow assembly for the junction to the drain T-joint. Ensure watertightness. It is easier to complete this operation when the bathtub rests on its side. Place a cover or protective cardboard on the floor before positioning the bathtub on its side.
  2. If necessary, cut the overflow pipe to the desired length and glue it to the PVC connector and drain.
  3. Apply a joint of silicone under the edge of the base of the bathtub.
  4. Install the bathtub on the anchor points that are fastened to the floor and immediately wipe away any excess silicone. Connect the drain.
  5. The air inlet is located to the right of the bathtub drain, and if applicable, control and option connection cables to the right. Connect control and option cables if applicable. For Geysair-equipped baths, also run the water hose and electrical wiring through the floor.
  6. For Geysair-equipped baths, connect the Geysair electrical wire supplied with the male connector with the turbine cable equipped with the female connector. Test for grounding continuity between the bath grounding terminal and the bath power supply. Failure to perform the grounding continuity test could result in serious personal injury.

FAQ

  • Do I need any specific tools for installation?
    Yes, you will need a 48-inch level, caulking gun, silicone, saw, ABS & PVC glue.

  • What size compartment do I need for the drain and control cables?
    You will need a compartment measuring 13 x 14 inches (33 cm X 36 cm) for the drain, distance air inlet, and space for control cables and options.

  • Where should I locate the turbine and optional accessory casings?
    Choose a location near the bathtub, within a maximum distance of 15 feet or 4.6 meters under the floor, in a cabinet, or any other concealed location to house the turbine and optional accessory casings.

  • How do I connect the Geysair electrical wire?
    For Geysair-equipped baths, connect the Geysair electrical wire supplied with the male connector with the turbine cable equipped with the female connector. Make sure to test for grounding continuity between the bath grounding terminal and the bath power supply.

EVANESCENCE® ADDENDUM to the OWNER’S MANUAL

IMPORTANT INFORMATION FOR THE INSTALLER AND THE OWNER

INCLUDED : FREESTANDING EVANESCENCE BATHS INSTALLATION INSTRUCTIONS

EVANESCENCE 6634 & EVANESCENCE OVAL 5936, 6636, 7440 PARTS AND TOOL

A-1 Floor anchoring
A-2 Installation template
B-1 48-inch level
--- ---
B-2 Caulking gun
B-3 Silicone
B-4 Saw
B-5 ABS & PVC Glue

EVANESCENCE 6634 & EVANESCENCE OVAL 5936, 6636, 7440 SiTE PREPARATION
Evanescence Freestanding models require a 13” x 14” (33 cm X 36 cm) compartment for the drain, distance air inlet, and space for control cables and options. Refer to the installation template.

ACCESS AND AIR INLET

  • For these models, the turbine is not installed on the bathtub.
  • Determine a location near the bathtub at a maximum distance of 15 feet or (4.6 metres) under the floor, in a cabinet or any other location to conceal the turbine and optional accessory casings. The location chosen must also be accessible and allow sufficient air intake for the turbine.
  • ( Refer to the TURBINE – remote mounting INSTALLATION section of the Owner’s Manual)

EVANESCENCE 6634 & EVANESCENCE OVAL 5936, 6636, 7440 INSTALLATION

1- 1| Place the installation template on the ground at the chosen location.
---|---
1-2| Align the position of the overflow drain with the floor drain and ensure that the compartment size corresponds to requirements.
1- 3| Mark the location of the anchor point screws.
1- 4| Remove the installation template and screw in the anchor points in the marked locations.

| 2-1|

  • Assemble the drain on the bathtub.
  • Use the overflow assembly provided for the junction to the drain T-joint. Ensure watertightness. This operation is much easier to complete when the bathtub rests on its side. Place a cover or protective cardboard on the floor before positioning the bathtub on its side.

---|---|---
2-2| If necessary, cut the overflow pipe to the desired length, and glue it to the PVC connector and to the drain.
2-3| Apply a joint of silicone under the edge of the base of the bathtub.

EVANESCENCE 6634 & EVANESCENCE OVAL 5936, 6636, 7440 INSTALLATION

2-3| Install the bathtub on the anchor points fastened to the floor and immediately wipe away any excess silicone. Connect the drain.
---|---
2-4|

  • Install the turbine according to the instructions in the TURBINE – REMOTE MOUNTING INSTALLATION section of the Owner’s Manual.
  • The air inlet is located to the right of the bathtub drain and, if applicable, control and option connection cables to the right.
  • Connect control and option cables if applicable. For Geysair-equipped baths, also run the water hose and electrical wiring through the floor.

2-5| For Geysair-equipped baths, connect the Geysair electrical wire supplied with the male connector with the turbine cable equipped with the female connector. Test for grounding continuity between the bath grounding terminal  and the bath power supply. Failure to perform the grounding continuity test could result in serious personal injury.

NOTE :To install the Evanescence Freestanding on a concrete slab with no place for the passage of the air inlet pipe to the bath-tub: drill a hole 1 5/8 inches in diameter in the skirt.

IMPORTANT : Drill the hole 1 1/2 inches above floor level and protect the bathtub with a piece of wood placed behind the location to be drilled.

  • 1 800 463.2187
  • From 8 a.m. to 6 p.m. Monday to Thursday (EST) . From 8 a.m. to 5 p.m. on Friday (EST)
  • Printed in Canada. Copyright © July 2022 Bains Ultra Inc.® All rights reserved. 45200599
  • www.bainultra.com
  • Printed in Canada. Copyright © September 2022 Bains Ultra Inc.® All rights reserved. 45200599
  • Some products, specifications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

BainUltra User Manuals

Related Manuals