GivEnergy GIV-BAT 9.5 Lithium Iron Phosphate Battery Installation Guide
- June 15, 2024
- GivEnergy
Table of Contents
LITHIUM IRON PHOSPHATE
BATTERY INSTALLATION MANUAL
GENERATION 2 Giv-Bat 9.5
SPECIFICATIONS
BIGGER AND BETTER
Increased storage and efficiency
The 9.5kWh battery pack sits alongside our AC Coupled or Hybrid
Inverter so that you can store energy from the grid or excess generation.
Utilising lithium iron phosphate, our batteries are extremely safe and can be
installed in a wide range of locations. Our battery warranty means you can use
your battery as much as you need for 10 years and still be covered.
Specifications
Dimensions…………….. 800H x 242D x 480W (mm)
Weight…………………… 110 K g
Usable capacity………… 9.5 kWh / 186 Ah
Voltage…………………… 51.2V DC
Current…………………… 80A
Warranty…………………… 12 years
Operating temperature………… -10o C to 55 oC
Operating voltage range………… 45V – 58V DC
Depth of Discharge………… 100%
BOX CONTENTS
Item | Item Name | Qty |
---|---|---|
A | Battery Module | Battery Module |
B | Wall Mounting Bracket | Wall Mounting Bracket |
C | Fixing Kit | Fixing Kit |
D | Waterproof Blanking Plug | Waterproof Blanking Plug |
GENERAL INFORMATION
Introduction
All information contained in this booklet refers to the assembly,
installation, commissioning, and maintenance of Generation 2 batteries. Please
retain this manual for future reference.
Legal Disclaimer: This document is the property of GivEnergy, reproduction is
prohibited.
Installation Requirements
Installation of all GivEnergy equipment must be carried out by a GivEnergy
approved installer.
Unit Information
The Generation 2 batteries are designed to work with a GivEnergy AC Coupled or
Hybrid Inverter. The batteries work with renewable generation or import from
the grid at off-peak times when prices are lower, and discharge during busier
periods when prices are more expensive.
Storing the Battery
The units must be stored in their original packaging at temperatures between
-30ºC – 60ºC. Please note that between -10ºC – 0ºC there may be reduced
performance in charging and discharging.
Do not stack more than 4 units on top of each other.
Packaging Contents
When unpacking, please check the following:
There are no missing accessories from the packaging list
The model and specification of the battery’s nameplate match the order
specifications
If any damaged or missing parts are found, please contact GivEnergy on 01377
252 874 or email support@givenergy.co.uk
immediately. Returns must be provided in original or equivalent packaging. The
cardboard packaging is recyclable.
Item | Item Name | Function |
---|---|---|
A | ON/OFF Switch | System Switch |
B | STATUS | Status Indicators |
C | Power Terminal | Power Connectors |
D | DC MCB Breaker | Battery Isolator |
E | Dip Switches | Dip Switch |
F | Earthing Point | Earth Bonding |
BATTERY CABLES
Two types of cables exist for connection to Gen 2 batteries;
Lug to plug battery cable
Plug to plug battery
cable
IMPORTANT
All Generation 2 battery cables need to be purchased seperately.
SAFETY AND INSTALLATION
Safety Instructions
Extra care and attention must be taken when installing and maintaining any
GivEnergy equipment.
The system is capable of lethal voltages, even when disconnected
If you suspect something is wrong with the battery, contact GivEnergy on 01377
252 874 or email support@givenergy.co.uk.
If any damaged or missing parts are found, please contact GivEnergy on 01377
252 874 or email support@givenergy.co.uk
immediately. Returns must be provided in original or equivalent packaging. The
cardboard packaging is recyclable.
Installation Instructions
All electrical installations must be carried out by a qualified and registered
electrician and in accordance with the IEE Wiring Regulations
Ensure batteries are always fixed to the wall using the mounting bracket, even
when the weight of the product is on the floor
All GivEnergy equipment must be installed by a GivEnergy approved installer
Externally mounted batteries must always be wall mounted above the frost-line
or a minimum of 50mm
An earth bond must be installed between all batteries and inverters
Do not remove the front cover unless instructed by the GivEnergy support team
| Do not use the battery if there are any deformities, such as bulging or
leakages
---|---
| Do not puncture the battery
| Do not throw the battery or use forceful impact
| Do not attempt to repair the battery yourself (please call your Approved
Installer)
| The battery must be installed vertically, never install horizontally, avoid
tilting the unit
STEP-BY-STEP INSTALLATION
-
Place the wall mounting bracket horizontally onto the wall and mark the position of the bracket holes.
-
Drill 6 holes at the marked positions, at least 75mm deep. Fix the mounting bracket to the wall using 6 expansion bolts.
-
Mount the battery onto the mounting bracket. For Generation 1 Inverters only
-
4A. Connect output A to the inverter using a lug to plug cable. If not connecting to additional battery packs, apply the blanking plug to output B.
For Generation 2 Inverters only
4B. If multiple Generation 2 batteries are installed, connect output B of the first battery to output A on the additional battery packs using a plug to plug cable. There must be no more than 5 batteries installed. For Generation 3 Inverters only
4C. If connecting to Generation 3 inverter, use a plug to plug cable from output A of the Generation 2 battery to the connectors within the Generation 3 inverter. For installing additional batteries
4D. If connecting a Generation 1 battery to a Generation 2 battery use a plug to lug cable and connect from output B in your Generation 2 battery into the comms connection within the Generation 1 battery, and set your dip switches as per instructed within the GivEnergy installation guide.4E. If connecting a Generation 2 battery to a Generation 2 battery use a plug to plug cable and connect from output B in your master battery into output A of your slave Generation 2 battery, and set your dip switches as per step 5 (below).
-
Set up the dipswitches on the circuit breaker, as shown below.
-
Push the ‘On/Off’ button on the right hand side of the battery, the LEDs will light up.
-
Commission the battery on the online portal and ensure the battery is operating normally.
DIP SWITCHES AND STATUS INDICATORS
Dip Switches Status Indicators What does the STATUS light mean?
Green | Healthy, good state of charge (SOC) |
---|---|
Amber/Green, flashing | Firmware update |
Green, flashing | Lower state of charge, outside of normal operating voltage |
Red, flashing | Very low state of charge |
Red | Fault. Logged in system. If the light is red, call GivEnergy for remote |
diagnostics.
GivEnergy is the main supplier and manufacturer of the product. GivEnergy warrants that your product is (a) of acceptable quality and (b) does not have any latent defects.
- If you suspect something is wrong with the battery, contact GivEnergy on 01377 252 874 or email support@givenergy.co.uk.
- If any damaged or missing parts are found, please contact GivEnergy on 01377 252 874 or email support@givenergy.co.uk immediately. Returns must be provided in original or equivalent packaging. The cardboard packaging is recyclable.
Products Covered
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>