BlauHoff BLH-5KW Battery LFP Battery for Home Energy Storage System User Manual
- June 4, 2024
- BlauHoff
Table of Contents
- BLH-5KW Battery LFP Battery for Home Energy Storage System
- Specifications
- Interface and protection functions
- Operating Environment
- Packaging, transportation, and storage requirements
- Installation and configuration
- Communication
- Troubleshooting
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
BLH-5KW Battery LFP Battery for Home Energy Storage System
User Manual
BLH-5KW Battery LFP Battery for Home Energy Storage System
Dear customer,
This is your BlauHoff BLH-5KW Battery LFP battery for the home energy storage
system. We provide safe, well-designed, and high-performance standard LFP
battery packs for you. The battery pack is compact, easy to install, free of
maintenance, and used as the building block of energy storage systems by
assembling in parallel. It is widely applied in home applications, small
commercial and industrial energy storage systems as well as Telecom stations.
This manual contains all the information necessary to install, use and
maintain the LFP battery. We kindly ask you to read this manual carefully
before using the product.
This manual is meant for the installer and the user of the LFP battery.
Only trained and qualified staff may install and perform maintenance on the
LFP battery.
The boundaries of its use, as described in this manual should be kept in mind.
The LFP battery may not be used in medical or aviation-related applications.
The LFP battery may not be used for any purposes other than described in this
manual. Using the LFP battery for any other purpose will be considered
improper use and will void the warranty of the product. BlauHoff cannot be
held responsible for any damage caused by improper, incorrect, or unwise use
of the product. Read and understand this manual completely before using the
product. During the use of the product, user safety should always be ensured,
so installers, users, service personnel, and third parties can safely use the
LFP battery.
This is the original manual, keep it in a safe location! Please consult
info@blauhoff.com for the latest version of all
manuals.
Before Using
Read and understand the following instructions:
warning
- This equipment may only be installed, operated, and maintained by trained and qualified staff.
- The local safety regulations and relevant operating procedures must be observed during the installation, operation, and maintenance of the equipment, otherwise the equipment may be damaged. The safety precautions mentioned in the manual are only intended to supplement of local safety regulations.
Caution
- Do not dispose of batteries In a fire. The batteries may explode.
- Do not open or mutilate batteries. Released electrolyte is harmful to the skin and eyes. It may be toxic.
- A battery can present a risk of electric shock and burns by high short-circuit current.
- Failed batteries can reach temperatures that exceed the burn thresholds for touchable surfaces. The following precautions should be observed when working on batteries: a) Disconnect the charging source before connecting or disconnecting battery terminals;
b) do not wear any metal objects including watches and rings;
c) do not lay tools or metal parts on top of batteries; and in addition, when the battery maintenance cannot be performed by an ordinary person, the following applies) use tools with insulated handles;e) wear rubber gloves and boots;
If determine it the battery is other intentionally or in between by grounded contact with any part of a grounded battery can result in electric shock and burns by high short-circuit current. the risk of such hazards can be reduced if the ground is removed during installation and maintenance by a skilled person.
- before moving or reconnecting the running system. the power must be off and the system should be shut down, otherwise, there will be a risk of electric shock.
- Do not expose the Li-ion battery to the heat of the fire in case of fire, place using a dry powder fire extinguisher.
- Do not dismantle any part of the system without contacting bytes or bytes authorized technical engineer. system failure caused by such will not be covered by the warranty.
Danger
- Keep the Li-ion battery away from water, dust, and contamination, otherwise, it may cause an explosion or other dangers and may even lead to personal injury.
- Do not short-circuit the Li-ion battery.
- Observe the plus (+) and minus (-) marks on the Li-ion battery and equipment and ensure correct use. Do not reverse-connect the Li-ion battery.
- Do not dismantle, crush, puncture, open, or shred the Li-ion battery.
- Before moving or reconnecting the running system, the power must be off and the system should be shut down, otherwise there will be a risk of electric shock.
- Do not expose the Li-ion battery to heat or fire. In case of fire, please use a dry powder fire extinguisher.
- Do not dismantle any part of the system without contacting PYTES or PYTES authorized technical engineers. System failure caused by such will not be covered by the warranty
Specifications
Table 1-1 Battery Pack Specifications
Battery Model | BLH-5KW |
---|---|
Chemistry | LFP |
Nominal Voltage | 51.2V |
Voltage Range | 47.5V-57.6V |
Nominal Capacity | 100Ah |
Nominal Energy | 5.12kWh |
Unit Dimension | L440mm W620mm H117mm(2.6U) |
Unit Weight | 51kg |
Standard Charge/Discharge Current | 50A |
Maximum Charge/Discharge Current | 50A |
Peak Current | 102A@15s |
Round-Trip Efficiency | ≥95% |
Communication Protocol | RS232, RS485, CAN |
Cycle Life | ≥6000cycles@0.5C/0.5C, 25℃ |
Calendar Life | ≥10 years |
Operating Temperature | Charge: 0℃~ 45℃, Discharge: -10℃~ |
50℃
Certificates| UL1973, IEC62619 / UN38.3
Storage Temperature| Within 1 month: -20~55°C
1-3months: -20~35°C
3-12months: 20~25°C
1.1 Product standard configuration
Items | Quantity | Specifications | Pictures |
---|---|---|---|
BLH-5KW | 1pcs | 51.2V/100Ah LFP pack; including BMS, three interfaces |
(CAN/RS-485/RS232), 2 Link ports, LED power indicator and insulated coating
metal case.|
Power Cable| 1set| Connect battery to battery; 0.2m; Positive and
negative|
Communicate Cable| 1pcs| Connect battery to battery; 0.2m; CAN or
RS485 communicate|
Earthing cable| 1pcs| 1m|
1.2 BMS function
Protection and Alarm | Management and Monitor |
---|---|
Charge/Discharge End | Cell Balance |
Charge over Voltage | Intelligent Charge Model |
Charge/Discharge Over Current | Charge/Discharge Current Limit |
High/Low Temperature | Capacity Retention Calculate |
Short Circuit | Administrator Monitor |
Power Cable Reverse | Operation Records |
Interface and protection functions
2.1 Battery front panel schematic
2.2 Components
No. | Name | Label | Functions description |
---|---|---|---|
1 | Ground | Grounding | |
2 | Power button | POWER | Power button. When switched to “ON”, the system can be |
activated by the “SW” key or external power supply; when switched to “OFF”,
the system is off.
3| Soft start switch| SW| Press and hold this button for 1 second while the
switch key is “ON” to enter Start or Sleep mode
4| DIP switch| ADD| Select the match manufacturer, see the match list(appendix
A)
5| Running lights| RUN| Green lights. The lights flash when Standby. The
lights are constantly on when charging. The lights flash when
discharging.
Alarm indicator| ALM| Red light. The lights flash when the Alarm. The lights
are constantly on when protected.
Capacity indicator| CHARGE| A total of 6 green lights showing
battery capacity, each
representing 16.7% of SOC.
6| External CAN communication port| CAN| Communication with external devices
7| External RS-485 communication port| RS485| Communication with external
devices
8| Cascade terminal| Link Port| Used for master-slave cascade communication.
Connected with a standard direct-connected network cable, the master is
connected to PORT1, and the slave is connected to PORT0.
9| Input and output interface (negative)| | Negative input and output
interface
10| Input and output interface (positive)| | Positive input and output
interface
Operating Environment
✧ Battery operating environment requirements:
✧ Operating Temperature: -10℃~55℃
✧ Relative Humidity: 20%-80%, no condensation
✧ Altitude: <4000m
✧ Site environment requirements: Keep away from the heat source, avoid direct
sunlight, no corrosive gas, no explosive gas, no insulating gas, no insulating
conductive dust.
✧ Installed in a cabinet that shall not be opened without a tool or
✧ install in a restricted access area.
Packaging, transportation, and storage requirements
4.1 Transportation
Always check all applicable local, national, and international regulations
before transporting an LFP battery.
During transportation, protected the battery from severe vibration, shock, or
squeezing during transportation, as well as prevents sun and rain.
During the loading and unloading process, the battery should be handled
lightly and protected against falling, rolling, and heavy pressure.
4.2 Storage
Follow the storage instructions in this manual to optimize the lifespan of the
LFP battery during storage. If these instructions are not followed and the LFP
battery has no charge remaining when it is checked, consider it to be damaged.
Do not attempt to recharge or use it. Replace it with a new LFP battery.
See previous storage temperature conditions. The self-discharge of the LFP
battery is 1-2% per month. Keep the battery SOC to 40%-60% during storage.
Disconnect the LFP battery from all loads and, if present, the charging
device. Store the battery in a cool and dry place without direct sunshine.
Keep the battery away from corrosive substances, inflammable and explosive
material as well as hazardous gases. For long-term storage (> 6 months),
charge the LFP battery to more than 80% of its rated capacity before storage.
The battery needs to be recharged every 6 months to more than 80% of the rated
capacity.
40%-60% during storage. Disconnect the LFP battery from all loads and, if present, the charging device. Store the battery in a cool and dry place without direct sunshine. Keep the battery away from corrosive substances, inflammable and explosive material as well as hazardous gases. For long-term storage (> 6 months), charge the LFP battery to more than 80% of its rated capacity before storage. The battery needs to be recharged every 6 months to more than 80% of the rated capacity.
Installation and configuration
5.1 Installation Preparation
5.1.1 Safety Requirements
Only those who have been trained in the power system and have a good knowledge
of the power system are allowed to install the device.
Always observe local safety regulations and the safety requirements listed
below during the installation process.
Before installing or removing the device, make sure that the power system is
not powered and that the battery device is turned off.
Distribution cabling should be reasonable and with protective measures to
avoid being touched during operation.
5.1.2 Checking the operating environment
The operating environment should meet the requirements described in Chapter 3,
“Operating Environment”. Otherwise, it needs to be adjusted and re-examined.
5.1.3 Tools
The tools that may be used are shown in Table 5-1.
Table 5-1 Tool
Tools
Screwdriver (Slotted, Phillips)| Multimeter
Wrench| clip-on ammeter
Diagonal pliers| Insulating tape
Thermometer| Pliers
Anti-static wrist ring| Clip Pliers
Tapes| Strippers
5.1.4 Technical preparation
Electrical interface settings:
If the battery is connected to the user device directly, please check:
✧ Whether the DC charging interface of the energy storage inverter meets the
charging voltage and current requirements in Table 1-1 Battery Pack
Specifications.
✧ Whether the power of the electrical equipment matches the parameters listed
in “Table 1-1 Battery Pack Specifications”; Security check:
Fire-fighting equipment such as portable dry powder fire extinguishers should be available near the equipment. Do not place dangerous materials such as flammable or explosive ones near the battery.
5.2 Unpacking
✧ When the battery arrives at the installation site, it must be loaded and
unloaded properly and prevented from direct sunshine and rain. Before
installation, check if there is any component missing according to the
packing list attached in the packing box and check whether the box appearance
is intact;
✧ Carefully handling during the unpacking. Protect the insulated coating on
the case surface;
✧ Check the LFP battery for damage after unpacking. If there is any damage,
contact BlauHoff or your reseller.
5.3 The preparatory work
- Make sure the POWER buttons of all batteries are OFF.
- Ensure the charging voltage of power supply equipment is DC57.5±0.1V;
- All power supplies should be off.
5.4 Installation
5.4.1 Install the battery
The BLH-5KW can be installed either vertically or horizontally. In this
chapter, it’s main instructions for horizontal installation such as:
installation in a 19-inch cabinet. Vertical installation is similar. All
equipment must be placed steadily during installation.
5.4.2 Connect Ground cable
Unscrew the screw at the grounding hole on the front panel of the battery,
wrap the ground cable around the screw, and tighten it with a screwdriver.
Connect the other end of the ground cable to a reliable ground point.
External Bi-polar over current protection devices and Bi-polar external
isolator shall be equipped
The minimum diameter must be >10awg
Note: The grounding resistance should be less than 0.1Ω.
5.4.3 Connecting the power cable
Before connecting the power cable, connect and disconnect the cable to
identify the positive and negative terminal, then make a mark respectively.
After the cable is connected, measure whether there is a short-circuit or
reverse connection.
Select the correct line based on your load by reference to the table below
AWG
| Area| Standard Current| Max. current
---|---|---|---
(kcmil)| (mm²)| ( A )| ( A )
5| 33.1| 16.8| 66.2| 75.5
6| 26.3| 13.3| 52.5| 59.9
7| 20.8| 10.5| 41.6| 47.5
8| 16.5| 8.37| 33| 37.7
9| 13.1| 6.63| 26.2| 29.8
10| 10.4| 5.26| 20.8| 23.7
It should be >10 AWG.
Connecting the power cables:
(1) Power cable connection instructions of Single-Rack:
✧ Single battery:
✧ Connect the positive and negative poles of the battery to the positive
and negative terminal of the DC port of the energy storage inverter (or the
junction box) with a red and black cable respectively.
✧ Multiple batteries (Max number 8):
The connection between batteries, as well as between the battery and ESS
inverter are parallel. First, connect the two positive terminals of adjacent
batteries with the red cable; and the two negative terminals of adjacent
batteries with the black cable; then connect the positive and negative
terminal of the battery with the positive terminal of the DC port of the
energy storage inverter (or the junction box) with a red and black cable
respectively;
The capacity can be increased by connecting the batteries in parallel, but due
to the limitations of BMS and the power cable we supply, only two batteries
can be connected in parallel and a bus bar should be used for connecting them
together.
Warning: Batteries connected in series are forbidden, high voltage would lead to hazard shock.
2. Power cable connection instructions of Multi-Rack:
Collect the positive and negative power cables respectively by the bus bar or
junction box, then connect two racks in parallel.
The length, thickness, material, and resistance of the cables connected in
parallel must be the same.
Note: When the cable is inserted into the positive and negative terminals
of the battery and “Click”, the cable is firmly connected.
Before pulling out the cable, press the small button next to the terminal.
When multiple batteries are connected in parallel, in order to reduce the
influence of the circular current, the overall positive and negative output
cables can be connected from different batteries.
Figure 5-1 Schematic diagram of battery connection
Note: The battery must be placed in a locked cabinet or room, a 5cm cooling gap is reserved when installing the battery, and each layer of the battery cabinet should have a load capacity of more than 100kg.
5.4.4 Connecting communication cables
Single battery: Choose the port to be inserted according to the communication
protocol (RS485/CAN/RS232) between the battery and ESS inverter, then insert
the communication cables to the port;
Multiple batteries: The host and the slave communicate in cascade mode: one is
the host and the rest are the slaves. Please refer to the following picture
for the cascade connection. Users need to inset communication cables to
relevant link ports between batteries and be aware that:
- The host Link Port 0 must be kept free;
- The end slave Link Port 1 must be kept free;
Note: The system may not be able to communicate if not follow the instruction.
Table 5-3 LED indications
Battery status| Protection / Alarm Normal| RUN| ALM| Capacity LED|
Descriptions
---|---|---|---|---|---
| | | | | | |
Shut down| | OFF| OFF| OFF| OFF| OFF| OFF| OFF| OFF| All off
Power-on| Normal| ON| ON| ON| ON| ON| ON| ON| ON| All light on one second at
the same time.
Standby| Normal| Flash 1| OFF| OFF| OFF| OFF| OFF| OFF| OFF| Indication
standby
Alarm| OFF| Flash 3| OFF| OFF| OFF| OFF| OFF| OFF| Battery low voltage
Charging| Normal|
Light
|
OFF
| Base on capacity|
Alarm| Light| Flash 3
Protection| OFF| Light| OFF| OFF| OFF| OFF| OFF| OFF| Stop charging, protect
start
Discharge| Normal|
Flash 3
|
Flash 3
| Base on capacity|
Alarm| Flash 3| Flash 3|
Protection| OFF| Light| OFF| OFF| OFF| OFF| OFF| OFF| Stop discharge, protect
start
Note: The flashing instructions, flash 1-0.25s light/3.75s off; flash 2-0.5s light/0.5s off; flash 3-0.5s light/1.5s off.
Communication
There are RS-232C, RS485, and CAN communication ports on the battery. The battery status can be obtained and the battery’s internal parameters can be modified via a host computer.
CAN
CAN communication Terminal (RJ45 port) follows CAN protocol, to output battery
information.
RS485
RS485 Communication Terminal:(RJ45 port) follow RS485 protocol, to output
battery information.
RS232
RS232 Communication Terminal:(RJ45 port) follow RS232 protocol, to upgrade the
software and communicate with your PC.
Link Port 0,1
Link Port0,1 Communication Terminal:(RJ45 port) follow CAN/RS485 protocol, to
communicate between multiple parallel batteries.
6.1 RS232 port
Default baud rate of RS-232C ports: 115200bps.
Table 6-1 RS232 Connector Pin Assignments
Pin number | RS-232C port |
---|---|
1 | GND |
2 | TXD |
3 | RXD |
4 | GND |
6.2 RS485 port and CAN port.
Default baud rate of RS-485 port: 9600bps
Default baud rate of CAN port: 500K
Table 6-2 RS485 and CAN Connector Pin Assignments
Pin number
| Serial|
CAN
---|---|---
1| RS485B| —
2| RS485A| GND
3| GND| —
4| —| CANH
5| —| CANAL
6| GND| —
7| RS485A| —
8| RS485B| —
Troubleshooting
Please refer to the troubleshooting methods mentioned below.
Please read the “Table 5 -3 LED indication” of this manual before
troubleshooting to prevent false operations. For example, it doesn’t indicate
the battery is faulty if the ALM alarm red light on the front panel is
blinking or constantly on. When there is an “alarm” indication, it usually
works well and needs no troubleshooting. When there is a “protection”
indication, the battery will work normally automatically after the
“protection” status is released.
Warning: Do not repair the battery if no authorization from BlauHoff!
7.1 Unable to start
Problem | Troubleshooting Steps | Solution |
---|
Press the POWER button to the “ON” state and press the SW button for 1
second, but the LED indicator doesn’t respond or all the LEDs are off after
1S.| 1. Confirm that the POWER the button remains in the “ON” state;
2. Charge the battery correctly and observe if the battery can be charged
properly.| 1. If the battery enters charging mode, the battery can return to
normal after charging.
2. If not, please contact the local reseller or BlauHoff.
7.2 Unable to charge
Problem | Troubleshooting Steps | Solution |
---|---|---|
The battery cannot be charged properly when the battery is not fully charged. |
1. Confirm that the battery is turned on;
2. Check the power cord. Confirm that the power cables are correctly
connected and the charging circuit is correct;
3. Check the battery indicator LED to see if the battery is under the
“Protection” state. If so, unplug the battery power cord, find the cause of
the protection, and fix the problem, then restart the battery;
4. Check if the charging voltage meets the battery charging requirements. If
not, adjust the power supply voltage to the proper range.| If the battery
still does not charge properly after following the above steps, please
contact the local reseller or BlauHoff.
7.3 Unable to discharge
Problem | Troubleshooting Steps | Solution |
---|---|---|
The battery cannot be discharged properly. | 1. Confirm that the battery is |
turned on;
2. Check the power cables to ensure that they are properly connected.
3. Unplug the battery power cable and measure
the battery power output voltage. If the battery
voltage is too low, charge it immediately.
4. Check the battery indicator LED to see if the battery is in a “Protection”
state. If so, unplug the battery power cables, find the cause of the
protection, and fix the problem, then restart the battery;| If the battery
still does not discharge properly after following the above steps, please
contact the local reseller or BlauHoff.
7.4 ALM indicator is always on
When the ALM indicator is constantly red and the other indicators are off, the
battery is in the “Protection” state. When the condition-triggered protection
is released, the battery will automatically return to normal operation. There
are a few issues requiring immediate measures.
Problem | Troubleshooting Steps | Solution |
---|---|---|
The ALM indicator is constantly red and all other indicators are off. | 1. |
Check the power cables to ensure that they
are properly connected.
2. Check whether the charging voltage, charging/discharging current,
battery/cell voltage, and temperature meet the relevant protection conditions,
and release the “protection” state to ensure that the voltage, current, and
temperature are within the normal working range.| If the battery protection
state cannot be released, or the ALM indicator s constantly on when the
battery is properly charged after it is restarted, please contact your local
reseller or BlauHoff.
7.5 Battery designation
EXAMPLE 1 –ICP200/1 50/150/[7S]E/0+50/75 would designate a battery composed of
7S connected prismatic Li-ion secondary cells, with a cobalt-based positive
electrode. Its cell maximum thickness is between 199 mm and 200mm, its cell
maximum width is between 149 mm and 150 mm, and its cell overall height is
between 149 mm and 150 mm. It is designed for a low discharge rate over a long
period. Its low-temperature grade is 0°C. Its high-temperature grade is +50
°C. Its capacity after 500 cycles to rated capacity is between 75 % and 79 %.
EXAMPLE 2 —NR54/222[4P3S]H/-20+50/80 would designate a battery composed of 4P- 3S connected cylindrical Li-ion secondary cells, with a nickel-based positive electrode. Its cell maximum diameter is between 53mm and 54 mm, and its cell overall height is between 221 mm and 222 mm. It is designed for a high discharge rate. Its low-temperature grade is -20 °C. Its high-temperature grade is +50 C. Its capacity after 500 cycles to rated capacity is between 80 % and 84%.
Warranty Card
Battery model| | Inverter brand/model|
Battery quantity| | Inverter quantity|
Battery using time| | Inverter using time|
PV arrays power| | on-grid/off-grid|
Problem description (Including fault tine, weather, condition, Inverter error
code. etc
Photos of the battery wiring
Photos of Inverter wiring and panels
The right of interpretation belongs to BlauHoff.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>