HG POWER HI-150AE 6 Inch Inline Duct Fan User Manual

June 15, 2024
HG POWER

Mixed-Flow Inline Duct Fan
PRODUCT MANUAL

HI-150AE 6 Inch Inline Duct Fan

INSTALLATION INSTRUCTIONS

Part 1, How to unloose the clips?

Part 2 , How to install the fan?

Tips: The order of the third and fourth steps are interchangeable.

PRODUCT PARAMETERS

Model HI-150AE HI-160AE HI-200AE
Duct Diameter 150mm/6″ 160mm/6.3″ 200mm/8″
Motor EC EC EC
Material Used (housing) ABS ABS ABS
Power Supply AC 100-240V AC 100-240V AC 100-240V
Frequency(Hz) 60 60 60
Power(Watt) 77 77 110
Current(A) 0.7-1.4 0.7-1.4 1.0-2.0
Air Pressure(Pa) 542 542 485
Rotational Speed(RPM) 4300 4300 3500
Air Volume(m3/h) 798 798 1292
Air Volume(CFM) 469 469 760
Noise(dB) 55 55 73
Net Weight 2kg/4.41b 2kg/4.41b 2.7kg/5.9Ib
Power Cord Length 1m/3.3ft 1m/3.3f1 1m/3.3ft
Protection Class IP44 IP44 IP44
Use Environment -20 60 k -20C-60C -20C -60 C

WIRING INSTRUCTIONS

EC motor(size 074,line-fed)

Instructions Manual
Thank you for your purchase of the company products. It has been manufactured following current technical safety regulations and in compliance with EC standard.
Please read this instructions booklet carefully before installing or starting up the product. It contains important information on personal and user safety measures to be followed while installing, using and carrying out maintenance work  on the equipment. Once the product has been installed, please hand in this booklet to the end user.
Check that the apparatus is in perfect condition while unpacking. Any fault or damage caused in origin is covered by the our company guarantee.
Please make sure that the apparatus coincides with the product you have ordered and that the details on the instructions plate fulfill your necessities.
Transport and manipulation

  • The packaging used for this apparatus has been designed to support normal transporting conditions. The apparatus must always be transported in its original packaging as not doing so could deform or damage the product.

  • The product should be stored in a dry place in its original packaging, protected from dust and dirt until it is installed in its final location. Do not accept delivery if the apparatus is not in its original packaging or shows clear signs of  having been manipulated in any way.

  • Do not place heavy weights on the packed product and avoid knocking or dropping it.
    Important information for the safety of installers and user.

  • Installation must only be carried out by qualified persons.

  • Make sure that the installation complies with each country’s current mechanical and electrical norms.

  • Once ready to use, the apparatus must fulfill the following standard:
    • Standard for Low Pressure Installments 2014/35 EU
    • Standard for Electromagnetic Compatibility 2014/30 EU

  • Ventilators, or apparatus that include them, have been designed to move the air in the area stipulated on their characteristics plate. * This apparatus must not be used in explosive or corrosive atmospheres.

  • If a ventilator is going to be installed to extract air from premises where a boiler or other combustion apparatus are installed, make sure that the building has sufficient air intakes to assure adequate combustion. The extractor outlet  must not be connected to a duct used exhaust smoke or fumes from any appliance that uses gas or any other type of fuel.

  • This appliance is not intended for use by young children or infirm persons unless they have been adequately supervised by a responsible person to ensure that they can use the appliance safely. Young children should be supervised to  ensure that they do not play with the appliance.
    Safety during installation.

    • Make sure there are no loose elements near the ventilator, as they could run the risk of being sucked up by it. If it is going to be installed in a duct, check that it is clean of any element that could be sucked up by the ventilator.
    • When installing an apparatus, make sure that all the fittings are in place and that the structure which supports it is resistant enough to bear its weight at full functioning power.
    • Before manipulating the apparatus, make sure the mains supply is disconnected, even if the machine is switched off.
    • Check that the mains supply voltage and frequency values coincide with the stipulations on the characteristics plate.
    • The electrical installation must include a double pole switch with a contact clearance of at least 3 mm, correctly sized and in accordance with the electrical standards of the country of installation.
    • Please follow the connections diagram for the electrical connections.
    • If an earth connection is necessary, check that it correctly connected and that adequate thermal and overloading protection has been connected and adjusted to the corresponding limits.
    • If an earth connection is necessary, check that it correctly connected and that adequate thermal and overloading protection has been connected and adjusted to the corresponding limits.
    • If a ventilator is installed in a duct, the duct must be exclusively for the ventilation system.

Starting up.
Before starting up the machine, make sure that:

  • The apparatus is well secured and the electrical connections have been carried out correctly.

  • The safety devices have been adequately connected.

  • No loose material or fitting remains can be sucked up by the ventilator.
    If the ventilator has been mounted in a duct, make sure it is clear of loose material.

  • The earth fittings are adequately connected.

  • The electrical safety devices are correctly connected, adequately adjusted and ready for use.

  • The wire and electrical connections inputs are correctly sealed and water-tight.
    When starting up the marching, make sure that:

  • The propeller turns in the correct direction.

  • There are no abnormal vibrations.

  • If circuit protection device tripping operation, the apparatus must be quickly disconnected from the mains supply. The whole installation should be carefully checked before trying to start up the machine again.

Maintenance.

  • Before manipulating the ventilator, make sure it is disconnected from the mains supply even if it has previously been switched off. Prevent the possibility of anyone else connecting it while it is being manipulated.
  • The apparatus must be regularly inspected. These inspections should be carried out bearing in mind the machine’s working conditions, in order to avoid dirt or dust accumulating on the propeller, turbine, motor or grids. This could be dangerous and perceptibly shorten the working life of the ventilator unit.
  • While cleaning, great care should be taken not to unstable the propeller or turbine.
  • All maintenance and repair work should be carried out in strict compliance with each country’s current safety regulations.

Recycling.
EEC Standards, together with the responsibility we should assume with future generations in mind, oblige us to recycle all the materials we can.
Therefore, please deposit all left-over material and packaging in their corresponding recycling containers and hand in the replaced machines to the nearest handler of this type of waste product.
If you have any queries about the products, please contact our after-sales service.

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals