- General
- Safety instructions
- Other
- Preparations before installation
- Installation steps
- Inspection after installation
- Charging
- Emergency operation
- Product transportation and storage
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
CENNTRO AUTOMOTIVE CORPORATION DC1001 DC Electric Vehicle Charging
Station
Legal Notices
- This document is an integral part of the “Charging Infrastructure” technical document and is protected by copyright. Any use outside the strict limits of copyright law is prohibited without written consent.
- This also applies to reproductions, translations, photographic versions of documents, and preservation of processed documents using electronic media.
- Any party that violates this regulation is obliged to compensate for the loss!
General
Purpose of the document
The purpose of this document is to guide the construction personnel to
complete the on-site installation of the UFC180 US standard all-in-one DC
charging station.
Scope of application
-
This manual applies to equipment types
UFC180 US standard all-in-one DC charging station -
This manual is suitable for the following groups of people
UFC180 US standard all-in-one DC charging station installer
Definition of relevant warning symbols
No. | Mark | Meaning |
---|---|---|
**** |
| A “WARNING” sign indicates a hazard.
Pay attention to procedures, practices, or incorrect execution that may result in personal injury or death. Actions following the WARNING mark should only be performed if the indicated conditions are fully understood and met.
|
| A “CAUTION” sign indicates a hazard.
Be aware of product damage or destruction that may result from operating
procedures, experiments or incorrect execution, and operations following the
“CAUTION” mark should only be performed when the indicated conditions are
fully understood and met.
| | Indicates a burn hazard arising from hot areas or areas with high
component temperatures
| | protective earth connection
| | AC current
|
| Indicates that the described operations must be performed using employer- supplied clothing and/or personal protective equipment
Table 1 Definitions of related warning symbols
Safety Precautions
For Both FCC & IC application
This device complies with Part 15 of the FCC Rules / Industry Canada licence-
exempt
RSS standard(s). Operation is subject to the following two conditions
- This device may not cause harmful interference, and
- This device must accept any interference received, including interference that may cause undesired operation.
Changes or modifications not expressly approved by the party responsible for
compliance could void the user’s authority to operate the equipment.
This equipment has been tested and found to comply with the limits for a Class
A digital device, pursuant to part 15 of the FCC Rules. These limits are
designed to provide reasonable protection against harmful interference when
the equipment is operated in a commercial environment. This equipment
generates, uses, and can radiate radio frequency energy and, if not installed
and used in accordance with the instruction manual, may cause harmful
interference to radio communications. Operation of this equipment in a
residential area is likely to cause harmful interference in which case the
user will be required to correct the interference at his own expense.
MPE Requirements
- To satisfy FCC / IC RF exposure requirements, a separation distance of 20 cm or more should be maintained between the antenna of this device and persons during device operation.
- To ensure compliance, operations at closer than this distance is not recommended.
Before starting the operation, please read the operation instructions and
precautions carefully to reduce accidents. The “Caution, Caution, Warning,
Danger” items in the product and product manual do not represent all safety
items that should be observed, but are only supplements to various operational
safety precautions.
When operating the company’s products and equipment, you must abide by the
safety regulations of the relevant industry, and strictly abide by the
relevant equipment precautions and special safety instructions provided by the
company.
Warning
This equipment is not intended for use in a residential environment and may
not provide adequate protection for radio reception in such environments.
Safety instructions
The internal working voltage of the charging system is high and the current is large. In order to ensure personal safety, the following regulations should be observed at all times
TOOL
Warning
This equipment is not intended for use in a residential environment and may
not provide adequate protection for radio reception in such environments.
Thunderstorm
Danger
- It is strictly forbidden to use high voltage and alternating current in thunderstorm weather.
- During thunderstorms, strong electromagnetic fields are generated in the atmosphere. Therefore, in order to avoid lightning damage to the equipment, it is necessary to do a good grounding of the equipment in time.
Static electricity
Notice
The static electricity generated by the human body will damage the
electrostatic sensitive components on the circuit board, such as large-scale
integrated circuits (IC). Before touching the equipment, holding plug-in
boards, circuit boards, IC chips, etc., you must wear an anti-static bracelet
and ground the other end of the anti-static bracelet to prevent static
electricity from damaging sensitive components.
Short circuit
Danger
It is strictly forbidden to short-circuit the positive and negative poles of
the power distribution system or short-circuit the non-grounded poles to the
ground during operation. A short circuit will cause equipment burns and
personal safety hazards.
- When performing live work, the polarity of cables and interface terminals must be strictly checked.
- The power distribution operation space is compact, so please pay attention to select the operation space before any operation.
- Operation must use insulated tools.
- When operating with electricity, you must pay attention to keeping your hands, wrists, and arms in a tense state, so as to prevent accidents caused by too much movement of the tool or human body when the tool slips.
Other
Object sharp corner
Warning
When carrying the equipment by hand, wear protective gloves to prevent cuts
from sharp objects.
Power cable
- Notice
Before connecting the cables, verify that the cable labels are correct.
Signal line
- Notice
Signal cables should be bundled separately from power cables, with a spacing of at least 15mm.
Preparations before installation
Environmental conditions
When selecting an installation site for charging equipment, the environmental
conditions listed in the table below should be considered.
Environmental Conditions | Recommended Range |
---|---|
Ambient temperature | -30℃~﹢50℃, use with derating above 50℃ |
Altitude | ≤2000m |
Humidity | 5%~95%RH, no condensation inside the product; |
Dust | ≤1mg/m3 |
Corrosive substances | Free from pollutants such as salt, acid, smoke, etc. |
Shock | ≤1.5mm/s |
Insects, pests, vermin, termites | None |
Mold | None |
Damp | Rainproof |
Table 2 Installation Environment Confirmation Form
Conventional construction tools
Table 3 List of conventional construction tools
Note: The above tools need to be selected according to the actual situation on site.
Construction materials
Cables
Refer to the table below to select the corresponding terminals according to
different wire diameters.
Wire Diameter | Terminal Model |
---|---|
6AWG(13.3mm²) | SC16-6/SC16-8 |
4AWG(21.15mm²) | SC25-6/SC25-8 |
3AWG(26.67mm²) | SC25-6/SC25-8 |
2AWG(33.62mm²) | SC35-8 |
1AWG(42.41mm²) | SC50-8 |
1/0AWG(53.49mm²) | SC50-8 |
2/0AWG(67.43mm²) | SC70-8/SC70-10 |
3/0AWG(85.01mm²) | SC95-8/SC95-10 |
4/0AWG(107.22mm²) | SC120-10/SC120-12 |
Table 4 Cable Diameter Comparison Terminal Table
Network cable
If you need to use the Ethernet communication function, it is recommended to
use a shielded twisted-pair network cable (cat6a) and RJ45 crystal plug. The
length of the network cable shall not exceed 75m. If it exceeds 75m, the
customer needs to customize the construction plan according to the site
conditions.
Other materials
- Heat-shrinkable tubes, insulating tapes and other auxiliary materials required for making cables.
- If the fuse is damaged, it is necessary to replace the model with the same specification, the fuse specification is 350A,AC1250V/DC1000V
Installer Requirements
- Entering the construction site should abide by the construction site safety management regulations.
- When entering the construction site, you must correctly wear a safety helmet (fasten the chin strap, the safety helmet is in good condition), do not wear unsafe clothing such as loose clothing and slippers, and are strictly prohibited from drinking to work and smoking on the construction site.
- High-altitude workers must wear safety helmets, hang seat belts, wear non-slip shoes, and fasten labor tools.
- If the construction site is dusty or there is painting work, protective masks must be worn.
- Do not enter the hoisting area, below the vertical operation and other dangerous areas, and place objects to strike.
- Try to stay away from various mechanical equipment and electrical circuits to prevent mechanical and electrical damage.
- Those who use mobile power tools must master their use skills and precautions, wear insulating shoes and gloves as much as possible, and the metal shell must be grounded or zero-connected.
- For temporary electricity use on site, the electrical box must be kept intact, and damaged electrical components must be replaced in time.
- Rubber cables should be used for temporary on-site wires, plastic flower wires are prohibited, and wires are not allowed to be directly inserted into sockets.
- Try to avoid live work.
- When entering the foundation pit, roof and other marginal places and various openings, you must concentrate your energy to prevent falling from heights.
- Pay attention to the ground environment conditions such as iron nails and steel bars, and prevent other injuries such as sticking, touching, hanging and falling.
- Site construction protection facilities, safety signs, warning signs, etc. shall not be dismantled without authorization.
- Strengthen the on-site maintenance of construction equipment, maintain the intact rate, and prohibit the operation with illness and overload operation.
Handover of construction drawings
After the installer arrives at the site, first ask the store staff to check
the installation location drawings of the equipment, and check to confirm that
the cables and cement foundations of each equipment meet the requirements.
Spacing requirements for equipment
-
Maintenance distance requirements
When the back or side of the charging pile to be installed is close to the wall or other obstacles, a certain maintenance distance needs to be reserved. Please refer to Figure 1 below for the installation distance of the base, and please refer to Figure 2 for the maintenance distance with the door open. The charging pile adopts left and right ventilation and heat dissipation, the air enters from the right and the air exits from the left, refer to Figure 3. Figure 1 Base Installation Distance Diagram Figure 2 Maintenance distance map Figure 3 Schematic diagram of wind direction -
Parking space requirements
When the charging station is installed in the middle of a parking space or back-to-back parking spaces, it is recommended to leave a space of 1200mm between the car wheel block and the charging station to facilitate the use of the charging pile, as shown in Figure 4
Figure 4 Parking distance requirements
Power cable recommendation
- UFC180 US standard DC charging pile recommends using cables with a voltage level of 480V or higher, Use Copper Conductors Only, and the cables should reach a temperature resistance level of at least 90°C. The installer confirms whether shielding is required according to local laws or regulations. If there is a shielding layer, both ends of the shielding network must be connected to the PE wire.
- The power distribution input wire diameter of the charging pile is recommended not to be lower than the following recommended values. If the wire diameter does not comply with laws and regulations, please refer to the requirements of local laws and regulations.
Phase sequence | L1 | L2 | L3 |
---|---|---|---|
60kW | 3AWG(26.67mm²) | 3AWG(26.67mm²) | 3AWG(26.67mm²) |
90kW | 2AWG(33.62mm²) | 2AWG(33.62mm²) | 2AWG(33.62mm²) |
120kW | 1/0AWG(53.49mm²) | 1/0AWG(53.49mm ²) | 1/0AWG(53.49mm²) |
150kW | 1/0AWG(53.49mm²) | 1/0AWG(53.49mm ²) | 1/0AWG(53.49mm²) |
180kW | 2/0AWG(67.43mm²) | 2/0AWG(67.43mm ²) | 2/0AWG(67.43mm²) |
PE | Torque (N/m) | ||
--- | --- | ||
5AWG(16.77mm²) | 4.8~6 | ||
3AWG(26.67mm²) | 4.8~6 | ||
2 AWG(33.62mm²) | 4.8~6 | ||
2 AWG(33.62mm²) | 4.8~6 | ||
1 AWG(42.41mm²) | 4.8~6 |
Note: The housing grounding torque is 8-10N/m.
Requirements for cement foundation
The cement foundation needs to be poured before the installation of the
charging pile. The size of the cement foundation must be greater than
W1000mmD700mmH600mm, and the depth of the foundation is 600mm. The design of
the cement foundation can be adjusted according to the user’s requirements and
the actual situation on site. The schematic diagram of the cement foundation
is shown in Figure 5, and the basic inspection requirements are as follows
- Pay attention to the correction level when pouring the foundation.
- The foundation installation is higher than the ground level, and necessary maintenance passages are reserved on site depending on the specific space.
- The drainage outlet on the foundation surface is slightly inclined to avoid water accumulation.
- The foundation is filled with C25 concrete.
- On the basis, reserve a wire outlet hole with a diameter of not less than 60mm, and adjust it according to the actual wire diameter. As shown in Figure 4.
- After the foundation is completed, use a level to test the flatness.
- Four M12 screw rods are used for fixed pre-embedding, which are pre-embedded into the interior of the concrete foundation according to the positioning of the drawing, and 30-40mm threads on the upper surface of the concrete foundation are exposed.
1 | ground | 3 | cable outlet |
---|---|---|---|
2 | cement base | 4 | M12 threaded rod |
Figure: Schematic diagram of the cement base of the charging station
Current and distribution capacity requirements
Please confirm the relevant information requirements of the distribution
network according to the table below, and proceed according to the recommended
circuit breaker selection requirements
Charging station specification| Distribution grid voltage| Wiring
form| Grid capacity| Rated current
---|---|---|---|---
60kW| 480Vac,50/60Hz| L1+L2+L3+PE| ≥75kVA| 76A
90kW| 480Vac,50/60Hz| L1+L2+L3+PE| ≥100kVA| 114A
120kW| 480Vac,50/60Hz| L1+L2+L3+PE| ≥150kVA| 152A
150kW| 480Vac,50/60Hz| L1+L2+L3+PE| ≥180kVA| 190A
180kW| 480Vac,50/60Hz| L1+L2+L3+PE| ≥200kVA| 228A
Circuit breaker selection| Remark
---|---
Ue=480V,≥100A,Icu≥Ics≥40kA,3P|
Ue=480V,≥160A,Icu≥Ics≥40kA,3P|
Ue=480V,≥200A,Icu≥Ics≥40kA,3P|
Ue=480V,≥250A,Icu≥Ics≥40kA,3P|
Ue=480V,≥250A,Icu≥Ics≥40kA,3P|
Grounding/Insulation Resistance Requirements
- Check the civil engineering grounding resistance test report to ensure that the resistance value of the grounding grid produced on site must be ≤4Ω.
- Check the civil engineering insulation resistance test report to ensure that the insulation resistance of the cable is ≥10MΩ.
Important: The above requirements are the minimum requirements for this equipment, and the specific standards are subject to local laws and regulations.
Installation steps
Unpacking and unpacking inspection
Equipment packing list
Name | Package | Configure | random document | Parts List |
---|---|---|---|---|
**** Device body | **** wooden box | **** Standard |
- **** certificate
- Certificate of
- Qualification
- Factory inspection report
- Installation manual (electronic version)
|
- **** key
- RFID card
- Module solid
- screw
- U disk
- print line
Rectifier module| Carton| **** Standard| | The quantity will be configured according to the actual power
Unpacking inspection
- Check the packing list number and equipment quantity.
- Check the equipment nameplate information.
- Check whether the random files are complete.
- Check whether the spare parts and accessories are complete.
- Check the factory inspection report and certificate of conformity.
- Check whether the appearance of the equipment is good, and whether there is deformation, bumps, stains, etc.
Unpacking precautions
- The installer shall unpack in the presence of the owner, and fill in the unpacking record in detail. See Appendix 1 for the unpacking record sheet.
- After unpacking and checking, please ask the owner’s representative to confirm and sign on the equipment unpacking record sheet.
- If problems are found during the unpacking and acceptance of the equipment, in addition to making records, wait for the negotiation between the owner and the supplier.
Product parts introduction
- The components of the product façade are shown in Figure 6 and Figure 7
- The internal structure diagram of the product is shown in Figure 8
Figure 6 Front view of components
A1 | Rings | A2 | Waterproof gland A | A3 | DC meter window | A4 | Gun wire support |
---|---|---|---|---|---|---|---|
A5 | emergency button | A6 | right door lock | A7 | gun mount | A8 | Charger |
A9 | gun stock | A1 0 | louver grid | A11 | front door lock | A12 | indicator light |
A13 | indicator light | A1 4 | indicator light | A15 | touch screen | A16 | |
A17 | A1 8 | A19 | A20 |
Figure 7 Side member view
B1| 4G antenna module| B2| Waterproof gland A| B3| DC meter window| B4| Gun
wire support
---|---|---|---|---|---|---|---
B5| Left door lock| B6| gun mount| B7| Charger| B8| gun stock
B9| louver grid| B10| Nameplate| B11| | |
Figure 8 Internal component diagram
C1| PDU module| C2| Terminals| C3| Intermediate relay| C4| Auxiliary power
supply C
---|---|---|---|---|---|---|---
C5| Auxiliary power supply B| C6| miniature circuit breaker A| C7| Surge
Protector A| C8| Miniature circuit breaker B
C9| Molded case circuit breaker| C10| Auxiliary power supply A| | | |
| | | | | | |
Figure 9 Right component diagram
D1| charging module| D2| AC contactor| D3| Quick release buckle| |
---|---|---|---|---|---|---|---
Figure 10 left component diagram
E1 | cooling fan | E2 | Terminals |
---|
Equipment installation and fixing and wiring
Installation dimensions
The installation size of the equipment is: 1964mm × 800 mm × 493 mm, and the
external dimensions are shown in below Figure.
Figure11. Schematic diagram of installation dimensions
Unboxing
- Open the top cover Figure 12: Open the top cover
- Remove the left and right side boards Figure 13: Dismantling the left and right side boards
- Remove the front and rear planks
Figure 14: Before and after removal of wooden planks
Unloading
There are two ways of unloading, you can choose to use the hoisting method or
the liftable forklift method to transport the charging station
-
Lift the charging station with a crane and confirm that the four lifting rings are in a tightened state Figure 15: Lifting the charging pile
-
Remove the tray, and use a No. 19 socket wrench to loosen the M12 screws on the cabinet and tray Figure 16: Diagram of removing the tray
-
Confirm that the four lifting rings are tightened, pass the rope through the rings, and lift the charging pile with a crane.
Note : If you need to install the swing arm, please remove the lifting ring after lifting. Figure 17 Lifting the charging station -
Lift the charging pile, make it fall steadily and slowly, align with the pre-embedded threaded rod, until it falls to the installation base. Make sure that the cables have entered the cabinet along the cable protection cover. Figure 18 Schematic diagram of cabinet placement
-
Use M12 nuts and flat and spring washers to fix the charging pile, lock these nuts, and the recommended torque is 95.5N•m.
-
Lead the cables into the cabinet through the cable glands.
Wiring
- Open the cabinet doors on both sides, insert the module into the module compartment, make sure that the module identification corresponds to the label attached to the module compartment, and lock the power module with 4 M4×12 combination screws, the recommended torque is 95N·m. Figure 19 Power module installation diagram
- Before wiring, confirm that the leakage protection of the circuit breaker and the air switch should be in the OFF position. Figure 20 Leakage protection and air switch
- Access the power cord
- Please select the power cable according to the requirements in Chapter 2.6, and connect it with reference to Figure 21. At the same time, make sure that the cable is not broken, damaged or scratched.
- Note : PE needs to be connected to the grounding copper bar Figure 21 Wiring diagram
- The multimeter selects the resistance on-off position ( ),
- Check whether there is a short circuit between +12V and -12V, between L1, L2, L3, and PE. Figure 21 The multimeter detects whether there is a short circuit
- Warning : Must be carried out in accordance with the specifications and correct operation steps. Improper execution may result in personal injury or death.
- IT system firmware requirements
The IT system needs to refresh the new firmware to turn off the input PE detection.
Inspection after installation
Installation wiring check
Equipment and equipment fixing inspection
- The appearance of the charging pile is clean and tidy, there is no bump damage, the position is consistent with the base, and it is firmly fixed without loosening.
- The orientation of the equipment meets the installation standards.
- There is no leakage of equipment installation accessories.
- The book review of the level measuring equipment meets the specified requirements.
Cable laying and connection inspection
- Check whether the cable insulation is scratched or damaged.
- Check whether the power cable terminals are compliant and the wiring is firm.
- Check that the communication cable terminals are correct and not loose.
- Check for hanging cable labels.
- Check whether the cable bending radius meets the requirements.
- Check whether the electrical grounding is reliable.
Check before power-on
- Before powering on the equipment, check whether the power supply voltage at the upper end of the plastic-cased air circuit breaker at the low-voltage power distribution cabinet is normal, and there are no abnormalities such as phase loss, overvoltage, under voltage, and phase sequence. The circuit breaker, leakage protection and air switch should be in the OFF position, as shown in the figure below.
Figure 22 Turn off the circuit breaker, leakage protection, air switch
- After ensuring that the charging pile is installed stably and the wire connection is reliable, etc., the charging station can be powered on.
Power-on check
Connect the main switch of the external AC power supply of the charging
pile. Turn on the circuit breaker, leakage protection and air switch. (The
door is open, the fault light is on, and the buzzer sounds.) .
Figure 23 Open circuit breaker, leakage protection, air switch
- Close the cabinet door (the fault indicator light is off at this time, and the buzzer stops beeping.)
Figure 24 Close the cabinet door
- The screen enters the startup interface, and the green light is on. (Note: Please refer to the table below for the detailed description of the indicator lights on the light board)
Figure 25 The screen display after power on
Charging
Display introduction
Figure 26. Home page introduction
Initial Setup
-
The administrator interface configures the network Description: How to change the password?
Log in to the administrator interface, select “Basic Settings” and click the “Password” button
Enter the six-digit old password, new password, and confirm the new password (Figure 30), click “Confirm” and the modification is successful -
network configuration
After entering the management interface, select “Network”
Support WIFI, 4G, Ethernet
The signal icon in the upper right corner of the screen is displayed as the
corresponding networking mode (as shown in Figure 31), that is, the network
connection is successful
Figure 31. Network configuration success signal icon
WIFI Set
- Step1: Select WIFI > Click Refresh
- Step2: Enter WIFI password > Next to confirm
4G Set
- Step1: Select 4G > Set the corresponding parameters
- Step2: Confirm to switch to 4G network
Ethernet set
Select Ethernet > Tick Obtain Automatically/Set IP Address Manually > Confirm
Connection
Figure 36 Select Ethernet
OCPP platform connection
After the configuration of the charging pile network is completed, it will
automatically connect to the OCPP platform within 60s. After the connection is
successful, the OCPP icon on the screen will light up (as shown in Figure 37
Charging process
-
Take out the plug gun, insert the charging gun into the charging port of the vehicle, and the screen icon changes at this time (as shown in Figure 38 and Figure 39)
-
After inserting the gun, click the “start” button and select the payment method Support RFID activation, APP scanning code activation, POS credit card activation (optional)
- Click the ” ” button on the home page of the App to scan the QR code (Note: For details on how to use other functions of the APP, please refer to the APP instruction manual)
-
Select the charging mode
Support SOC mode, time mode, power mode, fast charging mode-
- After the App scans the QR code, it enters the charging mode and payment method selection (Note: Please refer to the App instruction for detailed App usage)
-
Figure 43 Charging mode selection – App operation interface
Click to select SOC mode/time mode/power mode
- Enter the percentage of electricity required for this vehicle (%)/the required charging time for this time (min)/the required electricity for this charging (kwh) (as shown in Figure 44)
- Click to start charging
- SOC mod e: Enter the percentage of electricity that the vehicle needs to reach this time (%)
- Power mode : the power required for this charging (kwh)
- Click to select the fast charging mode to start charging immediately
charging
- Check vehicle charging details in real time (as shown in Figure 46)
- Charging will end automatically after it is fully charged / click the “STOP” button to end charging in advance
(Note: When using the App to charge, you need to operate the “STOP” button on the App)
Figure 46. Charging interface
Pay the order and view the order details (as shown in Figure 48)
- When choosing an RFID card, you need to swipe the card again to pay (as shown in Figure 47)
- When choosing an app, the payment will be automatically completed in the credit card/debit card bound to the app in the app
No need to operate when selecting the pos machine, the payment will be completed automatically after the charging stops
After charging is complete, pull out the charging plug and put it back in place
Power Off & Shutdown
After charging, disconnect the leakage protection and the air switch, and then
power off the main brake. 6.3.1 Turn the door lock handle to the left to open
the cabinet door.
Illustrate
- If you need to charge again, you need to reinsert the gun
- When one gun of the charging pile is charging and the other guns are not connected
Figure 49 Open the cabinet door
Turn off the circuit breaker and air switch.
Figure 50 Off switch
Close the cabinet door, turn the door lock handle to the right, and lock the cabinet door.
Figure 51 Close the cabinet door
Emergency operation
Emergency stop function
Refer to this section only when there is an abnormality or Misoperation
In case of emergency, quickly remove the transparent protective cover, press
the red “emergency stop button”, and the system will cut off the output power.
Do not use the “emergency stop button” during normal shutdown
Position of emergency stop button
Emergency stop reset
Turn the emergency stop button clockwise to reset
Product transportation and storage
Our products will be shipped with the charging post fixed on a pallet, using
pearl cotton and wrapped tightly around any parts that may come into contact
with it. During the transportation process, please take it lightly, do not
drop it, do not make violent impact on it.
When storing the product, please put it in a dry environment and store it in
an ambient temperature between -40℃~85℃. The storage place should be kept
clean and ventilated.
Completion data
No. | file name | Page | Document necessity |
---|---|---|---|
1 | unpacking record sheet | 1 | √ |
2 | Pre-Installation Checklist | 1 | √ |
- Fix the gun line to the swing arm line card.
- Use the cardan shaft fixing bracket to fix the cardan shaft to the short shaft of the swing arm.
- Fix the 2 chucks to the cardan shaft with pins.
- Put the gun line rubber ring on the gun line about 2m away from the gun line outlet, and snap the gun line rubber ring to the left bracket of the line holder.
- Hang the left bracket of the wire support on the chuck.
- Close the right bracket and the left bracket of the wire support, and lock them with M4 screws and M4 nuts.
- The gun line is fixed.
- Recommended distance: the distance from the gun head to the line card of the swing arm is 5 meters.
Attached Figure 3 is a diagram of the cable position and distance of the line card
Appendix 2 Unpacking record sheet
Unpacking record sheet
Dealer store name| | Unpacking date|
Serial No.| Name of Goods| Actual goods| Qty| Certificate No.| Equipment|
Remarks
1| | | | | |
2| | | | | |
3| | | | | |
4| | | | | |
5| | | | | |
6| | | | | |
7| | | | | |
8| | | | | |
9| | | | | |
10| | | | | |
Unpacking conclusion|
signature field| Installation Unit| | Owner unit|
Appendix 3 Pre-installation checklist
Pre-installation checklist
Project name
Civil construction| Equipment installation unit
Sub-project| No.| Main acceptance items| Acceptance record| Treatment measures
Installation plan| 1| Whether the installation of on-site equipment conforms
to the design drawings of the construction plan| |
Distribution box circuit breaker| 1| Meet the equipment installation
requirements (the minimum input current of the equipment is 92A)| |
Cable type Cement foundation| 1| YJV-0.6/1kV-370 mm² +270mm²| |
2| Network cable cat6a (if Ethernet communication is required)| |
maintenance channel Sub-project| 1| Dimensions meet the requirements| |
2| The foundation bolts meet the requirements of chapter 2.6 in the
installation manual| |
Installation plan| 1| Maintenance access meets the equipment spacing
requirements in Section 2.7| |
Conclusion
Note
- The acceptance record is filled with “√” or “×” according to the on-site situation;
- The conclusion is filled with “qualified” or “required rectification” according to the on-site situation
Signature of the person in charge of inspection :
Date:
Appendix 4 List of Toxic and Hazardous Substances and Elements
**** Part Name | Toxic and hazardous substances or elements |
---|---|
**** Lead | **** Hg |
**** polybrominated diphenyl ethers
Pb| Hg| Cd| Cr6+| PBB| PBDE
Cabinet/subr ack/copper bar| ○| ○| ○| ○| ○| ○
charging module| ○| ○| ○| ○| ○| ○
monitoring module| ○| ○| ○| ○| ○| ○
Power distribution device| ○| ○| ○| ○| ○| ○
made board| ○| ○| ○| ○| ○| ○
Hardware| ○| ○| ○| ○| ○| ○
cable| ○| ○| ○| ○| ○| ○
- ○ : Indicates that the content of the toxic and hazardous substance in all homogeneous materials of the part is below the limit requirement stipulated in SJ/T-11363-2006
- ×: Indicates that the content of the toxic and hazardous substance in at least one homogeneous material of the part exceeds the limit requirement stipulated in SJ/T11363-2006
The following components or applications contain toxic and hazardous substances, which cannot be reliably replaced or mature solutions are limited by the current technical level
- Solder Contains Lead
- Copper alloys contain lead
- The contacts of the switch contain cadmium
- Mercury in backlight tubes; lead in glass
Explanation on the environmental protection use period: the environmental
protection use period of this product (marked on the product body) refers to
the toxic and harmful substances contained in this product from the date of
production under normal use conditions and compliance with the safety
precautions of this product. The period during which a substance or element
will not have serious effects on the environment, persons and property
Scope of application: integrated AC double connector charging station
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>