Safety Precautions

General Disclaimer

  • The information in this quick installation guide is subject to change due to product updates or other reasons. This guide cannot replace the product labels or the safety precautions in the user manual unless otherwise specified. All descriptions here are for guidance only.
  • Before installations, read through the quick installation guide. For additional information, please see the user manual.
  • All operations should be performed by trained and knowledgeable technicians who are familiar with local standards and safety regulations.
  • Check the deliverables for correct model, complete contents, and intact appearance. Contact the manufacturer if any damage is found or any component is missing.
  • Use insulating tools and wear personal protective equipment when operating the equipment to ensure personal safety. Wear anti-static gloves, clothes, and wrist strip when touching electronic components to protect the equipment from damage. The manufacturer shall not be liable for any damage caused by static electricity.
  • Strictly follow the installation, operation, and configuration instructions in this guide and user manual. The manufacturer shall not be liable for equipment damage or personal injury if you do not follow the instructions. For more warranty details, please visit https://en.goodwe.com/warranty.

Safety Disclaimer

WARNING

  • Disconnect the solar communication box with the utility grid when installing or maintaining the device to avoid electric shock.
  • Do not touch the live parts like the internal components or cables when the equipment is working to avoid electric shock.
  • Disconnect the equipment with the utility grid before replacing the internal components with a new component that meets requirements. The manufacturer shall not be liable for equipment damage or personal injury if you do not follow the instructions.
  • Do not connect or disconnect any cables when the equipment is working.
  • Make sure that the voltage and current of the AC input cable match the nominal voltage and current of the equipment. The manufacturer shall not be liable for equipment damage if you do not follow the instructions. Warning labels on the device are as follows.GOODWE-SCB3000A-Solar-Communication-Box-FIG-1

Check before Power-on

No. Check Item
1 The product is firmly installed at a clean place that is well-ventilated

and easy to-

operate.

2| The PE, AC input, RS485 communication cable, PLC communication cable, and optical

fiber cables are connected correctly and securely.

3| Cable ties are intact, routed properly and evenly.
4| Unused ports and terminals are sealed.

LED Indicator

GOODWE-SCB3000A-Solar-Communication-Box-FIG-2

Port Status Description

POWER

| ON| The power supply is normal.
OFF| The power supply is abnormal.


RUN

| Blinking (1 second ON, 1second OFF)| ****

The device is working normally.

ON or OFF| The device cannot work normally.



SERVER

| ON| The network is normal.
Blinking (1

second ON, 1 second OFF)

| The connection to the router is normal, but the connection to the server fails.
OFF| The network is abnormal.


PC

| ON| The device is connected to the computer and the ProMate app.
OFF| The device is not connected to the computer or the ProMate app.





COM1

| ON| The actual number of inverters collected by the communication box is equal to that set by the ProMate app.
Blinking (1 second ON, 1second OFF)| The actual number of inverters collected by the communication box is smaller than that set by the ProMate app.
Blinking (1

second ON, 3 seconds OFF)

| The number of inverters to be collected was not set by the ProMate app.
OFF| The communication box cannot collect any inverter data.





COM2

| ON| The actual number of inverters collected by the communication box is equal to that set by the ProMate app.
Blinking (1

second ON, 1 second OFF)

| The actual number of inverters collected by the communication box is smaller than that set by the ProMate app.
Blinking (1

second ON, 3 seconds OFF)

| The number of inverters to be collected was not set by the ProMate app.
OFF| The communication box cannot collect any inverter data.
Port| Status| Description
---|---|---





COM3

| ON| The actual number of inverters collected by the communication box is equal to that set by the ProMate app.
Blinking (1

second ON, 1 seconds OFF)

| The actual number of inverters collected by the communication box is smaller than that set by the ProMate app.
Blinking (1

second ON, 3 seconds OFF)

| ****

The communication box cannot collect any inverter data.

OFF| The inverter data is not collected.


COM4

| ON| Communication with third-party devices like environmental monitoring equipment is normal.
OFF| Not connected to third-party devices like environmental monitoring equipment.

Product Introduction

Parts and Dimensions

GOODWE-SCB3000A-Solar-Communication-Box-FIG-3

  1. PE cable hole 2. Three-phase AC input
  2. Cable hole 3.
  3. RS485 communication cable and network cable hole
  4. Optical fiber cable hole
  5. Ventilation valve
  6. Reserved
  7. Single-phase AC input Cable hole
  8. PE Terminal

Installing the Communication Box

Packing List

GOODWE-SCB3000A-Solar-Communication-Box-FIG-4

Space Requirements

GOODWE-SCB3000A-Solar-Communication-Box-FIG-5

Angle Requirements

GOODWE-SCB3000A-Solar-Communication-Box-FIG-7

Installing the Communication Box

GOODWE-SCB3000A-Solar-Communication-Box-FIG-8

Electrical Connection

Opening the Cabinet Door

  • Contact the after sales service center to get the key.

GOODWE-SCB3000A-Solar-Communication-Box-FIG-9

Internal Components

SCB3000A

GOODWE-SCB3000A-Solar-Communication-Box-FIG-10

SCB3000B

GOODWE-SCB3000A-Solar-Communication-Box-FIG-11

  1. Grounding busbar
  2. Single-phase AC input switch
  3. Three-phase AC input switch
  4. Three-phase AC input Terminal
  5. Single-phase AC input Terminal
  6. RS485 Communication PE Terminal
  7. RS485 Communication Terminal (with the inverter)
  8. Fiber splice tray
  9. Data logger
  10. RS485 Communication Terminal (with the inverter or a third party device)
  11. Power adapter
  12. Network port

PE connection outside of the box

GOODWE-SCB3000A-Solar-Communication-Box-FIG-12

PE connection inside of the box

GOODWE-SCB3000A-Solar-Communication-Box-FIG-13

Three-phase AC input Cable

GOODWE-SCB3000A-Solar-Communication-Box-FIG-14

Single-phase AC input Cable

GOODWE-SCB3000A-Solar-Communication-Box-FIG-15

Network Cable

GOODWE-SCB3000A-Solar-Communication-Box-FIG-16

NO. Color
1 White & Orange
2 Orange
3 White & Green
4 Blue
5 White & Blue
6 Green
7 White & Brown
8 Brown

Connecting the RS485 Communication Cable (with the inverter)
Use OT terminals to crimp the shielding layer of the STP. Insert the cable into the communication cable grounding port.

No. Type Port No. Type Port
1

SCB3000A& SCB3000B

| RS485 A| 5|

SCB3000B

| RS485 A
2| RS485 B| 6| RS485 B
3| RS485 A| 7| RS485 A
4| RS485 B| 8| RS485 B

GOODWE-SCB3000A-Solar-Communication-Box-FIG-17

Connecting RS485 Communication Cables (with the inverter or a third party device)

Silk Screen Type Port

COM3

| RS485 A|

Connect with the inverter.

RS485 B

COM4

| RS485 A| Connect with a third party device like the environmental monitor and so on.

Contact after-sale service for this specific function Contact after-

sale service to connect the environmental monitor.

RS485 B

Connecting RS485 Communication Cables (with the inverter or a third party device)

Silk Screen Type Port

COM3

| RS485 A|

Connect with the inverter.

RS485 B

COM4

| RS485 A| Connect with a third party device like the environmental monitor and so on.

Contact after-sale service for this specific function Contact after-

sale service to connect the environmental monitor.

RS485 B

GOODWE-SCB3000A-Solar-Communication-Box-FIG-18

Optical Fiber Cable
Optical fiber cables should be connected by professional technicians.

Power On and Off

Power ON

  • Turn on 1 → 2

Power OFF

  • Turn off 2 → 1

Closing the Cabinet Door

GOODWE-SCB3000A-Solar-Communication-Box-FIG-20

Commissioning

Commissioning via ProMate Software

Monitoring via SEMS Portal App

GOODWE-SCB3000A-Solar-Communication-Box-FIG-21

For more details, scan the QR code below to read the user manual.

  • SCB3000A & SCB3000B User Manual
  • Official Website

GoodWe Technologies Co., Ltd.
No. 90 Zijin Rd., New District, Suzhou, 215011, China

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals