EBAA IRON 1504 Series 1500 Bell Restraint Harness Instruction Manual
- June 13, 2024
- EBAA Iron
Table of Contents
- EBAA IRON 1504 Series 1500 Bell Restraint Harness
- Product Information
- Product Usage Instructions
- Features and Applications
- Sample Specification
- Pressure Ratings (C900)
- Packaged Items
- Series 1500 Submittal Reference Drawing
- Installation Instructions
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
EBAA IRON 1504 Series 1500 Bell Restraint Harness
Product Information
The Series 1500 Bell Restraint Harness is designed for restraining push-on PVC pipe bells. It features a split, serrated restraint ring on the spigot and a split serrated ring behind the bell. The harness is available in different series and sizes to accommodate various pipe dimensions.
Pressure Ratings (C900)
Pipe Size | Number | Shipping Weight | Class 200 | Class 150 | Class 100 |
---|---|---|---|---|---|
4 | 1504 | 14.8 | 200 | 200 | 100 |
6 | 1506 | 22.5 | 200 | 200 | 100 |
8 | 1508 | 33.2 | 200 | 200 | 100 |
10 | 1510 | 57.2 | 200 | 200 | 100 |
12 | 1512 | 62.7 | 200 | 200 | 100 |
Note: For applications or pressures other than those shown, please contact EBAA for assistance.
Packaged Items
- 0322 – H
- Sample Specification
- Series 1500 Submittal Reference Drawing
- EBAA IRON
- MADE IN USA
Dimensions (in inches)
Nominal Pipe Size| Series Number| Pipe O.D.| Maximum Bell O.D. Cleared| Max.
Restraint O.D. (Casing Clearance)| Overall Length| Thrust Bolt (Number-Size)
---|---|---|---|---|---|---
4| 1504| 4.80| 6.75| 9.25| 13| 4-3/4″
6| 1506| 6.90| 8.75| 11.25| 18| 4-3/4″
8| 1508| 9.05| 12.25| 14.75| 18| 4-3/4″
10| 1510| 11.10| 14.20| 16.85| 22| 4-3/4″
12| 1512| 13.20| 16.90| 19.45| 22| 4-3/4″
Note: Dimensions are subject to change without notice.
Product Usage Instructions
- The Series 1500 is designed for restraining push-on PVC pipe bells. It has a split, serrated restraint ring on the spigot and a split serrated ring behind the bell.
- Assemble the push-on joint per the pipe manufacturer’s instructions.
- Install both halves of the serrated ring around the pipe behind the bell, tapping each half into place. Make sure that the complete ID of the ring is touching the pipe before installing the side bolts. Install the side bolts and tighten evenly to 110 ft-lbs. of torque (60 ft-lbs on 4 inch and 6 inch).
- Remove the side bolts from the second serrated restraint ring. Use the Thrust Bolts to determine the proper location of the restraint ring on the spigot. Allow enough room on the thrust bolt to fully engage the nuts.
- Install both halves of the restraint ring at the proper location, tapping each half into place. Make sure that the complete ID of the ring is touching the pipe before installing the side bolts. Tighten the side bolts evenly to 110 ft-lbs. (60 ft-lbs on 4 and 6).
- Place nuts on the thrust bolts and tighten until they are snug. Allow enough room on the thrust bolts to fully engage the nuts. Do not tighten these bolts enough to force the spigot further into the bell of the joint.
Features and Applications
-
For use on AWWA C900 PVC pipe bells
-
Minimum 2 to 1 Safety Factor
-
MEGA-BOND®
Restraint Coating System
For more information regarding MEGA-BOND refer to www.ebaa.com -
Split design for ease of installation
-
Constructed of ASTM A536 ductile iron
-
Available in accessory packages
-
For use on water or wastewater pipe-lines subject to hydrostatic pressure and tested in accordance with either AWWA C600 or ASTM D2774
Sample Specification
Restraint for PVC pipe bell (AWWA C900) shall consist of the following: The
restraint shall be manufactured
of ductile iron conforming to ASTM A536. The restraint devices shall be coated
with MEGA-BOND. (For complete specifications on MEGA-BOND visit www.
ebaa.com.) Side clamp bolts shall be of SAE J429 Grade 5 material. A split
serrated ring shall be used behind the pipe bell. A split serrated ring shall
also be used to grip the pipe, and a sufficient number of bolts shall be used
to connect the bell ring and the gripping ring. The combination shall have a
pressure rating as shown in the adjacent table. The restraint shall be the
Series 1500, as manufactured by EBAA Iron, Inc., or approved equal.
Pressure Ratings (C900)
Nominal | Series | Approximate | DR 14 | DR 18 | DR 25 |
---|---|---|---|---|---|
Pipe Size | Number | Shipping Weight | Class 200 | Class 150 | Class 100 |
4 | 1504 | 14.8 | 200 | 200 | 100 |
6 | 1506 | 22.5 | 200 | 200 | 100 |
8 | 1508 | 33.2 | 200 | 200 | 100 |
10 | 1510 | 57.2 | 200 | 200 | 100 |
12 | 1512 | 62.7 | 200 | 200 | 100 |
NOTE: For applications or pressures other than those shown, please contact EBAA for assistance.
Packaged Items
Series 1500 Submittal Reference Drawing
| A| B| C| D|
---|---|---|---|---|---
Nominal| Series| Pipe| Maximum Bell| Max. Restraint
O.D.| Overall| Thrust Bolt
Pipe Size| Number| O.D.| O.D. Cleared| (Casing
Clearance)| Length| (Number- Size)
4| 1504| 4.80| 6.75| 9.25| 13| 2 – ¾ x 13
6| 1506| 6.90| 8.75| 11.25| 18| 2 – ¾ x 18
8| 1508| 9.05| 12.25| 14.75| 18| 2 – ¾ x 18
10| 1510| 11.10| 14.20| 16.85| 22| 4 – ¾ x 22
12| 1512| 13.20| 16.90| 19.45| 22| 4 – ¾ x 22
Installation Instructions
NOTE: Dimensions are in inches and are subject to change without notice.
- The Series 1500 is designed for restraining push-on PVC pipe bells. It has a split, ser-rated restraint ring on the spigot and a split serrated ring behind the bell.
- Assemble the push-on joint per the pipe manufacturer’s instructions.
- Install both halves of the serrated ring around the pipe behind the bell, tapping each half into place. Make sure that the complete ID of the ring is touching the pipe before installing the side bolts. Install the side bolts and tighten evenly to 110 ft-lbs. of torque. (60 ft-lbs on 4 inch and 6 inch)
- Remove the side bolts from the second serrated restraint ring. Use the Thrust Bolts to determine the proper location of the restraint ring on the spigot. Allow enough room on the thrust bolt to fully engage the nuts.
- Install both halves of the restraint ring at the proper location, tapping each half into place. Make sure that the complete ID of the ring is touching the pipe before install-ing the side bolts. Tighten the side bolts evenly to 110 ft-lbs. (60 ft-lbs on 4” and 6”)
- Place nuts on the thrust bolts and tighten until they are snug. Allow enough room on the thrust bolts to fully engage the nuts. Do not tighten these bolts enough to force the spigot further into the bell of the joint.
EBAA IRON Sales, Inc.
P.O. Box 857, Eastland, TX 76448
-
Tel: 254-629-1731
-
Fax: 254-629-8931
800-433-1716 within US and Canada
References
- EBAA Iron, Inc. - Leaders in Pipe Joint Restraint and Flexible Expansion Joints
- EBAA Iron, Inc. - Leaders in Pipe Joint Restraint and Flexible Expansion Joints
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>