TRANE KIT19897 Agility Water Cooled Chiller Filterless Motor Compressor Retrofit Instruction Manual
- June 13, 2024
- Trane
Table of Contents
- TRANE KIT19897 Agility Water Cooled Chiller Filterless Motor Compressor
- Product Information
- Product Usage Instructions
- Introduction
- General Information
- **Parts List
- Tools Required
- Installation
- Major Component Description
- Trane Unit Controls
- Component Weights
- Rigging and Lifting
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
TRANE KIT19897 Agility Water Cooled Chiller Filterless Motor Compressor
Retrofit
Product Information
The product is an AgilityTM Water-cooled Chiller with a Filterless Motor Compressor Retrofit KIT19897. It is designed for heating, ventilating, and air-conditioning purposes. The chiller requires installation by qualified personnel and adherence to safety precautions.
Safety Warning
Only qualified personnel should install and service the equipment. The
installation, starting up, and servicing of heating, ventilating, and air-
conditioning equipment can be hazardous andrequires specific knowledge and
training. Improperly installed, adjusted or altered equipment by an
unqualified person could resultin death or serious injury. When working on the
equipment, observe all precautions in the literature and on the tags,
stickers, and labels that are attached to the equipment.
Important Environmental Concerns
The product emphasizes responsible refrigerant practices to minimize
environmental impact. It is important to follow proper field wiring and
grounding requirements to prevent fire and electrocution hazards. Personal
protective equipment (PPE) is required to protect against potential
electrical, mechanical, and chemical hazards.
Copyright and Trademarks
This document and the information in it are the property of Trane. Written
permission is required to use or reproduce the content. Trane reserves the
right to revise the publication without obligation to notify individuals of
such changes. All referenced trademarks belong to their respective owners.
Product Usage Instructions
- Read the manual thoroughly before operating or servicing the unit.
- Follow all safety advisories and precautions mentioned in the manual.
- Ensure that only qualified personnel install and service the equipment.
- Adhere to the specific knowledge and training required for installation, starting up, and servicing of the product.
- Properly install, adjust, and alter the equipment to prevent any risk of death or serious injury.
- Observe all precautions mentioned in the literature, tags, stickers, and labels attached to the equipment while working on it.
- Follow requirements for field wiring installation and grounding as described in NEC and your local/state/national electrical codes.
- Wear proper personal protective equipment (PPE) to protect against potential electrical, mechanical, and chemical hazards.
- Follow Trane’s EHS (Environment, Health, and Safety) policies to ensure safety.
Note : The installation, starting up, and servicing of the AgilityTM Water-cooled Chiller should only be performed by qualified personnel with specific knowledge and training. Please consult the full user manual for detailed instructions specific to your model.
SAFETY WARNING
Only qualified personnel should install and service the equipment. The
installation, starting up, and servicing of heating, ventilating, and air-
conditioning equipment can be hazardous and requires specific knowledge and
training. Improperly installed, adjusted or altered equipment by an
unqualified person could result in death or serious injury. When working on
the equipment, observe all precautions in the literature and on the tags,
stickers, and labels that are attached to the equipment.
Introduction
Read this manual thoroughly before operating or servicing this unit.
Warnings, Cautions, and Notices
Safety advisories appear throughout this manual as required. Your personal
safety and the proper operation of this machine depend upon the strict
observance of these precautions.
The three types of advisories are defined as follows:
- WARNING Indicates a potentially hazardous situation which, if not avoided, could result in death or serious injury.
- CAUTION Indicates a potentially hazardous situation which, if not avoided, could result in minor or moderate injury. It could also be used to alert against unsafe practices.
- NOTICE Indicates a situation that could result in equipment or property damage only accidents.
Important Environmental Concerns
Scientific research has shown that certain man-made chemicals can affect the
earth’s naturally occurring stratospheric ozone layer when released to the
atmosphere. In particular, several of the identified chemicals that may affect
the ozone layer are refrigerants that contain Chlorine, Fluorine and Carbon
(CFCs) and those containing Hydrogen, Chlorine, Fluorine and Carbon (HCFCs).
Not all refrigerants containing these compounds have the same potential impact
to the environment. Trane advocates the responsible handling of all
refrigerants-including industry replacements for CFCs and HCFCs such as
saturated or unsaturated HFCs and HCFCs.
Important Responsible Refrigerant Practices
Trane believes that responsible refrigerant practices are important to the
environment, our customers, and the air conditioning industry. All technicians
who handle refrigerants must be certified according to local rules. For the
USA, the Federal Clean Air Act (Section 608) sets forth the requirements for
handling, reclaiming, recovering and recycling of certain refrigerants and the
equipment that is used in these service procedures. In addition, some states
or municipalities may have additional requirements that must also be adhered
to for responsible management of refrigerants. Know the applicable laws and
follow them.
WARNING
Proper Field Wiring and Grounding Required!
Failure to follow code could result in death or serious injury. All field
wiring MUST be performed by qualified personnel. Improperly installed and
grounded field wiring poses FIRE and ELECTROCUTION hazards. To avoid these
hazards, you MUST follow requirements for field wiring installation and
grounding as described in NEC and your local/state/national electrical codes.
WARNING
Personal Protective Equipment (PPE) Required!
Failure to wear proper PPE for the job being undertaken could result in death
or serious injury. Technicians, in order to protect themselves from potential
electrical, mechanical, and chemical hazards, MUST follow precautions in this
manual and on the tags, stickers, and labels, as well as the instructions
below:
-
Before installing/servicing this unit, technicians MUST put on all PPE required for the work being undertaken (Examples; cut resistant gloves/sleeves, butyl gloves, safety glasses, hard hat/bump cap, fall protection, electrical PPE and arc flash clothing). ALWAYS refer to appropriate Safety Data Sheets
(SDS) and OSHA guidelines for proper PPE. -
When working with or around hazardous chemicals, ALWAYS refer to the appropriate SDS and OSHA/GHS (Global Harmonized System of Classification and Labeling of Chemicals) guidelines for information on allowable personal exposure levels, proper respiratory protection and handling instructions.
-
If there is a risk of energized electrical contact, arc, or flash, technicians MUST put on all PPE in accordance with OSHA, NFPA 70E, or other country-specific requirements for arc flash protection, PRIOR to servicing the unit. NEVER PERFORM ANY SWITCHING, DISCONNECTING, OR VOLTAGE TESTING WITHOUT PROPER ELECTRICAL PPE AND ARC FLASH CLOTHING. ENSURE ELECTRICAL METERS AND EQUIPMENT ARE PROPERLY RATED FOR THE INTENDED VOLTAGE.
WARNING
Follow EHS Policies!
Failure to follow the instructions below could result in death or serious
injury.
- All Trane personnel must follow the company’s Environmental, Health, and Safety (EHS) policies when performing work such as hot work, electrical, fall protection, lockout/tagout, refrigerant handling, etc. Where local regulations are more stringent than these policies, those regulations supersede these policies.
- Non-race personnel should always follow local regulations.
Copyright
This document and the information in it are the property of Trane, and may not
be used or reproduced in whole or in part without written permission. Trane
reserves the right to revise this publication at any time, and to make changes
to its content without obligation to notify any person of such revision or
change.
Trademarks
All trademarks referenced in this document are the trademarks of their
respective owners.
General Information
Chillers with the following configuration should be retrofit with a new compressor:
- Agility Model HDWA
- 300 or 400 ton units
- Built prior to February 2023
- Design sequence AD or earlier
Purpose
The compressor used for 300 and 400T Agility chillers built prior to February
2023 has been discontinued in production. The replacement compressor does not
require the output filter. This retrofit allows the use of the newly offered
compressor, and removal of output filter for older units.
Related Literature
- Installation, Operation, and Maintenance, Agility™ Water-cooled Chillers with Symbio™ Controls (HDWA-SVX002*-EN)
- Service Guide, Agility™ Water-cooled Chillers with Symbio™ Controls (HDWA-SVG002*-EN)
- Installation Guide, Agility™ Water-cooled Chillers with Symbio™ Controls Disassembly and Reassembly (HDWA-SVN003*-EN)
- Programming Guide, Tracer® TU Service Tool for use with Water-cooled Agility™ Chillers with Symbio™ Controls (HDWA-SVP002*-EN)
- Service Manual, TR200 New D-Frame, 110-400 kW (BAS-SVM01*-EN)
- Programming Guide, Danfoss TR200 (BAS-SVP04*-EN)
- HUB Solution, HDWA Agility™ Drive Configuration Instructions (MCT10 Software Tool)
- Installation Instructions, Symbio™ 800 Control Upgrade Kit for UC800 Adaptiview™ Display (CDUB-SVN002*-EN)
Sample Nameplate
**Parts List
**
Table 1. Parts list for KIT19897
Manufacturing Part Number| ****
Part Description
---|---
453742500001| ASSEMBLY; TRANSITION ENCLOSURE
X13491386030| TERMINAL BLOCK; 2P
453742530001| WIRE KIT; TRANSITION HARNESS, 313MCM
X19150693001| RING TERMINAL; 50
X19210282010| WIRE TIE
X20600036020| EDGE MOLDING
X45050656010| HOSE; DRIVE COOLING, 3/4 INCH I.D. – 200 P.S.I.
X32030305030| HOSE CLAMP
453722250001| ASSEMBLY; WIRE TRAY
X19051622020| WIRE HARNESS; 1-2 BRANCHING 1000 MM
CNT09384| DANFOSS TR200 MARKII CONTROL CARD
Table 2. Compressor part numbers
Size (tons) | Part Number |
---|---|
300 | COM13897 |
400 | COM13896 |
Tools Required
- 1/8 in. and 3/8 in. wide flat head screwdrivers
- Flat head screwdriver
- Phillips screwdriver
- Torque wrench
- Socket set
- Breaker bar
- Rigging and lifting equipment
- Spreader bar
- Wrenches
- T20 torx head driver
- Danfoss MCT10 service tool
- USB cable Type A to Type B
- Wiring Tool
Parts not Included
- Glycol
- Wire ties
- Symbio™ upgrade kit (if required)
Installation
WARNING
Hazardous Voltage w/Capacitors!
Failure to disconnect power and discharge capacitors before servicing could
result in death or serious injury. Disconnect all electric power, including
remote disconnects and discharge all motor start/run capacitors before
servicing. Follow proper lockout/tagout procedures to ensure the power cannot
be inadvertently energized. For variable frequency drives or other energy
storing components provided by Trane or others, refer to the appropriate
manufacturer’s literature for allowable waiting periods for discharge of
capacitors. Verify with a CAT III or IV voltmeter rated per NFPA 70E that all
capacitors have discharged.
WARNING
Refrigerant under High Pressure!
Failure to follow instructions below could result in an explosion which could
result in death or serious injury or equipment damage.
System contains refrigerant under high pressure. Recover refrigerant to
relieve pressure before opening the system. See unit nameplate for refrigerant
type. Do not use non-approved refrigerants, refrigerant substitutes, or
refrigerant additives.
WARNING
Hazardous Voltage!
Failure to disconnect power before servicing could result in death or serious
injury.
Disconnect all electric power, including remote disconnects before servicing.
Follow proper lockout/tagout procedures to ensure the power can not be
inadvertently energized. Verify that no power is present with a voltmeter.
Shutdown Power
- Using lockout/tagout safety procedures, shutdown main power to the chiller.
- Open all starter and control panel disconnect switches and
- secure them in the open position.
- Confirm the power is off to the chiller control panel.
Major Component Description
Trane Unit Controls
UC800/Symbio™ 800
If the existing chiller has UC800 controls, an upgrade to Symbio™ 800 is
required as part of the compressor replacement. Follow the instructions in
Installation Instructions, Symbio™ 800 Control Upgrade Kit for UC800
Adaptiview™ Display (CDUB-SVN002*-EN).
Danfoss TR200 Drive Control Board
- Determine the control board version using the figures below.
- Markl: USB connector has a black element.
- MarkII: USB has a white element.
- MarkII control board does not need to be replaced.
- If control board is MarkI, replace with a MarkII version as follows:
a. Copy the configuration from the drive to your laptop. See HUB Solution, HDWA Agility Drive Configuration Instructions (MCT10 Software Tool).
b. Remove the MarkI control board and install the MarkII control board. See Service Manual, TR200 New D-Frame, 110-400 kW (BAS-SVM01*-EN), section 7.3.2 for replacement procedure.
c. Load the drive configuration from your laptop to the connected drive. See HUB Solution, HDWA Agility Drive Configuration Instructions (MCT10 Software Tool).
Compressor Removal
Note : The existing compressor must be removed before filter removal.
Glycol piping and transition box must be reinstalled prior to the installation
of the replacement compressor.
Remove compressor per instructions found in Service Guide, Agility™ Water-
cooled Chillers with Symbio™ Controls (HDWA-SVG002*-EN).
Output Filter Panel Removal
Follow the procedure below for instructions for removing the existing output
filter panel.
Drain Glycol Tank
- Remove glycol system drain plug.
- Open drain valve to drain the glycol tank.
- Remove bottom hose of heat exchanger and drain
- Remove top hose of heat exchanger and drain.
- Remove hose connection cover.
- Disconnect hose fittings.
- Remove filter bolt covers.
- Disconnect filter output wires.
- Remove vertical wire cover box.
- Remove horizontal wire cover box.
Component Weights
Table 3. Component weights
Component | Weight (lb) |
---|---|
Existing filter | 250 |
New buss bar enclosure | 72 |
Rigging and Lifting
WARNING
Heavy Objects!
Failure to follow the instructions below or properly lift the unit could
result in the unit dropping and possibly crushing the operator/technician
which could result in death or serious injury, and equipment or property-only
damage. Ensure that all the lifting equipment used is properly rated for the
weight of the unit being lifted. Each of the cables (chains or slings), hooks,
and shackles used to lift the unit must be capable of supporting the entire
weight of the unit. Lifting cables (chains or slings) may not be of the same
length. Adjust as necessary for even unit lift.
WARNING
Improper Unit Lift!
Failure to properly lift unit in a LEVEL position could result in unit
dropping and possibly crushing operator/technician which could result in death
or serious injury, and equipment or property-only damage.
Test lift unit approximately 24 inches (61 cm) to verify proper center of
gravity lift point. To avoid dropping of unit, reposition lifting point if
unit is not level.
Unit Lifting Points – Preferred Lifting Method
The preferred method for lifting a filter unit to position it for
installation is to use an identical individual hoisting device at each lift
point.
Unit Lifting Points – Alternative Lifting Method
If it is only possible to use a single hoisting device to lift a filter unit
to position it for installation, a spreader bar should be used to allow
adjusting the rigging as necessary to balance the unit around its center-of-
gravity to ensure full control of the unit during lifting.
Secure Filter
- Install lifting eyes on top of the filter.
- Secure filter with proper lifting device.
Remove Filter
-
Remove filter bolts from the drive.
-
Lift the filter away from unit.
a. Headroom required is 13 3/8 inches (339 mm).
b. If headroom clearance is not sufficient, remove the economizer flange and remove the economizer tube. Replace the provided economizer O-ring during reassembly. -
Glycol Cooling Line Installation
Install glycol cooling lines as described for your specific chiller application. -
Install the kit supplied hoses onto existing barbed fittings and secure with hose clamps.
-
Refill glycol system using amounts listed in table below and Service Guide, Agility™ Water-cooled Chillers with Symbio™ Controls (HDWA-SVG002*-EN):
Drive | Glycol amount (gal) |
---|---|
Single | 0.9 |
Double | 1.1 |
Transition Box Installation
- Using proper lifting procedures, lift the transition box into place in the location of the previous filter.
- Bolt transition box in place.
- Route the drive wires to the transition assembly and install horizontal wire cover box.
- Install vertical wire cover box.
- Fasten the wire lugs to the proper bus bars. Torque fasteners 22 to 26 ft-lb.
- Install rubber edge molding onto the tie down bracket and onto the inside flange of the transition cover.
- Secure the transition box cover.
Compressor Installation
- Complete the compressor installation per Service Guide, Agility™ Water-cooled Chillers with Symbio™ Controls (HDWA-SVG002*-EN).
- Position power wires onto motor terminals and tighten wire ties so the wires do not put stress on the terminals.
- Trim black and black/white leads on the potential transformer (4T1). Crimp on 1/2 inch diameter ring terminals and install on motor terminals as follows:
- Black/white: T1 terminal
- Black: T2 terminal
- Torque nuts to 22 to 26 ft-lb (29.8 to 35.2 Nm).
- Replace covers.
Trane – by Trane Technologies (NYSE: TT), a global climate innovator – creates
comfortable, energy-efficient indoor environments for commercial and
residential applications. For more information, please visit trane.com or
tranetechnologies.com.
Trane has a policy of continuous product and product data improvement and
reserves the right to change design and specifications without notice. We are
committed to using environmentally conscious print practices.
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>