Current Albeo ABV Series Modular High and Low Bay Lighting LED Luminaire Installation Guide

June 12, 2024
current

Albeo® LED Luminaire
Modular High & Low Bay Lighting
(ABV-Series)
Installation Guide
ALB062

Features

  • 5 year warranty
  • Damp location rated

BEFORE YOU BEGIN
Read these instructions completely and carefully.
WARNING
RISK OF ELECTRIC SHOCK

  • Turn power off before inspection, installation or removal.
  • Properly ground electrical enclosure.

RISK OF FIRE

  • Follow all NEC and local codes.
  • Use only UL or IEC approved wire for input/output connections. Minimum size 18 AWG.

This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation. CAN ICES-005 (A) / NMB-005 (A).
This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment. This equipment generates, uses, and can radiate radio frequency energy and, if not installed and used in accordance with the instruction manual, may cause harmful interference to radio communications. Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at his own expense.

Save These Instructions

Use only in the manner intended by the manufacturer. If you have any questions, contact the manufacturer.
NOTE: Contact the manufacturer for details and limitations when seeking to incorporate this product with an emergency system other than Battery Backup.
NOTE: CONTACT FACTORY for details and limitations when seeking to incorporate this product with an emergency system other than Battery Backup.

Prepare Electrical Wiring

Electrical Requirements
The LED driver must be supplied with 120-480 VAC, 50/60 Hz per product label and connected to an individual properly grounded branch circuit, protected by a 15 or 20 ampere circuit breaker.
Grounding Instructions
The grounding and bonding of the overall system shall be done in accordance with National Electric Code (NEC) Article 600 and local codes.Current Albeo
ABV Series Modular High and Low Bay Lighting LED Luminaire -
overvouCurrent
Albeo ABV Series Modular High and Low Bay Lighting LED Luminaire - overvou
1Current Albeo
ABV Series Modular High and Low Bay Lighting LED Luminaire - overvou
2For 347/480v only see below steps in opening box.
For 120/277V follow same steps in accessing Knock Out plate for wiring.Current Albeo ABV Series Modular High and Low Bay Lighting LED
Luminaire - overvou 3

N White  2
**** Green  3
+DIM Violet/White Stripe
-DIM Pink
L (unswitch) Black
L (switch) Red
White Black
--- ---

Troubleshooting

Symptom Solution
Luminaire will not turn on • Check that the color of the supply side wires

match the color of the wires they are connected to.
• Check that all wire connectors are properly connected.
• Verify that your input voltage is within specs.
• If you are using any additional controls (i.e. wireless controls/motion sensors), please also verify that those are working properly and that the unit is setup to interface with the controllers.

LED.com
© 2023 Current Lighting Solutions, LLC. All rights reserved. Information and specifications subject to
change without notice. All values are design or typical values when measured under laboratory conditions.
(Rev 05/04/23)
ALB062-Albeo-ABV-Series-Installation-Guide

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

current User Manuals

Related Manuals