genexis XGS2120-2.5G FiberTwist-Series Network Termination Installation Guide

June 4, 2024
genexis

genexis-LOGO

genexis XGS2120-2.5G FiberTwist-Series Network Termination

genexis-XGS2120-2-5G-FiberTwist-Series-Network-Termination-
PRODUCT

Button overview

Unlock button
Remove FiberTwist or Blind Cover – press and hold while twisting counterclockwise

Reset button (recessed)
Reset – press and release

LED dim button

Dim LEDs – press and release to dim LEDs in steps Port overview

ON/OFF button
Power ON or OFF – press and release to switch device ON or OFF

LED overview

genexis-XGS2120-2-5G-FiberTwist-Series-Network-Termination-
FIG-3

System

  • Green – system ok
  • Green (blinking) – booting / firmware download Off – power off

Uplink

  • Green – link ok
  • Green (blinking) – link establishing
  • Off – no link

TV

  • Green – TV ok
  • Green (blinking) – insufficient input signal
  • Off – no TV

Installation guide

Different language versions of this document and additional product information are available on https://genexis.eu/product/fibertwist/downloads

Box contents

  • Genexis FiberTwist (active device)
  • Power adapter
  • 2x Spare device label (self-adhesive)
  • Installation Guide (this document)

Label position
The product label is positioned on the back of the active device.

Preparation
Ensure there is a power socket within reach of where the device is being installed.

Important: Instructions need to be followed precisely and uninterrupted. This minimizes the risk of damage to the fiber optic connectors, causing a severe degradation of signal quality.

Remove Blind Cover (if present)

  1. Press and hold the unlock button (see button overview).
  2. rotate the Blind Cover counterclockwise till it blocks.
  3. emove the Blind Cover from the baseplate (FTU) by pulling it towards yourself.
  4. Store the Blind Cover in a safe place.genexis-XGS2120-2-5G-FiberTwist-Series-Network-Termination-FIG-4

Remove dust cap

  1. Take the FiberTwist out of the box.
  2. The dust cap is connected to the red string located on the rear of the FiberTwist.
  3. Remove the dust cap by pulling the red string.
  4. Store the dust cap in a safe place.

Twist

  1. Place the FiberTwist on the FTU as shown in the picture below, in a 30–degree angle.
  2. Rotate clockwise until it clicks into place.
  3.  Make sure the FiberTwist is aligned squarely on the FTU, each edge must line up directly with the FTU below.genexis-XGS2120-2-5G-FiberTwist-Series-Network-Termination-FIG-6

Your FiberTwist is now installed!

Connecting the FiberTwist

  1. If required, connect your television / set-top box to the TV port with a coax cable.
  2. f required, connect your personal devices to the LAN ports via an RJ45 network cable.
  3. connect the supplied power adapter to the FiberTwist and plug the adapter into a power socket.
  4. press the ON/OFF button to power on the device.

If at some point in the future it becomes necessary to uninstall the FiberTwist, please place the Blind Cover back on the FTU immediately and put the dust cap back on the FiberTwist.

Warning: The FiberTwist is a Class 1 laser product.

EU Declaration of Conformity

Hereby, Genexis Netherlands B.V. declares that the product FiberTwist- XGS2120-2.5G is in compliance with Directives 2014/30/EU, 2014/35/EU, 2011/65/EU, Delegated Directive 2015/863 and Ecodesign Directive 2009/125/EC.
The full text of the EU declaration of conformity is available at the following internet address: https://genexis.eu/product/fibertwist/red /fibertwist-xgs2120-2-5g

Company Name

  • Genesis Netherlands B.V.

Company Address

  • Lodewijkstraat 1a
  • 5652 AC Eindhoven
  • The Netherlands

Name and title of authorized person

  • Maarten Egmond, CTO

Signature of authorized person

Place of issue Date of issue
Eindhoven 2021-04-15
The Netherlands

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

genexis User Manuals

Related Manuals