Safety

Safety Instruction
General Safety Instructions

Safety regulations have been strictly observed in the design and testing of the inverter. Prior to any work, carefully read all safety instructions and always observe them when working on or with the inverter. The installation must adhere to all applicable national or international standards or regulations.
Incorrect operation or work may cause:

  • injury or death to the operator or a third party
  • damage to the inverter and other properties belonging to the operator or a third party.

Important Safety Notifications
There are various safety issues that must be carefully conveyed prior to during and after the installation, as well as during future operation and maintenance. The following are important safety notifications for the operator, owner, and user of this product under normal conditions of use.
DANGER

Dangers of High Voltages and Large Current

  • Beware of high PV voltage. Please turn-off the DC switch of PV Panel output before and during the installation to avoid electric shock.
  • Beware of high grid voltage. Please turn-off the AC switch at the grid connection before and during the installation to avoid electric shock.
  • Beware of large current of the battery output. Please turn-off the battery module before and during the installation to avoid electric shock.
  • Do not open the inverter when it’s working to avoid electric shock and damage from live voltage and current from the system.
  • Do not operate the inverter when it’s working, only the LCD and buttons can be touched in limited cases by qualified personnel,
  • Other parts of the inverter can be touched when the inverter is in a safe state (e.g., fully shutdown).
  • Do not connect or disconnect any connections (PV, battery, grid, communication etc.) of the inverter when it’s operating.
  • Make sure the inverter is well grounded. An operator should make sure he is well protected by reasonable and professional insulation measurements (e.g., personal protective equipment (PPE).
  • Inspect relevant existing wiring on-site of the installation is in good condition before installation, operation, or maintenance.

WARNING

Avoid Misoperation and Inappropriate Usage

  • All the work of this product (system design, installation, operation, setting, configuration, and maintenance must be carried out by qualified personnel as required.
  • All connections must be in accordance with local and national regulations and standards.
  • The inverter and system can inter-connected with the utility grid only if the utility grid permits it.
  • All the warning labels or nameplates on the inverter must be clearly visible and must not be removed, covered, or pasted.
  • The installation should consider the safety of future users when choosing the right position and location as specified in this manual.
  • Please keep the children away from touching or misusing the inverter and relevant systems.
  • Beware of burning hurt, the inverter and some parts of the system could be hot when working, please do not

Notice

  • Please carefully read this manual before any work is carried out on this inverter, the installation, please keep this manual carefully stored and easy to access at any time.
  • The qualified personnel should have had training in the installation and commissioning of the electrical system as well as dealing with hazards, also they should have the knowledge of the manual and other related documents. As the installer or operator, they are required to be familiar with local regulations and directives.

Brief Introduction

System Solution
This product and its associated system are suitable for the following system applications (system diagram):

FORTRESS POWER FP ENVY 8K Envy Inverter 10 kW - Brief
Introduction

Diagram Number Applications
1 Off-Grid
2 On-Grid, Backup, Net-Metering, Zero-Export
3 AC Coupling, AC /DC COUPLING
4 No Battery
5 Smart Load

Unboxing

When the packaging is unpacked, the inner components should match those listed in the list below. If any components are missing, please create a support ticket at www.fortrespower.com/support

FORTRESS POWER FP ENVY 8K Envy Inverter 10 kW - Brief
Introduction1

Part Number| Part Name| Quantity| Checked by User/Installer
---|---|---|---
1| Envy Inverter| 1|
2| Cabinet Keys| 2|
3| Battery To Inverter Communication Cable| 1|
4| Inverter To Inverter Communication Cable| 1|
5| Current Transformer (CT)| 2 (connected by one cable)|
6| Dongle| 1|
7| Dongle Screws| 4|
8| Mounting Screw for Wooden Platform| 6|
9| Wall Mount Bracket| 1|
10| RJ45 Terminals| 4|
11| L-shaped Brace| 2|
12| Nylon Lock Nut| 10|
13| Expansion Screw| 6|
14| Installation/ User Manual| 1|
15| Knockout Wiring Template| 1|

Overview and Requirements

Connection Overview

FORTRESS POWER FP ENVY 8K Envy Inverter 10 kW - Connection
Overview

The Envy 8k has already built in breakers for all AC connections as well as the Battery connection. Please include the following PV Fuse breakers in accordance with the local jurisdiction.

Inverter model 12K
PV Fuse Breakers (1 Pole) MPPT1 string 1: 600V/20Adc MPPT1 string 2:

600V/20Adc
MPPT2 string1: 600V/20Adc MPPT2 string 2: 600V/20Adc
Integrated Grid Breaker (2 Pole)| 1 qty 63Aac
Integrated Generator or AC Coupling (2 Pole) Breaker| 1 qty 63Aac
Integrated Load Breaker (2 Pole)| 1 qty 63Aac
Integrated Battery Breaker| 1 qty 250Adc

Cable Requirements
Suggested Wire Gauge 

Section| CableGauge (AWG)| Minimum Voltage (V)| Torque (N.M)| Length of Cable Insulation Removal| Terminal Type
---|---|---|---|---|---
Grid Input| | | | |
Integrated Breaker 63Aac| 6| 600| 2| 5/16-3/8 in (8~10mm)| Compression/Screw type
Load Output| | | | |
Integrated Breaker 63Aac| 6| 600| 2| 5/16-3/8 in (8~10mm)| Compression/Screw type
Battery Cable| | | | |
Integrated Breaker 250Adc| 1/0-3/0| 600| 17| 1/4-5/16 in (6-8mm)| Compression/Allen 5/16
SAE
Generator Cable| | | | |
Integrated Breaker 63Adc| Up to 4| 600| 2| 5/16-3/8inch(8~10mm)| Compression/Screw type
PV Cable| | | | |
PV Input| 10-8| 600| N/A| 1/4-5/16 in (6~8mm)| Spring Clamp

Note: Cable gauge also will depend on connection distance
Inside the ENVY Cabinet
Connection Ports
FORTRESS POWER FP ENVY 8K Envy Inverter 10 kW - Connection
Ports Do not use an impact driver to tighten or loosen fastener on any of the Envy port connections.

Area Description
1 Communications Boards
2 250A Battery Breakers
3 Battery Connection Ports
4 63A Generator Breaker and Connection Port
5 63A Load Breaker and Connection Port
6 63A Grid Breaker and Connection Port
7 PV Input
8 Protective Earth or Ground Connection Bars Connection
9 Neutral Connection Bar

Communication Board Ports

FORTRESS POWER FP ENVY 8K Envy Inverter 10 kW - Communication Board
Ports

Port Description
a. Battery communication port (CAN&RS485)
b. CT Interface Connection
c. INV 485: Debugging port
d. Parallel communication port
e. FAN1/2/3 Connection port
f. NTC: Connection for temperature sensor of lead-acid battery
g. Meter 485B&485A: For Meter communication
h. ±12V: Reserved for customer to use, Max 500mA
i. CAN Matching resistance: Set DIP switch when use inverters in parallel
j. GEN (NO, NC): Connection for generator auto-start function
k. DRY (NO, NC): reserved

Envy Dimensions
Case Specifications

FORTRESS POWER FP ENVY 8K Envy Inverter 10 kW - Case
Specifications

Area Description
1 Touch LCD
2 PV Switch
3 RSD STOP button
4 Dongle Connection Port and Dongle
5 Leveling Wall Support
6 Bracket Support

Knockout Port Dimensions

FORTRESS POWER FP ENVY 8K Envy Inverter 10 kW - Knockout Port
Dimensions

Installation

Mechanical Installation
Requirements for installation location
Location Selection and Installation
a) The mounting wall should be strong enough to bear the weight of the inverter. Please maintain the minimum clearances when using multiple inverters in parallel as presented below for adequate heat dissipation. Other electrical accessories such as the ENVY distribution Panel (EDP) may be mounted with a minimum 2-inch clearance on either side of the inverter. If a wireway, cabinet, EDP or any sort of equipment is mounted below the inverter fans, the minimum clearance shall be 15.8 inches (400mm) unless extended outside the wall to be below the inverter’s knockout section without blocking the fans pathway.

FORTRESS POWER FP ENVY 8K Envy Inverter 10 kW -
Requirements

a) The inverter is allowed to be installed outdoors if it is withing operating temperature range. Never position the inverter in continuous sunlight, rain, or snow. To avoid continuous sunlight exposure, the inverter is allowed to be installed in the north, east, west side orientation of the property (in reference to the sun) as this might damage the LCD screen due to excessive UV exposure. If installed in thesouth side orientation, choose a well shaded site or a shed to protect the inverter from direct sunlight, rain, and snow etc. Otherwise install in the correct property side orientation as described in the figure below.
b) The inverter should be installed upright on a vertical surface.

FORTRESS POWER FP ENVY 8K Envy Inverter 10 kW - vertical
surface

Wall Mounting the Envy
The inverter is wall-mounted type and should be installed on a vertical, solid mounting surface, such as wood studs, brick, or concrete wall. Two or more people may be needed to install the inverter due to its weight. The slots on the mounting bracket can accommodate various stud spacings from 12inches(305mm) to 16inches(406mm).

FORTRESS POWER FP ENVY 8K Envy Inverter 10 kW - steps1

  1. Mark the drill holes positions with the mounting bracket,
  2. Drill four48mm(5/16inch) diameter holes, making sure the depth of the holes is deeper than 50mm(2inches).
  3. Install and tighten the expansion bolts into the holes.
  4. Then use the corresponding nuts and washers (packaged together with the expansion bolts) to install and fix the wall-mounting bracket on the wall.
  5. Hang the inverter onto the wall-mounting bracket and lock the inverter on the wall using 2 selftapping screws on the top of the inverter.

For installation on wood studs
Fasten the mounting bracket on the studs with 4 wood screws, then hang the inverter onto the bracket and lock the inverter on the wall with 2 selftapping screws.
Please note that the wood screws and self-tapping screws are not provided with the inverter. Installers need to prepare the screws before installation.
Electrical Installation
PV Components and Connection
The PV connection of this hybrid inverter is the same as that of a traditional on-grid solar inverter (string inverter).
WARNING

  • Please double check the lowest ambient temperature of the installation location. The rated Voc on solar panel nameplate is obtained at 25℃. As the ambient temperature drops, the Solar panel Voc increases. Please ensure the Maximum solar string voltage corrected at the lowest temperature does not exceed the inverter’s maximum recommended input voltage of 550V. Over voltage will damage the inverter.
  • Do not use a PV combiner. Using a PV combiner may affect or cause permanent damage to the inverter.

Component Requirement:
20A PV Fuse breakers per string (4 maximum)
Depending on Local Jurisdiction
NOTICE

  1. The inverter has two MPPTs. For MPPT1, users can connect two strings. For MPPT2 users can connect two strings. Both MPPTs work independently. All these strings are to be connected directly into the Inverter. Do not use a PV combiner as this may cause damage to the inverter.
  2. When users connect 2 strings to MPPT1, make sure the two strings have same quantity of solar panels. The inverter will limit the total MPPT1/MPPT2 input current to 25A/25A automatically.
  3. The inverter will limit the max solar input power to 13kW totally.
  4. Protect the MPPT inputs by installing 20-amp fuse breakers

Steps for PV Connection

  1. Strip off 1/4-5/16inch(6~8mm) insulation on the PV string’s positive and negative conductors.
  2. Use wire ferrules for PV string conductors if they are stranded wire type. Insert the conduit fitting into the opening for PV connection and tighten it from the inside using the counter nut.
  3. Route the PV conductors through the conduit fitting and into the inverter.
  4. Secure the cable gland in place.
  5. Ensure that the cables are connected correctly and securely.
  6. Then take appropriate measures to ensure that the conduit and conduit fittings are fastened reliably and seal the cable entry holes.FORTRESS POWER FP ENVY 8K Envy Inverter 10 kW - steps2

Rapid Shut Down (RSD)
Overview Connection of RSD Receivers (RSD R)

FORTRESS POWER FP ENVY 8K Envy Inverter 10 kW - Rapid Shut
Down

  • The Envy Inverter already includes an APsmart Rapid Shutdown Transmitter located behind the Communication Board black plate.
  • The APsmart Rapid Shutdown System Transmitter and APsmart RSD-S/RSD-D receivers (not included) work together as a rapid shutdown solution for PV modules.
  • For more information on how to connect the APsmart receiver please refer to the RSD-S and RSD-D Installation Quick guide.
  • The Transmitter sends a signal to the RSD-D units, enabling the PV modules to remain connected and continue supplying energy while the Transmitter is powered on.
  • When the Transmitter is switched off by the Emergency RSD button, the RSD-D units automatically enter rapid shutdown mode, halting energy production.
  • This solution is compliant with the 2017 and 2020 specifications of the NEC 690.12 and supports SunSpec signaling for rapid shutdown.

If an emergency occurs, simply activate the “RSD STOP” button. This will immediately cease and the RSD power supply, causing the inverter AC output to cease, and reducing the voltage of the PV conductor to below 30V within a timeframe of 30 seconds.

FORTRESS POWER FP ENVY 8K Envy Inverter 10 kW - RSD
STOP

**Rapid Shut Down will be mandated depending on your local jurisdiction.
The APsmart Transmitter is connected to the inverters internal 12V power supply. The output current limit is 1A (12W). Do not exceed this limit as this may cause damage to the inverter.

Device Voltage Rating (V) Current (A)
APsmart Single Core Transmitter 12 0.5
Tigo RSS Transmitter 12 1

Battery Connection
Battery power cable connection
All batteries must be installed as a single battery bank when paralleling multiple inverters.

Cable mounting Instructions:

  1. Strip 1/4-5/16inch(6-8mm) insulation from the cable end and crimp a ferrule to the cable ends.
  2. Route the battery power cable, connect positive to BAT+, negative to BAT-.
  3. Secure the conduit fitting to the enclosure using the counter nut.
  4. Crimp the ferrules into the stripped and fasten the battery positive and negative cables into the battery bus according to the markings.
  5. Fix the cable gland in place.

For best practice, install a Copper Busbar when paralleling two lithium batteries. Please Refer to the eFlex and evault Max manual for more details on installation and battery paralleling.

FORTRESS POWER FP ENVY 8K Envy Inverter 10 kW - Battery
ConnectionFORTRESS POWER FP ENVY 8K
Envy Inverter 10 kW - port Pinou

Envy Battery communication port Pinout
The battery communication port on inverter is an Rj45 socket, Pin for the RJ45 plug of the communication cable is as below. Make the communication cable according to the below inverter Pin and the correct pinout of communication port on battery. The inverter supports both CAN and RS485 communication. Use the communication cable included in the Envy Inverter packaging when using eFlex 5.4kWh batteries. Use the communication cable included in the eVault Max 18.5kWh packaging to establish battery to inverter communication.

Pin Description
1 NC
2 GND
3 NC
4 BAT CAN H
5 BAT CAN L
6 NC
7 BAT RS485 A
8 BAT RS485 B

Please Refer to our minimum Battery Sizing Standard when sizing with the ENVY Inverter. Please Refer to the eFlex and eVault Max Installation Manual for more details.
AC Connection
Grid connection

FORTRESS POWER FP ENVY 8K Envy Inverter 10 kW - AC
Connection

a. Strip off 5/163/8inch(8~10mm) insulation sleeve on the cables.
b. Use wire ferrules if the cables are made of fine stranded wires.
c. Secure the conduit fitting to the enclosure using the counter nut of the fitting.
d. Fasten the grid and EPS load cables to the terminal block in accordance with the markings.
e. Secure conduit to the conduit fitting.
f. Check that the cables are connected correctly and securely, then take appropriate measures to ensure that the conduit and conduit fitting are secured reliably and seal the cable entry holes.
Ground Neutral Bond
Make a bond connection between the Neutral and Ground at the Main Breaker Panel or you may also only make the bond once at the Utility Meters with breaker attached if applicable.
CT connection
To measure the power imported from and exported to the grid, a pair of CTs or one three phase meter must be installed at the service entry point in or near the main service panel. We standardly supply 2 CT for one inverter. The CT interface for 2 CTs connection is an RJ45 port. We have made an RJ45 plug on those 2 CTs in advance, so you can connect it to the port directly. Never put the CTs on the Load side, nor the generator side or inverter will not function properly. For Off Grid application, disregard the CTs.
CT Clamp Ratio
The inverter supports 3 ratios of CT clamp- 1000:1, 2000:1 and 3000:1 . The CT ratio of the CTs in the accessory bag is 3000:1. If you are using a 3rd party CT, please ensure the CT ratio is one of them, and select the correct CT ratio setting in the inverter monitor page or on the inverter LCD.
Extend CT Clamp Cable
The CT wires can be extended with a common ethernet cable if the length is not enough. An RJ45 adapter is needed for the extension. The CT wires can be extended up to 300ft (around 100m).
FORTRESS POWER FP ENVY 8K Envy Inverter 10 kW - CT Clamp
Ratio

Please refer to the connection diagram for the correct positions of CTs and clamp the 2 CTs on the L1 and L2 wires at the service entry point in the main service panel. CT1(label L1) should go to L1 and CT2(label L2) should go to L2. The arrow on the CT is pointing to the inverter. (* Incorrect install of the CT will cause The Display to show incorrect information’s and features of the inverter will not function correctly) If the CT are in a wrong direction, there is an option you can change the direction of the CT on your inverter call: CT Direction Reversed (Only for Direction not CT1 or CT2 Placement) in Advanced Tab of the LCD. You would not need to go change it physically.
CT Port Pin Definition**

Pin Description
1-4 Reserved
5 CT2N
6 CT2P
7 CT1N
8 CT1P

Optional Meter Connection
If you need to use a meter for import/export detection instead of CTs, you need to connect it to the Meter 485A and 485B terminals on the inverter.
Generator Connection
When Using the Generator Connection, do not connect an AC Coupled system. Inverter and Generator Damage will occur.
This hybrid inverter can work with a generator. There are Gen ports on the inverter for generator connection. Generator requirements: the generator should be neutral bonded type, with 240V/120V output. Fault or Damage may occur if connecting a 208V Generator.
When the generator is started, all the loads connected to EPS Load will be supplied by the generator. Meanwhile the battery will be charged.
The pass-through relay on the generator port is 50A. When the generator is on, please ensure the total load and charge current will not exceed 50A.
The generator start signal shall be connected to the COM board GEN Nominal Open (NO1 and CO1), or Nominal Close (NC1 and NO1) port, if users want to start generator remotely.

FORTRESS POWER FP ENVY 8K Envy Inverter 10 kW - Generator
Connection

AC Coupling Installation Connection
The inverter supports AC coupling connection with the existing grid- interactive solar system. The existing solar system is connected to the inverter’s GEN port. Make sure to add a fused disconnect switch between the Envy Gen Port and the Ac Coupled system. It is forbidden to connect the Generator in Gen Port when AC Coupled. Damage to the Generator or Inverter will occur.
What is frequency shifting power reduction?
All UL1741SA compliant grid-interactive inverter has the Frequency-Watt feature, which requires the grid-interactive inverter to reduce power with the increasing of grid frequency. The power will drop to zero before the over frequency trip threshold is reached. When the Fortress Power hybrid inverter requires the grid interactive inverter to reduce power, it simply shifts the output frequency up a bit, the grid-interactive inverter will limit its output power accordingly after sensing this frequency shift.
Paralleling Multiple Inverters

FORTRESS POWER FP ENVY 8K Envy Inverter 10 kW - Primary
Inverter Use the Communication Cables included in the in the Envy Inverter along with those of the eFlex5.4kWh and eVault Max 18.5kWh.
The Envy paralleling communication cables measures 6.5ft. Therefore, installers might need to provide an extra longer communication cable to be able to make parallel connections if installed further apart. The battery communicates only with the Master Inverter through Modbus RS485.
Connect the communication cable to the BAT COM port. Proceed to the Advanced Section under the LCD programming segment to finish paralleling process.
Third party RS485 communication
Meter 485B&485A:
are used when the Meter is not connected. These two pins can be used to communicate with the inverter using our Rs485 Modbus protocol.
INV485: This interface is shared with the WIFI module. If the WIFI module is not in use, users can use this interface to communicate with the inverter.

FORTRESS POWER FP ENVY 8K Envy Inverter 10 kW - meter

Pin Description
1 485B
2 485A
3-8 /

Commissioning and Powering Down Sequence
THERE ARE MULTIPLE LOCATIONS for these Breakers / Switches.

  • Battery and Load breakers are inside the Envy Wire Bay.
  • PV disconnect switch is on the side of the Envy.
  • Grid and Generator/AC coupled PV are external breakers.

Start up the inverter
Before proceeding, place all AC and DC breakers off

  1. Switch ON the Battery Breaker inside the inverter
    a. Turn on the battery system.
    b. Inverter will power up.
    i. If the Inverter does not power up Stop and correct the issue until it powers up

  2. Place the Inverter in Standby mode.
    a. LCD screen – Basic section

  3. Turn the PV Switch on the side of the inverter to On
    a. When commissioning, measure the PV and assure there is no reverse polarity prior to turning on.

  4. Confirm the Inverter is setup and running.
    a. Inverter Programming
    i. The last settings are stored therefore reprogramming may not be necessary.
    ii. LCD programming is detailed in the user manual.
    b. Battery communication
    i. Confirm battery voltage, SOC.
    c. PV connection
    i. Confirm PV voltage per MPPT.

  5. Switch ON Load Breaker inside the inverter

  6. Exit Inverter standby mode.
    a. LCD screen – Basic section
    b. Confirm Loads are being powered.

  7. Turn on the Grid Breaker

  8. If AC Coupling or Generator Turn on This Breaker.

Shut down the Inverter.
Danger: Do not disconnect the battery, PV, and AC input power under load. If there is an emergency issue, and you must shut down the inverter, please follow the steps as below.

  1. Turn Off Generator/Ac Coupled PV external breaker.
  2. Turn OFF the Grid breaker that feeds inverter.
  3. Switch OFF the Load breaker inside the inverter.
  4. Turn OFF PV Switch on the side of the inverter.
  5. Switch OFF the Battery breaker inside the inverter.
    a. wait for the LCD to turn off.

Wiring Diagrams

Backup Applications with Backfeeder Connection (split-phase service 120/240V & 120/208V)
Connection diagram for 120/240V is as below. The connection diagram for 120/208V split phase service is roughly the same except that generator is not supported.

FORTRESS POWER FP ENVY 8K Envy Inverter 10 kW - Wiring
Diagrams

Only Bond Neutral once at the main panel
Always adhere to your local jurisdiction guidelines and make sure that an Electrician makes all electrical connections.
AC Coupling Applications with a Backfeeder Connection (split-phase service 120/240V)

FORTRESS POWER FP ENVY 8K Envy Inverter 10 kW - Wiring
Diagrams1

Only Bond Neutral once at the main panel
Always adhere to your local jurisdiction guidelines and make sure that an Electrician make all electrical connections.
Off Grid Applications Connection (split-phase service 120/240V)

FORTRESS POWER FP ENVY 8K Envy Inverter 10 kW - Wiring
Diagrams2

WARNING: Make sure to turn off the Generator Breaker on the Envy before turning on the Generator and the PV system is bypassed. Fault or Damage will occur if power enters to the load side of the Envy.
Only Bond Neutral once at the main panel
Always adhere to your local jurisdiction guidelines and make sure that an Electrician make all electrical connections.
Paralleled Systems Applications with a Feeder tap Connection (split-phase service 120/240V)

FORTRESS POWER FP ENVY 8K Envy Inverter 10 kW - Wiring
Diagrams3

Only Bond Neutral once at the main panel
Always adhere to your local jurisdiction guidelines and make sure that an Electrician make all electrical connections.
Depending on your Local Jurisdiction a feeder tap breaker might be required between the Manual Bypass Switch and the feeder tap.

Envy Programming Through LCD Interface

Setting Parameters

  • Always enable Standby when adjusting parameters and changes to the Inverter settings.
  • Make sure to press SET on every change made, otherwise the value will revert to the default/previous parameter.
  • Password to make Changes is 00000
  • Touch the screen to light it up if it’s in sleep mode.
  • Settings must be the same on all inverters when paralleled.
  • Make sure that the Primary Battery is connected to the Master inverter when paralleling multiple inverters.
  • Note: there are up to 3 time periods for Time of Use Settings (TOU) for each configuration. If used, always start with Time 1, use Time 2 then Time 3. Leave Time 2 and 3 blank if only a single time period is needed.

Clicking on the Home icon at the bottom of the screen, you’ll get into the Home Screen page of the inverter.

FORTRESS POWER FP ENVY 8K Envy Inverter 10 kW - LCD
Interface

Figure# Name Displays
1 Battery Voltage, SOC
2 Solar MPPT Voltage & Power Production
3 Backup Voltage, Power, and Frequency
4 Grid Voltage, Power, and Frequency
5 Loads Power
6 Inverter Identification Qty. of Inverters, Role, and Phase (1~3, 1: R

Phase, 2: S Phase, 3: T Phase)
7| Energy Usage Data| Daily and Historical Energy Production and Consumption, Import and Export Power

Clicking on the gear icon at the bottom of the screen, you’ll get into the parameter setting page of the inverter.
Basic Section

FORTRESS POWER FP ENVY 8K Envy Inverter 10 kW - Basic
Section

Figure# Name Function
1 Restart Inverter Restart the system, please note the power maybe

interrupted when restarted.
2| Standby| For users to set the inverter to normal status or to standby status. In standby status, the inverter will stop any charging or discharging operations, as well as solar-feed-in and will allow AC passthrough if Grid- tied.
3| Export to Grid| When enabled, Inverter will export excess energy production back to Utility using the set kW.
4| Zero Export (Self Consumption)| When enabling, Inverter will sense voltage and current every 20ms to prevent any solar being exported and at the same time allow solar production to supply power to the loads connected in the main panel and critical load panel. Disable Export to Grid when using this function

Charge Section

FORTRESS POWER FP ENVY 8K Envy Inverter 10 kW - Charge
Section

Figure# Name Function
1 Operating Mode Enabling SOC or Bat V to control charge and discharge logic

depending on battery type. Always use percentage settings when in Closed Loop Using lithium batteries
2| Bat Charge Current Limit(a)| Use to set the maximum charging current recommended by the battery manufacturer.
3| AC Charge| By enabling, inverter will use available AC to charge the battery. AC Charge power(kW) to limit utility charging power,
4| TOU (Time of Use)| AC Charge will obey the time ranges. Users can charge batteries with grid power when electricity prices are cheap, and discharge battery power to supply load or export to the grid when electricity prices are high.
5| According to SOC/Volt| AC Charge will adhere to charging based on SOC/Volt settings rather than TOU.
| | Scroll Down
1| Charge First (PV)| Charge first: PV charge configuration. When using enable Charge first, PV will charge the battery as a priority, set time periods when PV charge can happen, charge first power(kW) to limit PV charge power, and “Charge first SOC (%)” as the target SOC for PV charge first. “Charge first Volt(V)” as the target battery voltage for PV Charge first
2| TOU (Time of Use)| AC Charge will obey the time ranges. Users can charge batteries with grid power when electricity prices are cheap, and discharge battery power to supply load or export to the grid when electricity prices are high.
3| Lead Acid/Open Loop Settings| When using Lead-acid battery or Open Loop Settings, you need to set parameters in these programs, Follow the battery manufacture recommendations.
| | Scroll Down

FORTRESS POWER FP ENVY 8K Envy Inverter 10 kW -
Generator

Generator
Generator Start Conditions

  1. When utility fails and
  2. When battery is discharged to cut-off settings or there is force charge request from battery or when the battery voltage or SOC is lower than the Generator Charge start Volt/SOC settings,

Generator Stop Conditions

  1. When battery voltage or SOC is higher than Charge end Volt/SOC settings value.

AC Coupling
Users need to enable AC coupling function. The inverter supports AC coupling connection with the existing grid-interactive solar system. The existing solar system is to be connected to the inverter’s GEN port.

Figure# Name Function
1 Charge Current Limit (A) Set the Max. battery charge current from the

Generator. The Generator will start charging according to the Charge start Volt/SOC and stop charging when the battery voltage or SOC reaches the Charge end Volt/SOC value.
2| Gen rated power| Inverter has the peak-shaving function, when you need you can enable it and setup the Gen peak-shaving power(W)
3| Charge Start & End SOC/Volt| Depends on the Bat operating mode setting; The system will use either battery SOC or battery voltage to determine whether the system needs to start or stop the generator.
4| AC Couple| When the Grid is on, the GEN terminal is connected to the grid terminal inside the inverter. In this case the hybrid inverter will bypass the interactive inverter AC to the grid and EPS. When On-Grid and Export to Grid are enabled, the AC-coupled inverter will always be on, and it will sell any extra power back to the grid. Ensure you are allowed to sell power to your utility provider. When export to Grid is disabled, the AC- coupled inverter will stay at off mode and could not work at on-grid mode to sell power. When grid is off, The GEN terminal is connected to the EPS terminal inside the inverter. In this case, the loads will be first supplied by solar power. If solar panels are generating more power than load consumption, the excess solar power will be stored in the battery. When solar power exceeds the sum of load power and max battery charging power, e.g., when battery is nearly full. The inverter will signal the grid interactive inverter to reduce power via the frequency shifting power reduction mechanism, thus, to maintain the balance of generation and consumption of the micro grid system.
End SOC (%): The SOC at which the AC coupled inverters are shut down when in off-grid mode. 90% recommended.
Start SOC (% ): The SOC at which the AC coupled inverters are turned on when in off-grid mode. 50%~70% recommended

Discharge Section

FORTRESS POWER FP ENVY 8K Envy Inverter 10 kW - Discharge
Section

Figure# Name Function
1 Operating Mode You can choose “Use SOC %” or Use Bat V” to control the

battery discharge state
2| Discharge current limit(A)| Discharge current limit(A): The Max. discharge current from battery
3| Discharge start power(W)| The Min. value can be set to 50. When the inverter detects the import power is higher than this value, battery start discharging, otherwise battery will keep standby.
4| On-grid Cut-off (%)/V & Off-grid Cut-off (%)/V| When the On-grid value is reached. Inverters will stop discharging batteries and switch to grid power to supply loads. The maximum set value is 90%. When Off Grid value is reached, the inverter will stop discharging the battery. Make sure to have an external power source like a generator so that the home does not lose power.
5| Forced discharge| Settings for battery force discharge within certain the time period. The inverter will discharge battery to the loads and excess will sell back to the grid at set power rate until time or Stop SOC is reached.
| | Scroll Down
1| Grid peak-shaving & Grid peak- shaving power(kW):| Is used to set the maximum power that the inverter will draw from its grid power. The rest will be supplied with available solar and battery power.
---|---|---
2| Smart Load| This function is to make the Gen input connection point as a load connection point, if you enable it, inverter will supply power to this load when the battery SOC and PV power is above a user setup value. e.g., Smart load start SOC=90%, Smart load end SOC=85%, Start PV power=300W, it means: When the PV power exceeds 300W, and the battery system SOC gets to 90%, the Smart Load Port will switch on automatically to supply the load which is connected on this side. When the battery reaches SOC<85% or PV power<300w, the Smart Load Port switch off.
Note: I f y o u e n a b l e t h e S m a r t l o a d f un c t i o n , i t s f o r b i dd e n t o c o nn e c t t h e g e n e r a t o r a t t h e s a m e t i m e , ot h e r w i s e the device will be damaged!

Advanced Section

FORTRESS POWER FP ENVY 8K Envy Inverter 10 kW - Advanced
Section

Figure# Name Function
1 PV Input Provides Selection of the quantity of MPPTS being used
2 CT Configuration The supported CT ratio is 1000:1, 2000:1, 3000:1. The

Default CT ratio that is provided with your inverter is 3000:1. If 3rd party CT is to be used, please. ensure its CT ratio is one of them and set it accordingly. CT direction reverse is to correct the direction of energy flow if installers placed the CTs in the wrong orientation.  Meter type should be 0:1 phase.
3| Offgrid Output| Enable to turn on Backup mode.
4| Seamless Switch| When enabled, the inverter will start inverting in less than 20ms when grid outage. Otherwise, it will inverter in less than 50ms.
5| AC Couple| Enable when user has AC coupling. AC coupled systems must always be connected in the Generator Port.
6| Charge Last| When enabled, solar will supple energy first to Loads>Export to Grid and charge battery with the remaining power.
7| EPS Output Without Battery| When enabled, it will use solar power to supply load when the grid fails, or load-shedding happens.
---|---|---
8| Micro-Grid| Only needs to be set when the generator is connected to the inverter’s grid port. With this option enabled, the inverter will use AC power to charge the battery and won’t export any power through the grid.
9| Smart Load| Enable to Turn ON Smart Load function. Do not connect an AC source when this function is enabled, or you may damage the inverter
10| Run Without Grid| Enable when in Off Grid application. Do not place any AC Source on the grid port when this function is enabled.
| | Scroll Down
1| Grid Type| Choose 120/240V or 120/208V
2| Grid Frequency| Choose 60 Hz (US, PR, MX) 50Hz
3| Grid Regulation| UL1741 & IEEE, CA RULE21, HAWAII HECO, PR-LUMA. Voltage and Frequency codes will generate automatically.
4| Battery Type| NO, BATTERY, LEAD-ACID, LITHIUM
5| Lithium Brand| LITHIUM 0 (FORTRESS POWER Protocol). Confirm batteries are communicating in the Detailed System information Section.
6| Lead Capacity (Ah)| Set battery bank capacity for open loop settings or Lead Acid batteries. Leave default value if Closed Loop.
For Lead-acid battery
1. The temperature sensor for the lead-acid battery is optional. If you need it, please contact the distributor for purchasing.
2. There are three stages for lead-acid battery charging. For charging/discharge related parameters, please check the charge /discharge settings page.
| | Scroll Down

FORTRESS POWER FP ENVY 8K Envy Inverter 10 kW - Advanced
Section1

When paralleling multiple Inverters, make sure to complete paralleling process by identifying which is the Primary inverter and the secondary on Parallel System area under the Advance Section. You can confirm by Selecting the Home Icon and view how many inverters are in connection (PNUM) and which Role each has (P=Primary, S=Subordinate)
Detailed System Information Section
To access the Detailed System Information, click on the pie icon at the bottom of the screen and you’ll be able to view the detailed real time solar information, batter information, grid information and EPS output information.
To confirm Batteries have been installed correctly and are communicating with the inverter, please refer to the Battery side of this section and note the “Imaxdischg”. For each eFlex 5.4kWh installed the value should be 60A. For each eVault 18.5kWh installed, the value should be 250A.

FORTRESS POWER FP ENVY 8K Envy Inverter 10 kW - Advanced
Section2

Monitor System Setup

Wi-Fi Dongle Connection and Registration
Users can use the Wi-Fi/ dongle to monitor their inverter and view the monitoring data on a computer or smart phone remotely. Connect the dongle on the inverter while it’s energized. The Dongle has a wireless signal reach of up to 10 meters (approximately 30ft.) in an open space. If the Internet Router is farther than this distance, it is recommended to install a WIFI extender. Make sure to keep the Dongle connected permanently as it also serves to provide a seal to the Dongle Port. Make sure to also install the Nylon Lock Nuts in the knockout holes that are not being used.

FORTRESS POWER FP ENVY 8K Envy Inverter 10 kW - Advanced
Section3FORTRESS POWER FP ENVY 8K
Envy Inverter 10 kW - Advanced Section4

Connect to the Wireless Network of the Dongle BA** using your phone or Laptop>type in a web browser 10.10.10.1>Username: admin Password: admin> Select English> Select Station Mode Setting> Select Scan on SSID> Select your Internet Wireless Network>Enter your router’s Password> Click Save and select yes to Reboot Dongle. Wait 1-2 minutes until the Dongle shows three solid green LED’S. Success!
Now you can disconnect your mobile phone from the “BAxxxxxxxx” wireless network.

LED Definitions

INV LED| Communication between datalogger and inverter
Cloud Icon LED| Communication between datalogger and network
Wi-Fi Icon LED| Communication between datalogger and HomeWiFi
LED Status| Status| Troubleshoot
All LED’s are solid green| Communication is Normal|
INV LED flashing| Communication Failure between Dongle and Inverter| Strictly Inspect the Connection between Dongle and Inverter
Cloud Icon LED Flashing| Communication Failure to the Internet| Check Router works normally. If not, Reset Router.
Note: Dongle should be within 10 meters (approx. 33ft) distance from the router. Government issued Routers might not accept the dongle connection ex. Starlink. If this is the case, then add a compatible Wi-Fi extender and connect to it
WIFI LED flashing| Communication Failure between Dongle and Router| Check if Homewifi name and password are correct

Register Account

  1. Download Envy Fortress Power APP from the Google Playstore or Apple Appstore.
  2. On the Home Page, Select Register to register your Envy and create a User Account. You can also do this through the Web Portal at envy.fortresspower.io
  3. Create and register the end-user’s information and credentials. The “customer code” is a code we assign to your distributor or installer that will allow them to view each station and end-user created using this registration method. Installers can contact Fortress Power Tech Support to be assigned a code. For DIY users feel free to use the Customer Code: Fortress.
  4. Once registered, you can log in using the created credentials. If you want to have more stations that need to be created, you can create them as stated in the image below. If there are multiple inverters being paralleled, then select Add Wi-Fi Module to the station created.FORTRESS POWER FP ENVY 8K Envy Inverter 10 kW - Advanced Section5
  5. Login on the APP with your account, you’ll find the inverter information already appears. Now you’ll be able to monitor and control the inverter remotely on any smart phone or computer that has an Internet connection.
  6. When selecting the Data Section, User will be able to monitor daily Energy production, Consumption, and Distribution.
  7. When Selecting the Monitor Section, It will inform the user of any Event/Alarms/Faults relevant to the inverter and/or battery.

Troubleshooting & Maintenance

Regular Maintenance
Inverter Maintenance
a. Check the inverter every 6 months or 1 year to verify if there is damage on cables, accessories, terminals, and the inverter itself.
b. Check the inverter every 6 months to verify if the operating parameter is normal and there is no abnormal heating or noise from the inverter.
c. Check the inverter every 6 months to confirm there is nothing that covers the inverter heat sink, if there is, shut down the inverter and clear the heat sink.
Battery Maintenance
Follow the manufacturer’s requirements on maintenance. When you carry out these works on batteries, please make sure to fully shut down the inverter for safety consideration.
LED Displays

LED Display Description Suggestion
Green LED Solid lit Working normally
Flashing Firmware upgrading Wait till upgrading complete
Yellow LED Solid lit Alarm, inverter is working but needs checked. Wait

for it to be clear up, If Alarm, remains it might need troubleshooting
Red LED| Solid lit | Fault, inverter stopped working| Need troubleshooting

Troubleshooting Based on LCD Displays
Once there is any warning or fault occurring, users can troubleshoot according to the LED status and the warning/fault information on the LCD.
Touching the bell icon at the bottom of the screen, you’ll see all the current and historical fault & warning information on this page.

  1. Fault on the LCD If the dot on the left of fault item is red, it means the fault is active. When it is grey, it means the fault is inactive.FORTRESS POWER FP ENVY 8K Envy Inverter 10 kW - Fault on the LCD
    Fault| Meaning| Troubleshooting
    ---|---|---
    M3 Rx failure| M3 microprocessor fails to receive data from DSP| Restart inverter, if the error still exists, contact Fortress Power service or your inverter supplier.
    Model fault| Incorrect model value
    Eps short circuit| Inverter detected short-circuit on EPS Load output terminals| 1. Check if the L1, L2 and N wires are connected correctly at inverter EPS Load output port.
    2. Disconnect the EPS Load breaker to see if fault remains. If fault persists, contact Fortress Power service or your inverter supplier.
    EPS power reversed| Inverter detected power flowing into EPS Load port| Restart inverter, if the error still exists, contact Fortress Power service or your inverter supplier.
    ---|---|---
    Bus short circuit| DC Bus is short circuited
    Relay fault| Relay abnormal
    M8 Tx failure| DSP fails to receive data from M8 microprocessor
    M3 Tx failure| DSP fails to receive data from M3 microprocessor
    Vbus over range| DC Bus voltage too high| Please check if the PV string voltage is within the inverter specification. If string  voltage is within range, and this fault still appears, contact Fortress Power service or your inverter supplier.
    EPS connect fault| EPS Load port and grid port are connected mixed up| Check if the wires on EPS Load port and grid port are connected correctly. If the error exists, contact Fortress Power service or your inverter supplier.
    PV volt high| PV voltage is too high| Please check if the PV string voltage is within the inverter specification. If string voltage is within range, and this fault still appears, contact Fortress Power service o your inverter supplier.
    Hard over curr| Hardware level over current protection triggered| Restart inverter, if the error still exists, contact Fortress Power service or your inverter supplier.
    Neutral fault| Voltage between N and PE is greater than 30V| Check if the neutral wire is connected correctly.
    PV short circuit| Short circuit detected on PV input| Disconnect all PV strings from the inverter. If the error persists, contact Fortress Power service or your inverter supplier.
    Temperature fault| Heat sink temperature too high| Install the inverter in a place with good ventilation and having no  direct  sunlight.  If the  installation  site  is okay, please check if the NTC connector inside the inverter is loose.
    Bus sample fault| Inverter detected DC bus voltage lower than PV input voltage| Restart inverter, if the error still exists, contact Fortress Power service or your inverter supplier.
    Inconsistant| Sampled grid voltage values of DSP and M8 microprocessor are inconsistent
    M8 Rx fault| M8 microprocessor fails to receive data from DSP
    Para Comm error| Parallel communication abnormal| 1.Please check whether the connection of the parallel cable is loose, please connect the parallel cable correctly Please check and make sure the PIN status of CAN communication cable from the first to the end inverter is correctly inserted
    Para master loss| No master in the Parallel system| a. If a master has been configured in the system, the fault will be automatically removed after the master works. If so, you can ignore it.
    b. If a master has not been configured in the system, and there are only slaves in the system, please set the master first. Note: For single unit running system, the role of the inverter should be set as “1 phase master”
    Para rating Diff| Rated power of parallel inverters are inconsistent| Please confirm that the rated power of all inverters are the same, or you can contact Fortress Power service to confirm
    ---|---|---
    Para Phase set error| Incorrect setting of phase in parallel| Please confirm that the wiring of the parallel system is correct first. In this case, then connect each inverter to the grid, the system will automatically detect the phase sequence, and the fault will be automatically resolved after the phase sequence is detected.
    Para Gen un-Accord| Inconsistent generators connect in parallel| Some inverters are connected to generators, some are not. please confirm that all inverters in parallel are connected to generators together or none of them are connected to generators
    Para sync loss| Parallel inverter fault| Restart inverters, if the error still exists, contact Fortress Power service or your inverter supplier
  2. Alarm on the LCD
    If the dot on the left of the alarm item is yellow, it means the alarm is active. When it is grey, it means the alarm is cleared.FORTRESS POWER FP
ENVY 8K Envy Inverter 10 kW - Fault on the LCD1 Alarm| Meaning| Troubleshooting
    ---|---|---
    Bat com failure| Inverter fails to communicate with battery| Check if communication cable is correct, and if you have chosen the correct battery brand on inverter L If all is correct but this error persists, please contact Fortress Power service or your inverter supplier.
    AFCI com failure| Inverter fails to communicate with AFCI module| Restart inverter, if the error persists, contact Fortress Power service or your inverter supplier.
    AFCI high| PV arc fault is detected| Check each PV string for correct open circuit voltage and short circuit current. If the PV strings are in good condition, please clear the fault on inverter LCD.
    Meter com failure| Inverter fails to communicate with the meter| 1. Check if the communication cable is connected correctly and in good condition.
    2. Restart inverter. If the fault persists, contact Fortress Power service or your inverter supplier.
    Bat Fault| Battery cannot charge or discharge| 1. Check the battery communication cable for correct pinout on both inverter and battery end;
    2. Check if you have chosen an incorrect battery brand;
    3. Check if there is fault on battery’s indicator.  If there is fault, please contact  your battery supplier.
    Auto test failure| Auto test failed| Only applied to Italy model
    ---|---|---
    Lcd com failure| LCD fails to communicate with M3 microprocessor| Restart inverter. If fault still exists, contact Fortress Power service or your inverter supplier.
    Fwm mismatch| Firmware version mismatch between the microprocessors
    Fan stuck| Cooling fan(s) are stuck
    Trip by gfci high| Inverter detected leakage current on AC side| 2. Check if there is ground fault on grid and load side;
    3. Restart inverter. If the fault remains, contact Fortress Power service or your inverter supplier.
    Trip by dci high| Inverter detected high DC injection current on grid port| Restart inverter. If the fault remains, contact Fortress Power service or your inverter supplier.
    PV short circuit| Inverter detected short circuited PV input| c. Check if each PV string is connected correctly;
    d. Restart inverter. If the fault remains, contact Fortress Power service or your inverter supplier.
    GFCI module fault| GFCI module is abnormal| Restart inverter. If fault still exists, contact Fortress Power service or your inverter supplier.
    Bat volt high| Battery voltage too high| Check if battery voltage exceeds 59.9V, battery voltage should be  within  inverter  specification.
    Bat volt low| Battery voltage too low| Check if battery voltage is under 40V, battery voltage should be within  inverter  specification.
    Bat open| Battery is disconnected from inverter| Check battery breaker or battery fuse.
    Offgrid overload| Overload on EPS port| Check if load power on inverter EPS port is within inverter specification.
    Offgrid overvolt| EPS voltage is too high| Restart inverter. If fault still exists, contact Fortress Power service or your inverter supplier.
    Meter reversed| Meter is connected reversely| Check if meter communication cable is connected correctly on inverter and meter side.
    Offgrid dcv high| High DC voltage component on EPS output when running off-grid| Restart inverter. If fault still exists, contact Fortress Power service or your inverter supplier.
    RSD Active| Rapid shutdown activated| Check if the RSD switch is pressed.
    Para phase loss| Phase losing in parallel system| Please confirm that the wiring of the inverter is correct. If the master is set to 3 Phase master, the number of parallel inverters needs to be ≥3. (And the grid input of each inverter should be connected with Grid L1, L2, L3 rightly). If the master is set to 2x 208master, the number of parallel inverters needs to be ≥2. (And the grid input of each inverter should be connected with Grid L1, L2, L3 rightly)
    Para no BM set| Master  isn’t  set  in  the  parallel  system| Please set one of the inverters in the parallel system as the master
    Para multi- BM set| Multiple Masters have been set in the parallel system| There are at least two inverters set as Master in the parallel system, please keep one Master and the other set as Slave

Fan maintenance and Replacement
Please check and clean the fans regularly. The recommended period is 6 months.
Please replace the fan following up the below diagram if there is problem with the fans. Turn off the system and wait for more than 5 minutes before disassembling the machine.
a. Open the wiring cover.
a. Unplug the fan cable.
b. Loosen the screws and remove them.
c. Remove the fan fixing.
d. Loosen the waterproof connector.
e. Remove the fan and replace it
g. After the fan is installed, follow the steps just now to push back and assemble it back.

FORTRESS POWER FP ENVY 8K Envy Inverter 10 kW - Fault on the
LCD2

Data Sheet

| FP-ENVY-8K| FP-ENVY-10K
---|---|---
PV output data
Max. usable input current(A)| 25/25| 25/25
Max. short circuit input current(A)| 31/31| 31/31
Start input voltage(V)| 100| 100
Startup voltage(V)| 140| 140
Full power MPPT voltage range(V)| 170-480| 200-480
DC nominal voltage(V) MPPT tracker| 360| 360
DC voltage range(V)| 100-600| 100-600
MPP operating voltage range(V)| 120-480| 120-480
Max. power(W)| 12000| 15000
Number of MPPT| 2| 2
Inputs per MPPT| 2/2| 2/2
AC Grid output data
Nominal Output Current(A)| 33.3| 41.6A
Max. Output Current(A)| 37| 46
Rated voltage(V)| 240| 240
Operating voltage range(V)| 180-270| 180-270
Continuous power output(W)| @240V 8000| @240V 10000
Operating frequency (Hz)| 50/60| 50/60
Operating frequency range (Hz)| 55-65| 55-65
Phase shift| 0.99@full load| 0.99@full load
Reactive power adjust range| -0.8~+0.8 leading Adjustable| -0.8~+0.8 leading Adjustable
THDI| <3%| <3%
Sync inrush current(A)| 35| 35
EPS AC output data
Nominal output current(A)| 33.3| 41.6
Nominal output voltage(V)| (240V) (120/240V) (120V/208V)| (240V) (120/240V) (120V/208V)
Continuous output power (VA)| 8000| 10000
Operating frequency (Hz)| 60| 60
Peak power (VA)| 2xPn, 0.5s| 2xPn, 0.5s
THDV| <3%| <3%
Switching Time (ms)| <20| <20
Efficiency
Max. Efficiency @ PV to grid| 97.5%| 97.5%
Max. Efficiency @ battery to grid| 94%| 94%
CEC Efficiency| 96.9%| 96.9%
Battery data

Type| Lead-acid battery/Lithium battery/No Battery| Lead-acid battery/Lithium battery/No Battery
Max. charge current(A)| 167| 210
Max. discharge current(A)| 167| 210
Nominal voltage(V)| 48| 48
Voltage range(V)| 48-56 Fortress Power Batteries| 48-56 Fortress Power Batteries
Min-Max. voltage(V)| 40-60| 40-60
General Data
Integrated disconnect| DC switch| DC switch
Reverse polarity protection| Yes| Yes
DC switch rating for each MPPT| Yes| Yes
Output over-voltage protection varistor| Yes| Yes
Output over current protection| Yes| Yes
Ground fault monitoring| Yes| Yes
Grid monitoring| Yes| Yes
Pole sensitive leakage current Monitoring unit| Yes| Yes
AFCI| Yes| Yes
RSD| Yes| Yes
Dimensions(mm)| 750520285mm (29.520.511.25 inch)| 750520285mm (29.520.511.25 inch)
Weight(kg)| 50kg(110 Ibs)| 50kg(110 Ibs)
Degree of protection| NEMA4X / IP 65| NEMA4X / IP 65
Cooling concept| FAN| FAN
Topology| Transformer-less| Transformer-less
Relative humidity| 0-100%| 0-100%
Altitude(m)| <2000m| <2000m
Operating Temperature Range (℃)| -25~60℃,>45℃ Derating| -25~60℃,>45℃ Derating
Noise emission(dB)| <50dB| <50dB
Internal consumption (W| 15| 15
Display| Touch color screen| Touch color screen
Communication interface| Rs485/ Wi-Fi/ CAN| Rs485/ Wi-Fi/ CAN
Standard warranty| 10 Years| 10 Years

Contact Information

For Technical Support Please Contact us at Tech-Support Contact Information
Useful Links
Phone: Tech Support 877-497-6937
Tech Support (Spanish) 215-710-8960
Support Tickets: https://www.fortresspower.com/support/
Warranty Submittal: https://www.fortresspower.com/warranty/
2023 Fortress Power, LLC. All rights reserved.
Information subject to change without notice.
Version FP-8K-MV.3

Documents / Resources

| FORTRESS POWER FP-ENVY-8K Envy Inverter 10 kW [pdf] Instruction Manual
FP-ENVY-8K Envy Inverter 10 kW, FP-ENVY-8K, Envy Inverter 10 kW, Inverter 10 kW
---|---

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

FORTRESS Power User Manuals

Related Manuals