- FORTRESS POWER LFP-5k-48V Lithium Iron Phosphate Battery
- SAFETY
- TRANSPORTATION, HANDELING AND STORAGE
- PRODUCT INTRODUCTION
- INSTALLATION
- PARALLEL CONNECTION
- RETROFITTING
- OPERATING
- TROUBLESCHOOTING
- SERVICE AND MAINTENANCE
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
FORTRESS POWER LFP-5k-48V Lithium Iron Phosphate Battery
SAFETY
General safety precautions
- All types of breakdown of the product may lead to a leakage of electrolyte or flammable gas.
- During installation of the battery, the utility grid, solar input must be disconnected from the Battery Pack wiring. Wiring must be carried out by qualified personnel. Battery Pack is not user serviceable. High voltage or current is present in the device. The electronics inside the Battery Pack are vulnerable to electrostatic discharge. Observe the following precautions:
- Risks of explosion
- Do not subject the battery pack to strong impacts.
- Do not crush or puncture the battery pack.
- Do not dispose of the battery pack in a fire.
- Risks of fire
- Do not expose the battery pack to temperatures in excess of 122 ℉.
- Do not place the battery pack near a heat source such as a fireplace.
- Do not expose the battery pack to direct sunlight.
- Do not allow the battery connectors to touch conductive objects such as wires.
- Risks of electric shock
- Do not disassemble the battery pack
- Do not touch the battery pack with wet hands
- Do not expose the battery pack to moisture or liquids
- Keep the battery pack away from children and animals.
- Risks of damage to the battery pack
- Do not allow the battery pack to come into contact with liquids.
- Do not subject the battery pack to high pressures.
- Do not place any objects on top of the battery pack.
IMPORTANT NOTE: Circuit Breakers, Disconnects and Fuses should be employed throughout several points of a power storage and generation installation to effectively isolate and protect all components of the system to safeguard against faults, short circuits, polarity reversals or a failure of any component in the overall system. Fuses, breakers, wiring ratings and values should be determined by established standards and evaluated by certified electricians, licensed installers, and regional code authorities. The Fortress Lithium Batteries must always be installed with a charge controller and the appropriate settings to protect the batteries from open PV voltage and other high voltage charging sources. The Fortress Battery Management System (BMS) alone will not protect the batteries from these extreme electrical phenomena. Failure to adhere to installation protocol will void the Warranty.
CAUTION: Verify polarity at all connections with a standard volt meter before energizing the system. Reverse polarity at the battery terminals will void the Warranty and destroy the batteries. Do not short circuit the batteries.
Most batteries pose some risk of shock or sparking during the installation and initial wiring and connection process. Wearing insulated gloves, clothing and footwear and using electrically insulated tools are required when working with Fortress Power Lithium Batteries. Cover, restrain or remove jewelry or conductive objects (metal bracelets, rings, belt buckles, metal snaps, zippers, etc.) when working with any electrical or mechanical device. Cover or restrain long hair and loose clothing when working with any electrical or mechanical device.
TRANSPORTATION, HANDELING AND STORAGE
Transportation and Handling
Do not knock, drop, puncture, or crush battery; Do not expose battery to
flames, incinerate or direct sunlight; Do not open battery case or dissemble
battery; Do not lift battery by the terminal cables; Do not vibrate battery;
Do not expose battery to water or other fluids; Do not expose battery to open
flame; Do not place the product nearby highly flammable materials, it may lead
to fire or explosion in case of accident; Store at cool and dry place. (Do not
store in greenhouses and storage areas for hay, straw, chaff, animal feed,
fertilizers, vegetables or fruit products; Store the product on a flat
surface; A ventilated area is strongly recommended for handling the product;
Store the product out of reach of children and animals; Store the product
where it should be minimal dust and dirt in the area; do not transport battery
upside down;
Storage
Do not expose battery to high temperatures. Fortress Lithium Batteries should
be stored out of direct sunlight under the following temperature conditions.
- Storage Temperature (Min./Max.): 41°F/5°C – 95°F/35°C
- Relative Humidity (Min./Max.): 5%~75% RH
Systems should be put into storage at 60% SOC and checked monthly to ensure the system SOC does not fall below 20%. At 20% SOC the battery will self- discharge in approximately 2 months. Also check the voltage every 3 months and recycle every 6 months if the battery is not in use for a long time.
2.3 Response to emergency situations
The battery pack comprises multiple batteries that are designed to prevent
hazards resulting from failures. However, Fortress Power cannot guarantee
their absolute safety.
-
Leaking Batteries
If the battery pack leaks electrolyte, avoid contact with the leaking liquid or gas. If one is exposed to the leaked substance, immediately perform the actions described below.- Inhalation: Evacuate the contaminated area and seek medical attention.
- Contact with eyes: Rinse eyes with flowing water for 15 minutes and seek medical attention.
- Contact with skin: Wash the affected area thoroughly with soap and water, and seek medical attention
- Ingestion: Induce vomiting, and seek medical attention
-
Fire
-
In case of fires, make sure that the extinguisher is available near the battery pack. If possible, move the battery pack to a safe area before it catches fire.
Note: Fire Extinguisher -
Water, carbon dioxide, dry chemical powder and foam are the most effective means to
-
extinguish a Lithium Ferrous Phosphate (LFP) battery fire
-
Use ABC Fire extinguisher, if the fire is not from battery and not spread to it yet.
-
PRODUCT INTRODUCTION
Technical data
INSTALLATION
Safe and reliable installation requires trained and certified technicians. The following discussion of Fortress Power Battery configurations is a basic primer. Due to the variety of systems and components in the field, all possible scenarios are not covered. This is not the purpose of this section of the manual. Refer to professional installers regarding your system and its components and specifications. We encourage you or your installer to contact us with any specific questions for technical support. We are committed to working with you and your installation team to achieve a safe, reliable storage system that will provide years of maintenance free service.
Tools & Materials
Insulated tools and materials are various from projects, following are general recommendations:
- Positive and negative battery cables. We recommend copper cables AWG 2/0. The battery cables are not included. Please refer to the published Battery Cable Sizing Chart for the proper size, based on your system specification.
- Positive and Negative Terminal luge recommendation: M8 (diameter: 8mm or 0.3125 (5/16) inches)
- Conduit size recommendation: 3/4, 1& 1 ¼ inch
- Screwdriver
- RECOMMENDED: Small 48V Charger for trickle-charge purposes
- RS 485 or CAN bus cable(s) are provided in shipment
- OHSA approved personal protective equipment
Inspection
- To check the battery package, type, quantity, appearance and other components
- Check if there is any damage on the battery box
- Check the battery terminals and connections to make sure they are clean, free of dirt, fluids and corrosion
- All battery cables and their connections should be tight, intact, and NOT broken or frayed
- Replace any damaged batteries and cables
- Check torque on terminal bolts
IMPORTANT NOTE: Please inform us within 7 days after receipt of goods if any problems, otherwise we deem clients have no objection to the goods.
Installation Location
The battery pack must be installed indoors. Make sure that the installation
location meets the following conditions:
- The area is completely waterproof.
- The floor is flat and level (Inclination < 15°).
- There are no flammable or explosive materials.
- The optimal ambient temperature is within the range from 59 ℉ to 95 ℉.
- The temperature and humidity are maintained at a constant level.
- There is minimal dust and dirt in the area.
IMPORTANT NOTE: If the ambient temperature is outside the operating range, the battery pack may stop operating to protect itself. Frequent exposure to harsh temperatures may deteriorate the performance and life of the battery pack.
Installation Steps
- Clean cable connections. Broken, frayed, brittle, kinked or cut cables should be replaced
- Install and secure new battery. Do not cross the positive and negative terminals.
- Install the positive cable first. Please make sure the terminals are not connected to any metal mounting, fixture, or body part.
- Recommended terminal torque is 7.0 – 7.7 Nm (5.1 – 5.7 ft-lb)
- Power Cabling for the Fortress Power Battery is not included. System Wiring Basics Refer to published electrical wiring specifications and ratings, refers to the below Battery Cable Sizing Chart. Your qualified installer or application specifications will determine the wire gauge for your system.
CAUTION: Verify polarity at all connections with a standard volt meter before energizing the system. Reverse polarity at the battery terminals will void the Warranty and destroy the batteries. Do not short circuit the batteries.
Connection Terminals
The Fortress Lithium Batteries are equipped with two M8 threaded terminals
with a lock washer and nut. The right-hand stud resides in a red high
temperature molded insert. This connection is for the positive lead. The left-
hand stud resides in a black high temperature insert. This connection is for
the negative lead. 10mm ring terminals along with proper size wiring cables
are required to connect battery to inverter/charger. Do not reverse polarity,
doing so will void warranty. Use a volt meter to check polarity before
connecting terminals.
Water Resistant Plastic Terminal Covers are also included and will be in place
when your units arrive. The boots are to be placed over the cable terminations
and will stretch to form a water-resistant seal around the base of the molded
inserts and terminal connections.
NOTE! Without exception, product experiencing terminal burn out will not be warranted.
Mounting Hardware
The Fortress Power
LFP-5K-48V battery is designed to sit on the floor or mount on the wall. It’s
recommended to put the Batteries on the wall to avoid flooding or in some
cases earthquake vibrations. Please refer to the Fortress Lithium Battery Data
Sheet for weight and dimension.
Mounting the battery pack to a wall
Make sure to leave a space of at last 2.18in (55mm) in between the battery
pack and the wall. At least 5in (127mm) between each unit.
When mounting the battery pack, take note of the following details regarding the Unit’s mounting plate: Unit is approximately 138lbs. Fortress recommends mounting the unit onto metal struts/channels with a Maximum Tensile Strength of at least 200 psi. Use (6) M8 x 1.25mm bolts of at least 35mm in length.
KEY POINTS SUMMARY:
- Each Fortress Lithium Battery contains circuitry that protects the Lithium Ferro Phosphate cells from overcharging, over-discharging, and excessive load amperage. If the values specified are exceeded, the battery will enter a protective shut down state. In some cases, this may result in the need to re-initialize an inverter charger or other pieces of equipment in the installation. In other cases, the inverter’s system settings may be saved within the inverter memory storage and will not need to be reset. This is not an absolute standard but is common among most inverter chargers. Check your inverter manufacturer specifications.
- If the battery enters a self-protective mode, negligible voltage readings will be present until the unit is reset. In some instances, after a prolonged shut down, a charge might need to be manually applied to the energy storage bank. Should this occur, please contact Fortress Power for technical support. Fortress Lithium Batteries are designed to remain robust and safe under most circumstances.
- Although each Fortress Lithium Battery contains circuitry that protects the Lithium Ferro Phosphate cells from overcharging, over-discharging and excessive load amperage, Fortress Lithium Batteries must always be installed with a charge controller and the appropriate settings to protect the batteries from open PV and other high voltage sources. Fortress Lithium Batteries alone will not protect from extreme electrical phenomena.
- GRID TIED SYSTEMS: Once the Fortress Lithium Battery has been installed, turn on the entire system to test. Once testing has been completed, please disconnect the batteries from the load center until your local Utility Inspector is ready to turn on the entire system. The charge controllers and inverter monitoring systems can drain the Fortress Lithium Batteries over an extended period when the entire system is not fully operational due to the electrical draw of the system components.
- OFF GRID SYSTEMS: Do not connect the Fortress Lithium Batteries until the entire system is ready to turn on and is fully operational.
- See Charge Controller Settings in the Appendix of this manual. Fortress Lithium Batteries are compatible with almost all Inverter Chargers and Charge Controllers. Please contact Fortress Power to learn the recommended settings for any device not explicitly covered in this manual.
Final Connection of the Installation
Final installation and operation guidelines will be dictated by your
Electrician and Installer based on the overall properties of and procedures
for the equipment in your installation and any code requirements that apply to
your region. Fortress Power technicians and sales staff are available to
provide any additional information on the Fortress Lithium Batteries as
needed. Please be aware of the potential electrical hazards before interacting
with any and all electrical or mechanical devices. Please take all necessary
safety precautions in your projects and installations.
PARALLEL CONNECTION
Fortress Lithium Batteries with the same capacity may be connected in parallel for up to 2 units only. All wires should be an appropriate gauge and constructed to handle the loads that will be placed upon it. Heavy gauge, high strand copper wire is the industry standard due to its stability, efficiency and overall quality. A qualified installer should understand this and must adhere to the industry standard and published electrical guidelines. Please follow the procedure to parallel LFP-5K-48V batteries.
- Prepare 4 of 2/0 AWG Battery Cables in the same length and “+” and “–“ terminal busbar.
- Check all Battery voltages. Use the Voltmeter to measure each battery’s voltage via positive and negative terminal sitting on the top of the battery. The voltage difference between/among the batteries must be smaller than 0.2 V. If not, please use charge controller or inverter to charge the battery with lower voltage to within the required voltage range of 0.2 V.
- Put air breaker in “OFF” position
- Power off the inverter and wait for 5 minutes and longer, before you connect the inverter’s positive terminal to the “+” busbar, and its negative terminal to the “-” busbar.
- Connect the positive and negative common bus to the inverter
- Switch air breaker to “ON” position
- Turn on the inverter.
RETROFITTING
Retrofit Fortress Lithium batteries to an existing system is not recommended. Like all other batteries, Fortress Lithium Battery’s open voltage will diminish during the operation. Parallel batteries with different open voltage may cause reverse currents, which could damage the batteries.
OPERATING
Operating environment
See “3.1 Technical Data” Table on page 5
Charging
Never attempt to charge a battery without first reviewing and understanding
the instructions for the charger being used. Only use a Fortress Power
Approved Lithium Ferro Phosphate (LFP) charger if ancillary charging is
required before installation, testing or troubleshooting. Failure to use a
Fortress Power approved LFP charger will damage the battery and void the
warranty.
CAUTION! Do not attempt to charge the battery below 32 F (0 degrees C). Attempts to charge at subfreezing temperatures can adversely affect State of Health (SOC) and cycle life and will void the warranty; never charge battery if it is frozen; never charge a visibly damaged battery.
Please follow the following steps to use the charger to charge the battery:
- Connect the charger leads to the battery.
- Make sure that the charger lead, both at the charger and the battery side, connections are tight.
- Turn the charger on
Discharging
- Do not discharge battery below operating voltage
- Do not discharge battery at rates greater than maximum continuous current
- Do not operate in conditions that will exceed the internal operating temperatures of the battery
Parameter set up guide in Charger/Inverter
Before commissioning the energy storage system, the appropriate controller and
inverter settings must be programmed per the manufacturer’s recommendations.
Consult the manufacturer’s manuals and/or access technical support (Darfon,
Schneider, Outback, SMA, Sol-Ark, Magnum, Outback).
Although Fortress Lithium batteries can perform at very high rates and depths
of discharge within a very wide temperature range, in order to achieve
extended life cycles and to comply with the Warranty, the following guidelines
should be followed:
Understand Charge Stage
- Bulk Charge: Charge at Constant Current (CC) to Bulk/Absorb Voltage
- Absorption Charge: Maintain Constant Bulk/Absorb Voltage (CV)
- Terminate when charge current drops below 0.05C
- Unlike Lead Acid batteries, Lithium Ferro Phosphate batteries do not require Float Charge
TROUBLESCHOOTING
The Battery BMS provides multiple level protection function:
- Over Charge Voltage Protection
- Over Discharge Protection
- Over Current Protection for Discharge Via Thermal Control
- Short Circuit Protection
- ON/OFF Switch
IMPORTANT! In the event of a fault the battery protection circuit will open its internal relay/mosfet disconnecting the negative battery terminals form the internal cells. The battery uses a relay/mosfet and precautions should be taken to reduce voltage spikes and large inductance in the application.
IMPORTANT! Negligible voltage readings will be present If batteries enter a self-protective mode. In some instances, after a prolonged shutdown, a charge might need to be manually applied to the energy storage bank. Should this occur, please contact Fortress Power for technical support. Fortress Lithium Batteries are designed to remain robust and safe under most circumstances
SERVICE AND MAINTENANCE
Batteries should be carefully inspected on a regular basis in order to detect and correct potential problems. This routine should be started when the batteries are first received.
References
- Leading Clean Energy Storage Provider | Lithium Battery Storage
- Browse Fortress Resources For Products Manuals And Warranty
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>