IRONRIDGE CAMO-01-M1 Universal Hidden End Clamp Installation Guide

June 12, 2024
IRONRIDGE

CAMO-01-M1 Universal Hidden End Clamp

Installation

Slide CAMO into rail channel far enough to clear the module frame. CAMO requires 6″ of clearance from end of rail.

Place module on rails (module cells not shown for clarity).

Pull CAMO towards rail ends, at 45 deg angle, so the bonding bolt contacts the module flange edge.

Rotate handle with an upwards motion until CAMO Snaps into rail channel. Ensure Camo bonding pins are fully seated on top of module frame.

Module Compatibility and Certifications

UL 2703
Conforms to STD UL 2703 (2015) requirements.
See IronRidge Flush, Tilt, or Ground Mount
Manuals for full ratings and list of compatible
modules.

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals