MRCOOL MAC17024A AC Split System Installation Guide
- June 12, 2024
- MrCOOL
Table of Contents
- MRCOOL MAC17024A AC Split System
- INSTALLATION INSTRUCTIONS
- General
- Installation
- Refrigeration Piping
- INDOOR EXPANSION VALVE INSTALLATION
- EQUALIZER LINE INSTALLATION
- SENSING BULB INSTALLATION
- Refrigerant Piping – Brazing Procedures
- Leak Test and Evacuation
- EVACUATION
- Electrical Wiring
- Start-Up
- Maintenance
- Homeowner Information
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
MRCOOL MAC17024A AC Split System
The Signature Series is NOT designed for amateur installation. Installation SHOULD be performed by an authorized technician. Please read this manual carefully before installation and keep it for future reference.
INSTALLATION INSTRUCTIONS
This manual must be left with the homeowner for future reference.
- This is a safety alert symbol and should never be ignored. When you see this symbol on labels or in manuals, be alert to the potential for personal injury or death.
WARNING
Installation and servicing of air conditioning equipment can be hazardous
due to internal refrigerant pressure and live electrical components. Only
trained andthis equipment. Installation and service performed by personal
injury, or death.
WARNING
ELECTRICAL SHOCK HAZARD!
Risk of electrical shock. Disconnect all remote power supplies before
installing or servicing any portion of the system. Failure to disconnect power
supplies can result in property damage, personal injury, or death.
WARNING
Sharp metal edges can cause injury. When installing the unit, use care to
avoid sharp edges. Manufactured By MRCOOL, LLC Hickory, KY 42051
General
Read this entire instruction manual, as well as the instructions supplied in separate equipment, before starting the installation. Observe and follow all warnings, cautions, instructional labels, and tags. Failure to comply with these instructions could result in an unsafe condition and/or premature component failure. These instructions are intended as a general guide only national or local codes in any way. The installation must comply with all provincial, state, and local codes as well as the National Electrical Code (U.S.) or Canadian Electrical Code (Canada). Compliance should be determined prior to installation. This unit uses R-410A, which is an ozone-friendly HFC refrigerant. The unit must be installed with a matching indoor coil and line set. A filter drier approved for use with R-410A is installed in the unit.When servicing or repairing HVAC components, ensure the fasteners are appropriately tightened. Table 1 shows torque values for fasteners.
Fastener | Torque |
---|---|
Stem Caps | 8 ft. lbs. |
Service Port Caps | 8 ft. lbs. |
Sheet Metal Screws | 16 in. lbs. |
#8 Machine Screws | 16 in. lbs. |
#10 Machine Screws | 28 in. lbs. |
Compressor Bolts | 90 in. lbs. |
Inspection of Shipment
Upon receipt of equipment, carefully inspect it for possible shipping damage.
If damage is found, it should be noted on the carrier’s freight bill. Take
special care to examine the unit inside the carton if the carton is damaged.
Any concealed damage discovered should be reported to the last carrier
immediately, preferably in writing, and should include a request for
inspection by the carrier’s agent. If any damages are discovered and reported
to the carrier DO NOT INSTALL THE UNIT, as claim may be denied. ordered.
Safety Precautions
Follow all safety codes. Wear safety glasses and work gloves. Use a quenching
cloth for brazing operations. thoroughly and follow all warnings or cautions
attached to the unit.
- Always wear proper personal protection equipment.
- Always disconnect electrical power before removing the panel or servicing equipment.
- Keep hands and clothing away from moving parts.
- Handle refrigerant with caution; refer to proper MSDS from refrigerant suppliers.
- Use care when lifting, avoid contact with sharp edges.
Installation
NOTE: In some cases, noise in the living area has been traced to gas pulsations from improper installation of equipment.
-
Locate unit away from windows, patios, decks, etc. where unit operation sounds may disturb customers.
-
Leave some slack between structure and unit to absorb vibration.
-
Place a sound-absorbing material, such as Isomode, under the unit if it will be installed in a location or position that will transmit sound or vibration to the living area or adjacent buildings.
-
In heavy snow areas, do not locate the unit where drifting snow will occur. The unit base should be elevated above the depth of average snow.
NOTE: Elevation of the unit may be accomplished by constructing a frame using suitable materials. If a support frame is constructed, it must not block drain holes in unit base. -
When installed in areas where low ambient temperatures exist, locate the unit so winter prevailing winds do not blow directly into the outdoor coil.
-
Locate unit away from overhanging roof lines which would allow water or ice to drop on, or in front of, coil or into unit.
When outdoor unit is connected to factory-approved indoor unit, the outdoor unit contains a system refrigerant charge for operation with the matching indoor unit when connected by 15 ft. of field-supplied tubing. For proper unit operation, check refrigerant charge using charging information located on control box cover.
Outdoor Section
Zoning ordinances may govern the minimum distance the condensing unit can be
installed from the property line.
Install on a Solid, Level Mounting Pad
The outdoor section is to be installed on a solid foundation. This foundation
should extend a minimum of 2″ (inches) beyond the sides of the outdoor
section. To reduce the possibility of noise transmission, the foundation slab
should NOT be in contact with or be an integral part of the building
foundation. See Figure 1. If conditions or local codes require the unit be
attached to pad or mounting frame, tie-down bolts should be used and secured
to unit base pan.
Elevate Unit
CAUTION
Accumulation of water and ice in a base pan may cause equipment damage.
Elevate the unit per local climate and code requirements to provide clearance above the estimated snowfall level and ensure adequate drainage of the unit. Use snow stands in areas where prolonged freezing temperatures are encountered. If conditions or local codes require the unit be attached to a pad or mounting frame, tie-down bolts should be used and fastened through knockouts provided in the unit base pan.
Clearance Requirements
When installing, allow sufficient space for airflow clearance, wiring, refrigerant piping, and service. For proper airflow, quiet operation, and maximum efficiency. Position so water, snow, or ice from the roof or eaves cannot fall directly on the unit. Refer to Table 2 for installation clearances.
Location | Clearance |
---|
Sides
| 1st side*| 30”
2nd side| 36”
3rd side| 12”
4th side| 6”
Top**| 48”
Between units| 24”
- Must be one of the sides adjacent to the control box.
** Maximum soffit overhand is 36″
Table 2. Clearances
DO LOCATE THE UNIT:
- With proper clearances on sides and top of unit
- On a solid, level foundation or pad (unit must be level to within ± 1/4 in./ft. per compressor manufacturer
- To minimize refrigerant line lengths
DO NOT LOCATE THE UNIT:
- On brick, concrete blocks or unstable surfaces
- Near clothes dryer exhaust vents where debris accumulates
- Near sleeping area or near windows
- Under eaves where water, snow or ice can fall directly on the unit
- With clearance less than 2 ft. from a second unit
- With clearance less than 4 ft. on top of unit
Rooftop Installations
Install unit at a minimum of 6” above surface of the roof to avoid ice buildup
around the unit. Locate the unit above a load bearing wall or area of the roof
that can adequately support the unit. Consult local codes for rooftop
applications. If unit cannot be mounted away from prevailing winds, a wind
barrier should be constructed. Due to variation in installation applications,
size and locate barrier according to the best judgment of the installer.
Refrigeration Piping
- Use only refrigerant grade copper tubes.
- Split systems may be installed with up to 50 feet of line set (no more than 20 feet vertical) without special consideration (see long line set guidelines).
- Ensure that vapor and liquid tube diameters are appropriate to capacity of unit.
- Run refrigerant tubes as directly as possible by avoiding unnecessary turns and bends.
- When passing refrigerant tubes through the wall, seal opening with RTV or other silicon-based caulk.
- Avoid direct tubing contact with water pipes, duct work,
- Do not suspend refrigerant tubing from joists and studs with a rigid wire or strap that comes in direct contact with tubing.
- Ensure that tubing insulation is pliable and completely surrounds vapor tube.
It is important that no tubing be cut or seals broken until you are ready to actually make connections to the evaporator and to the condenser section. DO NOT remove rubber plugs or copper caps from the tube ends until ready to make connections at evaporator and condenser. Under no circumstances leave the lines open to the atmosphere for any period of time, if so unit requires additional evacuation to remove moisture.
Model
| Line Sizes
---|---
Liquid Line| Suction Line
18| 3/8| 3/4
24| 3/8| 3/4
30| 3/8| 3/4
36| 3/8| 7/8
42| 3/8| 7/8
48| 3/8| 7/8
60| 3/8| 1-1/8
- Fittings should be supplied by the installer.
Be extra careful with sharp bends. Tubing can “kink” very easily, and if this occurs, the entire tube length will have to be replaced. Extra care at this time will eliminate future service problems. It is recommended that vertical suction risers not be up-sized. Proper oil return to the compressor should be maintained with suction gas velocity.
Filter Drier
and reliability. If the drier is shipped loose, it must be void, if the drier
is not installed.
Installation of Line Sets
DO NOT fasten liquid or suction lines in direct contact with the floor or
ceiling joist. Use an insulated or suspension type of hanger. Keep both lines
separate, and always insulate the suction line. Liquid line runs (30 feet or
more) in an attic will require insulation. Route refrigeration line sets to
minimize length. DO NOT let refrigerant lines come in direct contact with the
foundation. When running refrigerant lines through the foundation or wall,
openings should allow for a sound and vibration-absorbing material to be
placed or installed between the tubing and the foundation. Any gap between the
foundation or wall and refrigerant lines should be filled with a vibration-
damping material.
CAUTION
If ANY refrigerant tubing is required to be buried by state or local codes,
provide a 6 inch vertical rise at service valve.
Installation into an Existing R-22 System
If the unit will be installed in an existing system that uses an indoor unit
or line sets charged with R-22 refrigerant, installer must perform the
following procedures to convert the system to an R-410A system.
Remove Existing Fixed Orifice (if applicable)
- On fully cased coils, remove the coil access and plumbing panels.
- Remove any shipping clamps from the liquid line and distributor assembly.
- Using two wrenches, disconnect liquid line from liquid line orifice housing. Take care not to twist or damage distributor tubes during this process.
- Remove and discard fixed orifice, valve stem assembly (if present) and Teflon® washer (see Figure 3).
- Use a field-provided fitting to temporarily reconnect the liquid line to the indoor unit’s liquid line orifice housing.
Remove Existing Expansion Valve (if applicable)
- On fully cased coils, remove the coil access and plumbing panels.
- Remove any shipping clamps from the liquid line and distributor assembly.
- Disconnect the equalizer line from the check expansion valve equalizer line fitting on the vapor line.
- Remove the vapor line sensing bulb.
- Disconnect the liquid line from the check expansion valve at the liquid line assembly.
- Disconnect the check expansion valve from the liquid line orifice housing. Take care not to twist or damage distributor tubes during this process.
- Remove and discard the check expansion valve and the two Teflon® rings (see Figure 4).
- Use a field-provided fitting to temporarily reconnect the liquid line to the indoor unit’s liquid line orifice housing.
Flushing Line Sets
If the unit will be installed in an existing system that uses an indoor unit
or line sets charged with R-22 refrigerant, the installer must perform the
following flushing procedure.
NOTE: Existing system components including line set and indoor co must be an AhR match with the unit in order roman warranty requirements.
WARNING
Refrigerant must be reclaimed in accordance with national and local codes
CAUTION
Do NOT attempt to flush and re-use existing line sets or co when my system
contains contaminants (I.e.. compressor burn out)
NOTE
In lieu of R-410A. an industry-standard flushing agent may also be used
NOTE
“Clean refrigerant” is any refrigerant in a system that has not had compressor
burnout. If the system has experienced burnout, it is recommended that the
existing line set and indoor coil be replaced.
- Connect gauges and equipment as shown in Figure 5.
- Set the recovery machine for liquid recovery and start the recovery machine. Open the gauge set valves to allow the recovery machine to pull a vacuum on the existing system line set and indoor unit coil.
- Position the cylinder of clean R-410A for delivery of liquid refrigerant and open its valve to allow liquid refrigerant to flow into the system through the vapor line valve. Allow the refrigerant to pass from the cylinder and through the line set and the indoor unit coil before it enters the recovery machine.
- After all of the liquid refrigerant has been recovered, switch the recovery machine to vapor recovery so that all of the R-410A vapor is recovered. Allow the recovery machine to pull the system down to 0.
- Close the valve on the inverted R-410A drum and the gauge set valves. Pump the remaining refrigerant out of the recovery machine and turn the machine off.
Refrigerant Piping – Install Indoor Expansion Valve
This outdoor unit is designed for use in systems that include an expansion
valve metering device (purchased separately) at the indoor coil. See the
Product Specifications for approved expansion valve kit match-ups and
application information. The check expansion valve unit can be installed
internally or externally to the indoor coil. In applications where an uncased
coil is being installed in a field-provided plenum, install the
check/expansion valve in a manner that will provide access for future field
service of the expansion valve. Refer to below illustration for reference
during the installation of the expansion valve unit.
INDOOR EXPANSION VALVE INSTALLATION
EQUALIZER LINE INSTALLATION
- Remove and discard either the flare seal cap or flare nut with copper flare seal bonnet from the equalizer line port on the vapor line as illustrated in the figure below.
- Remove the field-provided fitting that temporarily recon- nected the liquid line to the indoor unit’s distributor as- assembly.
- Install one of the provided Teflon® rings around the stubbed end of the check expansion valve and lightly lubricate the connector threads and expose surface of the Teflon® ring with refrigerant oil.
- Attach the stubbed end of the check expansion valve to the liquid line orifice housing. Finger tighten and use anappropriately sized wrench to turn an additional 1/2 turn clockwise as illustrated in the figure above, or tighten to 20 ft-lb.
- Place the remaining Teflon® washer around the other end of the check expansion valve. Lightly lubricate connector threads and expose surface of the Teflon® ring with refrigerant oil.
- Attach the liquid line assembly to the check expansion valve. Finger tighten and use an appropriately sized wrench to turn an additional 1/2 turn clockwise as illustrated in the figure above or tighten to 20 ft-lb.
SENSING BULB INSTALLATION
-
Attach the vapor line sensing bulb in the proper orientation as illustrated to the right using the clamp and screws provided.
NOTE – Though it is preferred to have the sensing bulb installed on a horizontal run of the vapor line, installation on a vertical run of piping is acceptable if necessary.
NOTE – Confirm proper thermal contact between vapor line and check/expansion bulb before insulating the sensing bulb once installed. -
Connect the equalizer line from the check expansion valve to the equalizer vapor port on the vapor line. Finger tighten the flare nut plus 1/8 turn (7 ft-lbs) as illustrated below.
Refrigerant Piping – Brazing Procedures
CUT AND DEBUR
Cut ends of the refrigerant lines square (free from nicks or dents) and debur the ends. The pipe must remain round. Do not crimp end of the line.
CAP AND CORE REMOVAL
Remove service cap and core from both the vapor and liquid line service ports .
- DO NOT CRIMP SERVICE VALVE CONNECTOR WHEN PIPE IS SMALLER THAN CONNECTION
ATTACH THE MANIFOLD GAUGE SET FOR BRAZING LIQUID AND VAPOR LINE SERVICE
VALVES
Flow regulated nitrogen (at 1 to 2 psig) through the low-side refrigeration
gauge set into the liquid line service port valve, and out of the vapor line
service port valve.
- Connect gauge set low pressure side to liquid line service valve (service port).
- Connect gauge set center port to bottle of nitrogen with regulator.
- Remove core from valve in vapor line service port to allow nitrogen to escape.
NOTE
Use a manifold gauge set designed for use on R-410A refrigerant systems.
WARNING
Before brazing, ensure the system is fully recovered of all refrigerant.
Application of a brazing torch to a pressurized system may result in ignition
of the refrigerant and oil mixture. Check the high and low pressures before
applying heat.
WArning
Brazing alloys and flux contain materials which are hazardous to your health.
Avoid breathing vapors or fumes from brazing operations. Perform operations
only in well-ventilated areas. Wear gloves and protective goggles or face
shield to protect against burns. Wash hands with soap and water after handling
brazing alloys and flux.
WRAP SERVICE VALVES
To help protect service valve seals during brazing, wrap water-saturated
cloths around service valve bodies and copper tube stubs. Use additional
water-saturated cloths underneath the valve body to protect the base paint.
FLOW NITROGEN
Flow regulated nitrogen (at 1 to 2 psig) through the refrigeration gauge set
into the valve stem port connection on the liquid service valve and out of the
vapor valve stem port. See steps 3A, 3B and 3C on manifold gauge set
connections.
BRAZE LINE SET
Wrap both service valves with water-saturated cloths as illustrated here and
as mentioned in step 4, before brazing to line set. Cloths must remain water-
saturated throughout the brazing and cool-down process.
WARNING While protecting the service valve seals with water-saturated cloths, ensure that water does NOT enter the system.
IMPORTANT — Allow braze joint to cool. Apply additional water-saturated cloths to help cool brazed joint. Do not remove water-saturated cloths until piping has cooled. Temperatures above 250ºF will damage valve seals.
WARNING
FIRE, PERSONAL INJURY, OR PROPERTY DAMAGE may result if you do not wrap a
water-saturated cloth around both liquid and suction line service valve bodies
and copper tube stub while brazing the line set! The braze, when complete,
must be quenched with water to absorb any residual heat. Do not open service
valves until refrigerant lines and indoor coil have been leak-tested and
evacuated. Refer to Leak Test and Evacuation section of this manual.
PREPARATION FOR NEXT STEP
After all connections have been brazed, disconnect manifold gauge set from
service ports. Apply additional water-saturated cloths to both services valves
to cool piping. Once piping is cool, remove all water-saturated cloths.
Leak Test and Evacuation
LEAK TEST
CONNECT GAUGE SET
-
Connect the high pressure hose of an HFC-410A manifold gauge set to the vapor valve service port.
NOTE – Normally, the high pressure hose is connected to the liquid line port. However, connecting it to the vapor port better protects the manifold gauge set from high pressure damage. -
With both manifold valves closed, connect the cylinder of HFC-410A refrigerant to the center port of the manifold gauge set.
NOTE – Later in the procedure, the HFC-410A container will be replaced by the nitrogen container.
TEST FOR LEAKS
After the line set has been connected to the indoor and outdoor units, check the line set connections and indoor unit for leaks. Use the following procedure to test for leaks:
- With both manifold valves closed, connect the cylinder of HFC-410A refrigerant to the center port of the manifold gauge set. Open the valve on the HFC-410A cylinder (vapor only).
- Open the high pressure side of the manifold to allow HFC-410A into the line set and indoor unit. Weigh in a trace amount of HFC-410A. [A trace amount is a maximum of two ounces (57 g) refrigerant or three pounds (31 kPa) pressure.] Close the valve on the HFC-410A cylinder and the valve on the high pressure side of the manifold gauge set. Disconnect the HFC-410A cylinder.
- Connect a cylinder of nitrogen with a pressure regulating valve to the center port of the manifold gauge set.
- Adjust nitrogen pressure to 150 psig (1034 kPa). Open the valve on the high side of the manifold gauge set in order to pressurize the line set and the indoor unit.
- After a few minutes, open one of the service valve ports and verify that the refrigerant added to the system earlier is measurable with a leak detector.
- After leak testing, disconnect gauges from service ports.
NOTE – Service valve cores remain removed for the following evacuation procedure.
EVACUATION
CONNECT GAUGE SET
NOTE – Remove cores from service valves (if not already done).
- A – Connect low side of manifold gauge set with 1/4 SAE in-line tee to vapor line service valve
- B – Connect high side of manifold gauge set to liquid line service valve
- C – Connect available micron gauge connector on the 1/4 SAE in-line tee.
- D – Connect the vacuum pump (with vacuum gauge) to the center port of the manifold gauge set. The center port line will be used later for both the HFC-410A and nitrogen containers.
EVACUATE THE SYSTEM
-
A – Open both manifold valves and start the vacuum pump.
-
B Evacuate the line set and indoor unit until a slight vacuum is indicated on the micron gauge (approximately 23,000 microns or 29.01 inches of mercury).
NOTE – During the early stages of evacuation, it is desirable to close the manifold gauge valve at least once. A rapid rise in pressure indicates a relatively large leak. If this occurs, repeat the leak testing procedure.
NOTE – The term absolute pressure means the total actual pressure above absolute zero within a given volume or system. Absolute pressure in a vacuum is equal to atmospheric pressure minus vacuum pressure. -
C – When the absolute pressure reaches 23,000 microns (29.01 inches of mercury), perform the following:
- Close manifold gauge valves.
- Close valve on vacuum pump.
- Turn off vacuum pump.
- Disconnect manifold gauge center port hose from vacuum pump. Attach manifold center port hose to a nitrogen cylinder with pressure regulator set to 150 psig (1034 kPa) and purge the hose.
- Open manifold gauge valves to break the vacuum in the line set and indoor unit.
- Close manifold gauge valves.
-
D – Shut off the nitrogen cylinder and remove the manifold gauge hose from the cylinder. Open the manifold gauge valves to release the nitrogen from the line set and indoor unit.
-
E – Reconnect the manifold gauge to the vacuum pump, turn the pump on, and continue to evacuate the line set and indoor unit until the absolute pressure does not rise above 500 microns (29.9 inches of mercury) within a 20-minute period after shutting off the vacuum pump and closing the manifold gauge valves.
-
F – When the absolute pressure requirement above has been met, disconnect the manifold hose from the vacuum pump and connect it to a cylinder of HFC-410A positioned to deliver liquid refrigerant. Open the manifold gauge valve 1 to 2 psig in order to release the vacuum in the line set and indoor unit.
-
G – Perform the following:
- Close manifold gauge valves.
- Shut off the HFC-410A cylinder.
- Reinstall service valve cores by removing the manifold hose from service valve. Quickly install cores with core tool while maintaining a positive system pressure.
- Replace stem caps and finger-tighten them, then tighten an additional one-sixth (1/6) of a turn as illustrated.
-
H – Open the suction service valve first before the liquid valve to release the unit charge into the system. Replace valve caps and tighten (8 ft. lb.). Caps are the primary seal.
Liquid and Suction Line Service Valves
The liquid line and suction line service valves (see Figure
- and service ports are used for leak testing, evacuation, charging, and checking charge.
Each valve is equipped with a service port which has a factory-installed Schrader valve. A service port cap protects the Schrader valve from contamination and serves as the primary leak seal. Each valve is equipped with a service port which has a factory-installed Schrader valve. A service port cap protects the Schrader valve from contamination and serves as the primary leak seal.
To Access the Schrader Port:
- Remove the service port cap with an adjustable wrench.
- Connect gauge to the service port.
- When testing is completed, replace the service port cap. Tighten your finger tight, then an additional 1/6 turn.
To Open the Liquid or Suction Line Service Valve:
- Remove stem cap with an adjustable wrench.
- Use service wrench with a hex-head extension to back the stem out counterclockwise as far as it will go. Use a 3/16″ hex head extension for liquid line service valves and a 5/16″ extension for suction line service valves.
- Replace the stem cap. Tighten finger tight, then tighten an additional 1/6 turn.
To Close Liquid or Suction Line Service Valve:
- Remove the stem cap with an adjustable wrench.
- Use a service wrench with a hex-head extension to turn the stem clockwise to seat the valve. Tighten firmly.
- Replace the stem cap. Tighten finger tight, then tighten an additional 1/6 turn.
Suction Line (Ball Type) Service Valve
Suction line (ball type) service valves function the same way as the other
valves; the difference is in the construction (see Figure 7). The ball valve
is equipped with a service port with a factory-installed Schrader valve. A
service port cap protects theSchrader valve from contamination and serves as
the primary seal
Electrical Wiring
All field wiring must be done in accordance with the National Electrical Code (NEC) recommendations, Canadian Electrical Code (CEC) and CSA Standards, or local codes, where applicable.
WARNING
Electrical Shock Hazard!
Turn OFF electric power before connecting unit, performing any maintenance or removing panels or doors. More than one disconnect may be required to turn off all power. FAILURE TO DO SO COULD RESULT IN BODILY INJURY OR DEATH.
WARNING
Unit must be grounded in accordance with national and local codes. Failure
to ground unit properly can result in personal injury or death.
WARNING
Line voltage is present at all components when unit is not in operation on
units with single pole contactors. Disconnect all remote electric power
supplies before opening access panel. Unit may have multiple power supplies.
Failure to disconnect all power supplies could result in personal injury or
death. Refer to the furnace or blower coil Installation Instructions for
additional wiring application diagrams and refer to unit rating plate for
minimum circuit ampacity and maximum overcurrent protection size.
- Install line voltage power supply to unit from a properly sized disconnect switch. Any excess high-voltage field wiring should be trimmed or secured away from the low voltage field wiring.
- High voltage power connections to 3-phase models is made to “Pig Tail” leads with field-supplied splice connectors.
- Ground unit at unit disconnect switch or to an earth ground. To facilitate conduit, a hole is in the bottom of the control box. Connect conduit to the control box using a proper conduit fitting. Units are approved for use only with copper conductors. 24V Class II circuit connections are made in the low voltage junction box. A complete unit wiring diagram is located inside the unit control box cover.
- Install room thermostat according to thermostat installation instruction and on an inside wall that is not subject to drafts, direct sunshine, or other heat sources.
- Install low voltage wiring from outdoor to indoor unit and from thermostat to indoor unit (see Figure 8).
- Do not bundle any excess 24V control wire inside control box. Run control wire through installed wire tie and tighten wire tie to provide low voltage strain relief high voltage circuits.
Start-Up
CAUTION
If unit is equipped with a crankcase heater, it should be energized 24
hours before unit start-up to prevent compressor damage as a result of
slugging.
- Rotate fan to check for frozen bearings or binding.
- Inspect all factory and field-installed wiring for loose connections.
- After evacuation is complete, open liquid line and suction line service valves to release refrigerant charge (contained in outdoor unit) into system.
- Replace the stem caps and secure finger tight, then tighten an additional 1/6 of a turn.
- Check voltage supply at the disconnect switch. The voltage must be within the range listed on the unit nameplate. If not, do not start equipment until the power company has been consulted and the voltage condition corrected.
- Set the thermostat for cooling demand, turn on the power to indoor blower, and close the outdoor unit disconnect switch to start the unit.
- Recheck unit voltage with the unit running. Power must be within range shown on unit nameplate.
Refrigerant Charging
CAUTIOn
Excessive amounts of liquid refrigerant entering the suction line can
damage the compressor. When adding refrigerant, precautions must be taken to
control the flow of liquid into the system. This can be done by using a liquid
vaporizing adapter or manual control using a sight glass as an indicator.
Units are factory charged with the amount of R-410A refrigerant indicated on
the unit rating plate. This charge is based on a matching indoor coil and
outdoor coil with 15′ line set. For varying lengths of line set, refer to
Table 4 for refrigerant charge adjustment. A blank space is provided on the
unit rating plate to list the actual field charge.
IMPORTANT
Mineral oils are not compatible with R-410A. If oil must be added, it must be
a polyolester oil.
NOTE: Both airflow and refrigerant charge must be monitored for proper system set-up. It may be necessary to alternately check and adjust the airflow and the refrigerant charge. If the system is void of refrigerant, or if the outdoor ambient temperature is cool, use the weigh-in method to charge the unit. Do this after any leaks have been repaired.
- Recover the refrigerant from the unit.
- Conduct a leak check, then evacuate as previously outlined.
- Weigh in the charge according to the total amount shown on the unit nameplate.
If weighing facilities are not available or if unit is being charged during warm weather, use one of the following procedures
- For systems using a fixed orifice on the indoor evaporator and outdoor temperatures above 65°F – charge using the superheat method and table provided on the unit access panel.
- For systems using a TX on the indoor evaporator and outdoor temperature above 60°F – charge in cooling mode using the subcooling method and table provided on the unit access panel. For systems below 60°F – charge in heating mode using the subcooling method and table provided on the unit access panel. Attach low-pressure gauge hose to the auxiliary service port to accesssuction side in heating mode.
NOTE: All unit table values are based on 70 to 80°F indoor return air temperature for cooling mode, and 65°F to 75°F return air temperature for heat mode.
Maintenance
Regular Maintenance Requirements
Your system should be regularly inspected by a qualified service technician.
These regular visits may include (among other things) checks for:
- Motor operation
- Ductwork air leaks
- Coil & drain pan cleanliness (indoor & outdoor)
- Electrical component operation & wiring check
- Proper refrigerant level & refrigerant leaks
- Proper airflow
- Drainage of condensate
- Air filter(s) performance
- Blower wheel alignment, balance & cleaning
- Primary & secondary drain line cleanliness
Air Filter
Inspect air filters at least monthly and replace or clean as required.
Disposable filters should be replaced. Washable filters may be cleaned by
soaking in mild detergent and rinsing with cold water. Allow filter to dry
before reinstalling. Replace filters with the arrows pointing in the direction
of airflow. Dirty filters are the most common cause of poor heating/cooling
performance and compressor failures.
Indoor Coil
If the system has been operated with a clean filter in place, it should
require minimal leaning. It cleaning is needed, call your dealer for service.
Condensate Drain
During cooling season check at least monthly for free flow of drainage and
clean if necessary.
Condenser Coils
Grass cuttings, leaves, dirt, dust, lint from clothes dryers, and foliage from
trees can be drawn into coils by movement of the air. Clogged condenser coils
will lower the efficiency of your unit and could cause damage to the
condenser. Periodically, debris should be brushed from the condenser coils.
Use a soft bristle brush with light pressure only. DO NOT damage or bend
condenser coil fins. Damaged or bent fins may affect unit operation.
WARNING SHARP OBJECT HAZARD!
Condenser coils have sharp edges. Wear adequate body protection on body
extremities (e.g. gloves). FAILURE TO FOLLOW THIS WARNING COULD RESULT IN
BODILY INJURY.
Painted Surfaces
For maximum protection of the unit’s finish, a good grade of automobile wax
should be applied every year. In geographical areas where water has a high
concentration of minerals (calcium, iron, sulfur, etc.), it is recommended
that lawn sprinklers not be allowed to spray the unit. In such applications,
the sprinklers should be directed away from the unit. Failure to follow this
precaution may result in premature deterioration of the unit finish and metal
components. In sea coast areas, special maintenance is required due to the
corrosive atmosphere provided by the high salt concentration in ocean mists
and the air. Periodic washing of all exposed surfaces and coil will add
additional life to your unit. Please consult your installing dealer for proper
procedures in your geographic area.
Homeowner Information
WARNING ELECTRICAL SHOCK HAZARD!
Turn OFF electric power to unit before performing any maintenance or removing panels or doors. FAILURE TO DO SO COULD RESULT IN BODILY INJURY OR DEATH.
Thermostat Operation
The wall-mounted thermostat controls your air conditioner. regarding the model
of thermostat installed.
Fan Switch
In AUTO or INT (intermittent) mode, the blower operates only when the
thermostat calls for heating or cooling. This mode is generally preferred when
humidity control is a priority. The ON or CONT mode provides continuous indoor
blower operation, regardless of whether the compressor is operating. This mode
is required when constant air On models without a fan selection switch, the
fan will cycle with the outdoor unit.
Temperature Indicator
The temperature indicator displays the actual room temperature.
Important System Information
- Your system should never be operated without a clean air filter properly installed.
- Return air and supply air registers should be free from restrictions or obstructions to allow full flow of air.
IF YOUR SYSTEM DOES NOT WORK, BEFORE REQUESTING A SERVICE CALL:
- Ensure thermostat is set below (cooling) or above (heating) room temperature and that the system lever is in the “COOL”, “HEAT” or “AUTO” position.
- Check indoor and outdoor disconnect switches. Confirm circuit breakers are ON or that fuses have not blown. Reset breakers/replace fuses as necessary.
- Inspect the outdoor unit for clogged condenser coils. (grass cuttings, leaves, dirt, dust or lint). Ensure that branches, twigs or other debris are not obstructing the condenser fan.
IF YOUR SYSTEM STILL DOES NOT OPERATE, CONTACT YOUR SERVICING DEALER.
Be sure to describe the problem, and have the model and serial numbers of the
equipment available. If warranty replacement parts are required, the warranty
must be processed through a qualified distribution location
- ELECTRICIAN and/or HVAC TECHNICIAN:
- LICENSE #:
- INSTALLATION DATE:
- INSTALLATION LOCATION:
- SERIAL NUMBER:
The design and specifications of this product and/or manual are subject to change without prior notice. Consult with the sales agency or manufacturer for details.
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>