HOUSE OF ROHL RH0506F1 Tub Filler Rough Valve Instruction Manual

June 12, 2024
HOUSE OF ROHL

HOUSE OF ROHL RH0506F1 Tub Filler Rough Valve Instruction Manual

INSTRUCTION MANUAL MANUEL D’INSTRUCTIONS MANUAL DE INSTRUCCIONES

Tub Filler Rough Valve Soupape de plomberie brute pour remplisseur de baignoire
Válvula para Llave de Tina
(NOTE: ORDER AND INSTALL THE
ROUGH KIT – #RH0506F1)
(REMARQUE : COMMANDER ET INSTALLER LA
TROUSSE DE SOUPAPE DE PLOMBERIE BRUTE NO RH0506F1)
(NOTA: ORDENE E INSTALE EL SET #RH0506F1)

HELPFUL TOOLS

For safety and ease of installation, the use of these helpful tools is recommended.

CONCRETE SUBFLOOR INSTALLATION

When you have a concrete or solid surface, that requires pre fabrica- tion or foundation drilling installation, consider these instructions.

Minimum requirements:

4 inches – Floor cut-out.
3 inches – Base of mounting block to the finished floor. ¾ inch – Concrete subfloor.
Note: Mounting block screws not supplied

  1. Verify the distance of the faucet from the bath to ensure that the water will flow into the bath and mark out for drill holes.

  2. Note: Check that the water connections on mounting block are aligned with the

  3. Please note: The center of the spout outlet to the center of the single post support differs slightly for different Please adjust the location of the drain as needed.

  4. Install mounting block to concrete (Floor anchors not supplied.) Verify subfloor is level.

  5. The hot and cold supplies need to be installed in the correct

  6. The cold is under the spout and the hot is in back of the

  7. Check for

  8. Confirm the finish floor Rough in for concrete installation complete.

Note: There are no shutoffs, but the hot and cold supplies do have plugs to remain in place during construction!

NOTE: When laying the finish floor, DO NOT COVER mounting bolts above and below the rough valve.

  1. “To install the trim” – After the finish floor is in place: Shut off the water
  2. Remove plugs and grub screws.

TUB FILLER ROUGH

WOODEN FLOOR INSTALLATION

When you have access to the bottom of the floor under the tub filler, please consider these instructions.

Attention Plumber

Note: Please check model specifications of tub filler before installation of the tub filler rough.

  1. Remove screws and
  2. Position mounting
  3. Mark drill holes for mounting

Note: Check the alignment of the tub spout one last time before positioning the mounting block.

Position upper plate over marked
Mark drill holes for upper plate

1. Drill marked holes with ¼ in drill.

Install the rubber washer then the upper plate and install the mounting block over drill holes. Install screws into mounting block and through upper plate/washer. Note: Arrow for approx. faucet spout.

  1. The hot and cold supplies need to be installed in the correct
    Note the position of the spout alignment for where correct water connections are made. The COLD is under the spout and the HOT is in back of the spout for certain models.

  2. Check for Confirm the finish floor height

NOTE: There are no shutoffs, but the hot and cold supplies do have plugs to remain in place during construction

7A. From under floor: Install lower plate.
7B. From above floor: Install clamping screws to lower plate and tighten.

Read More About This Manual & Download PDF:

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

HOUSE OF ROHL User Manuals

Related Manuals