DMEGC L02-48100 Lithium-Ion Battery Installation Guide
- June 10, 2024
- DMEGC
Table of Contents
L02-48100 Lithium-Ion Battery
Installation Guide
Packing List
Note: The quick installation guide briefly describes required installation steps. If you have any questions during the installation, please refer to the User Manual for more detailed information.
Installation Prerequisites
Make sure that the installation location meets the following conditions:
- The building is designed to withstand earthquakes
- The location is far away from the sea, to avoid sea water and humid air
- The floor is flat and level
- There are no flammable or explosive materials nearby
- The ambience is shady and cool, keep away from heat as well as direct sunlight
- The temperature and humidity stay at a constant level
- There is minimal dust and dirt in the area
- There is no corrosive gases present, including ammonia and acid vapor
- The ambient temperature is with the range from 0℃ to 55℃ and the optimal ambient temperature is between 15℃ and 35℃
Notice
The L02 battery is rated at IP65 and thus can be installed outdoors as well as
indoors. However, if installed outdoors, do not expose the battery to directly
sunlight and moisture
Notice
If the ambient temperature is beyond the operating range, the battery pack
will stop operating to protect itself. The optimal temperature range for the
battery pack to operate is from 15℃ to 35℃. Frequent exposure to harsh
temperatures may deteriorate the performance and lifetime of the battery
module.
Battery Installation
- Floor-mounting Installation
-Remove the back screws and bracket-Move the battery to proper position - Wall-mounting Installation
-Mark the position of the holes Bracket for wall-mounting
-Screw the expansion bolts -Drill four holes with a φ8 drill bit
-Depth: at least 40mm -Match the battery with the bracket-Hammer the expansion bolts into the holes-Lock the joint between hanging board and wall bracket with M4 screws
Notice The distance between the bottom of the battery pack and floor shall not exceed 300mm
Ground cable connection
-Crimping Ground terminal
Crimp terminals according to the distance between battery and external ground
point
Communication cable connection
-Crimping CAN plug terminal
Take out CAN plug and RJ45 terminal of inverter| Crimp terminals according to the distance between battery and inverter
Insert CAN plug into battery CAN port and Insert RJ45 terminal into inverter COM port
Caution:
When Crimping CAN plug terminal, only 2,4 and 5 PIN are needed. 4PIN is CAN_H
and 5PIN is CAN_L.2PIN is ground.
Note that the definition of the CAN plug is the same as that of the inverter.
Insert one end of communication parallel cable into last battery right RS485
port and another into next battery left RS485
Communication Wiring Diagram
Notice The distance of parallel battery pack is between 400 and 500mm.
Power cable connection
- Single Battery Work Mode
-Crimping power plug terminalInsert positive plug and negative plug into battery port
-Power Wiring Diagram - Batteries in Parallel Work Mode
-Crimping power plug terminalInsert positive plug and negative plug into battery port
-Power Wiring DiagramNotice The distance of parallel battery pack is between 400 and 500mm.
Inverter brand selection
- Remove the cover plate screws
- Rotate the DIP switch to corresponding number with small tool. For inverter brands corresponding to different numbers, please refer to inverters brand table provided by DMEGC
- Reinstall the cover plate
Wi-fi monitor installation
Take out Wi-fi monitor and plug into the battery
Commissioning
If all the preparatory work is ok, follow these steps to put it in operation.
- Press the POWER button to turn on the L02 battery system
- Check whether the status LED indicator is normal
- Power on the inverter
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>