DMEGC L02-48100 Lithium-Ion Battery Installation Guide

June 10, 2024
DMEGC

L02-48100 Lithium-Ion Battery
Installation Guide

Packing List

Note: The quick installation guide briefly describes required installation steps. If you have any questions during the installation, please refer to the User Manual for more detailed information.

DMEGC L02 48100 Lithium-Ion Battery - Packing ListDMEGC L02 48100 Lithium-Ion Battery - Packing List
1

Installation Prerequisites

Make sure that the installation location meets the following conditions:

  • The building is designed to withstand earthquakes
  • The location is far away from the sea, to avoid sea water and humid air
  • The floor is flat and level
  • There are no flammable or explosive materials nearby
  • The ambience is shady and cool, keep away from heat as well as direct sunlight
  • The temperature and humidity stay at a constant level
  • There is minimal dust and dirt in the area
  • There is no corrosive gases present, including ammonia and acid vapor
  • The ambient temperature is with the range from 0℃ to 55℃ and the optimal ambient temperature is between 15℃ and 35℃

Notice
The L02 battery is rated at IP65 and thus can be installed outdoors as well as indoors. However, if installed outdoors, do not expose the battery to directly sunlight and moisture
Notice
If the ambient temperature is beyond the operating range, the battery pack will stop operating to protect itself. The optimal temperature range for the battery pack to operate is from 15℃ to 35℃. Frequent exposure to harsh temperatures may deteriorate the performance and lifetime of the battery module.

Battery Installation

  1. Floor-mounting Installation
    -Remove the back screws and bracketDMEGC L02 48100 Lithium-Ion Battery - back screws-Move the battery to proper positionDMEGC L02 48100 Lithium-Ion Battery - proper position
  2. Wall-mounting Installation
    -Mark the position of the holesDMEGC L02 48100 Lithium-Ion Battery - position of the holes Bracket for wall-mounting
    -Screw the expansion bolts -Drill four holes with a φ8 drill bit
    -Depth: at least 40mm -Match the battery with the bracketDMEGC L02 48100 Lithium-Ion Battery - Figure 2-Hammer the expansion bolts into the holesDMEGC L02 48100 Lithium-Ion Battery - Figure 3-Lock the joint between hanging board and wall bracket with M4 screws

Notice The distance between the bottom of the battery pack and floor shall not exceed 300mm

Ground cable connection

-Crimping Ground terminal
Crimp terminals according to the distance between battery and external ground point

DMEGC L02 48100 Lithium-Ion Battery - Ground terminal

Communication cable connection

-Crimping CAN plug terminal

DMEGC L02 48100 Lithium-Ion Battery - plug

Take out CAN plug and RJ45 terminal of inverter| Crimp terminals according to the distance between battery and inverter

Insert CAN plug into battery CAN port and Insert RJ45 terminal into inverter COM port

Caution:
When Crimping CAN plug terminal, only 2,4 and 5 PIN are needed. 4PIN is CAN_H and 5PIN is CAN_L.2PIN is ground.
Note that the definition of the CAN plug is the same as that of the inverter.

DMEGC L02 48100 Lithium-Ion Battery - communication parallel
cable

Insert one end of communication parallel cable into last battery right RS485 port and another into next battery left RS485
Communication Wiring Diagram

DMEGC L02 48100 Lithium-Ion Battery - Wiring Diagram

Notice The distance of parallel battery pack is between 400 and 500mm.

Power cable connection

  1. Single Battery Work Mode
    -Crimping power plug terminalDMEGC L02 48100 Lithium-Ion Battery - plug 1DMEGC L02 48100 Lithium-Ion Battery - Insert plugInsert positive plug and negative plug into battery port
    -Power Wiring DiagramDMEGC L02 48100 Lithium-Ion Battery - Figure 5
  2. Batteries in Parallel Work Mode
    -Crimping power plug terminalDMEGC L02 48100 Lithium-Ion Battery - plug 1DMEGC L02 48100 Lithium-Ion Battery - Insert plugInsert positive plug and negative plug into battery port
    -Power Wiring DiagramDMEGC L02 48100 Lithium-Ion Battery - Parallel Work ModeNotice The distance of parallel battery pack is between 400 and 500mm.

Inverter brand selection

  • Remove the cover plate screws
  • Rotate the DIP switch to corresponding number with small tool. For inverter brands corresponding to different numbers, please refer to inverters brand table provided by DMEGCDMEGC L02 48100 Lithium-Ion Battery - DIP switch
  • Reinstall the cover plateDMEGC L02 48100 Lithium-Ion Battery - cover plate

Wi-fi monitor installation

Take out Wi-fi monitor and plug into the battery

DMEGC L02 48100 Lithium-Ion Battery - plug into the
battery

Commissioning

If all the preparatory work is ok, follow these steps to put it in operation.

  1. Press the POWER button to turn on the L02 battery system
  2. Check whether the status LED indicator is normal
  3. Power on the inverterDMEGC L02 48100 Lithium-Ion Battery - Commssioning

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals