DMEGC L01-48100 Lithium-Ion Battery Installation Guide
- October 30, 2023
- DMEGC
Table of Contents
- L01-48100 Lithium-Ion Battery
- Product Information
- Product Usage Instructions
- Packing List
- Installation Prerequisites
- Battery Installation
- Ground cable connection
- Communication cable connection
- Power cable connection
- Inverter brand selection
- Commissioning
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
L01-48100 Lithium-Ion Battery
Product Information
The L01-48100 Lithium-ion Battery is a battery pack that is rated at IP20 and must be installed indoors. The battery pack comes with positive plug (+) Orange x2, negative plug (-) Black x2, and CAN Plug x1. The product also includes rack-mounting installation accessories (optional), floor-mounting installation accessories (optional), and wall-mounting installation accessories (optional). The optimal temperature range for the battery pack to operate is from 15 to 35. Frequent exposure to harsh temperatures may deteriorate the performance and lifetime of the battery module.
Product Usage Instructions
Before installing the L01-48100 Lithium-ion Battery, make sure that the ambient temperature is within the operating range of 15 to 35. Follow the installation steps provided below:
Rack-mounting Installation
- Install another pair of brackets on the first one.
- Screw them with four butterfly screws.
- Insert another L01 battery into the brackets.
- Screw the battery with the bracket.
- Install the front and back brackets with bottom brackets.
- Insert the L01 battery into the brackets.
- Screw the battery with the bracket.
Floor-mounting Installation
- Remove the side plate of L01 battery.
- Screw front panel and left, right floor-mounting bracket with the battery.
- Pay attention to the logo position.
- Drill two holes with an 8 drill bit and the depth is at least 40mm.
- Screw the battery.
- Hammer the expansion tubes into the holes.
- Do not stack more than eight batteries.
Wall-mounting Installation
- Remove the side plate of L01 battery.
- Screw front panel and hanging bracket with the battery.
- Pay attention to the logo position.
- Screw the expansion bolts.
- Match the battery with the bracket.
- Lock the joint between hanging board and wall bracket with M4 screws.
- Mark the position of the holes.
- Drill four holes with an 8 drill bit and depth at least 40mm.
- Hammer the expansion bolts into the holes.
- The height of the wall-mounting bracket should be 300mm.
Ground Cable Connection
Crimp ground terminal according to the distance between battery and external
ground point. Connect external ground point with ground terminal.
Packing List
Note : The quick installation guide briefly describes required installation steps. If you have any questions during the installation, please refer to the User Manual for more detailed information.
Rack-mounting
Installation accessories(optional)
Notice The screws and cables are not listed in above accessories.
Wall-mounting Installation accessories(optional)
Notice The screws and cables are not listed in above accessories.
Floor-mounting
Installation accessories(optional)
Notice The screws and cables are not listed in above accessories.
Installation Prerequisites
Make sure that the installation location meets the following conditions:
- The building is designed to withstand earthquakes
- The location is far away from the sea, to avoid sea water and humid air
- The floor is flat and level
- There are no flammable or explosive materials nearby
- The ambience is shady and cool, keep away from heat as well as direct sunlight
- The temperature and humidity stay at a constant level
- There is minimal dust and dirt in the area
- There is no corrosive gases present, including ammonia and acid vapor
- The ambient temperature is with the range from 0℃ to 55℃ and the optimal ambient temperature is between 15℃ and 35℃
Notice: The L01 battery is rated at IP20 and thus must be installed
indoors.
Notice : If the ambient temperature is beyond the operating range, the
battery pack will stop operating to protect itself. The optimal temperature
range for the battery pack to operate is from 15℃ to 35℃. Frequent exposure to
harsh temperatures may deteriorate the performance and lifetime of the battery
module.
Battery Installation
Rack-mounting Installation
Install the front and back brackets with bottom brackets
Insert the L01 battery into the brackets
Screws the battery with the bracket – Install another pair of brackets on the
first one
– screws them with four butterfly screws – Insert another L01 battery into the
brackets
– Screws the battery with the bracket Notice: No more than eight batteries
are allowed to stacked.
Floor-mounting Installation
Wall-mounting Installation
Ground cable connection
Communication cable connection
Power cable connection
Single Battery Work Mode
-Crimping power plug terminal
Power Wiring
Diagram Batteries in
Parallel Work Mode
Crimping power plug terminal Batteries in Parallel Work Mode
Power Wiring Diagram
Set DIP switch
Single battery settings
Set the DIP switch as address 1
Multiple batteries in parallel settings
- Set the master battery DIP switch as address 1
- Set the slave battery DIP switch from address 2 to 8 in turns
Notice The factory setting of DIP switch is address 0
DIP Definition Table
Inverter brand selection
Inverter selected for factory settings
Nothing is need to do
Inverter not selected for factory settings
- Connect to the upper computer for operation
- Insert test plug into RS232 port
Commissioning
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>