CUTTING EDGE POWER CEP440 Off-Grid Solar-Wind Generator User Manual

June 11, 2024
CUTTING EDGE POWER

CUTTING EDGE POWER CEP440 Off-Grid Solar-Wind Generator User Manual
CUTTING EDGE POWER CEP440 Off Grid Solar-Wind Generator User
Manual

Safety Instructions

Please save these instructions

**** General Safety Information

  1. Read all of the instructions and cautions in the manual before
  2. There are no repairable parts for this controller, do not disassemble or attempt to repair the
  3. Keep the controller from the
  4. Make sure all connections with controller are

Charge Controller Safety

  1. NEVER connect the solar panel array to the controller without a battery. The battery must be connected first.
  2. Ensure input voltage does not exceed 150 VDC to pre- vent permanent damage.
  3. Ensure that the output current of the solar panel does not exceed the rated charging current of the controller.

Battery Safety

  1. Do NOT let the positive (+) and negative (-) terminals of
  2. the battery touch each other.
  3. Explosive battery gases may be present while charging. Be certain there is enough ventilation to release the
  4. Be careful when working with large lead-acid batteries. Wear goggles and have fresh water available in case there is contact with the battery acid.
  5. Over-charging and excessive gas precipitation may damage the battery plates and activate material shedding on Too high of an equalizing charge or too long of one may cause damage. Please carefully review the specific requirements of the battery used in the system.

Features

  1. Aluminum shell and tempered glass cover, the controller has good heat dissipation effect.
  2. Built-in BT communication module mobile phone APP operation (Android and IO
  3. Filled with silicon/polyurethane inside for better cooling and waterproofin
  4. Compatible with lead-acid batteries and lithium batteries, support 12 battery system, and can automatically identify the voltage of lead-acid batteries.
  5. Backlit display on the screen, touch button operation.
  6. Built-in reverse connection protection, open circuit protection, high temperature protection, over current/ short circuit protection, all of which are self-healing, no damage to the

Identification Of Parts

Product Instruction

  1. LCD Display Screen
  2. – LED Indicator (PV, BAT, FAULT)
  3. – Touch Screen Button
  4. Grounded Terminal
  5. – Installation Mounting Holes
  6. – External Temperature Sensor Port
  7. RS485 Communication Port
  8. Solar Input Terminals
  9. Battery Terminals
  10. Magnetic Cover

LCD Display Interface

Main Menu Interface

Setting Battery Mode

Battery Type Description NOTE
FLD Flooded Lead Acid battery Parameters seton default, not
Sealed Lead Acid battery (SLD/AGM) adjustable. Battery system voltage

automatically recognized.
GEL| Gel Battery

LCD Display Setting

**

**


Battery
**Voltage

Battery SOC**

Temperature
(Enter the temperature sub-menu, press and hold the button for more than 2s to make the button parameters flash, short press to adjust Celsius/Fahrenheit), Finally, long press to save the parameters.

Error Code

System Wiring
System Wiring

  1. The positive and negative poles of the battery must be connected to the battery terminals of the controller
  2. Connect the positive and negative poles of the solar panel to the PV terminals
  3. Make sure that the Bluetooth of the mobile phone is turned on, and open the APP “Charge Pro 2.0” to enter the setting interface
  4. Note: Please strictly follow the above sequence for connection, otherwise the controller may be damaged. The disassembly sequence is opposite to the wiring one

Caution

  1. First make sure your battery system is 12V / 24V (Lead-acid batteries can automatically identify the battery voltage, if you use lithium batteries, you must manually adjust the voltage to ensure that the battery voltage is consistent with the system voltage)
  2.  Ensure that the maximum open-circuit voltage of the solar system does not exceed 150y.
  3. Ensure that the maximum output current of the solar panel does not exceed 40A. 4.
  4. Ensure that the voltage of the solar panel is higher than the battery voltage.

Wiring Instructions

  1. Remove the magnetic cover. (Pick up


  2. Put the magnetic cover aside


  3. Unscrew the screws. (Counterclockwise)


  4. Plug the cable into the correct port.


  5. Tighten the screws. (Clockwise)


  6. Check the wiring condition and put the magnetic cover

APP operation

  1. Click the “BT icon” in the upper right corner to search for the BT device “PV Charge Pro”

  2. Click the “menuCorner Iconin the upper left corner to check whether BT is connected

  3. Click “Parameter Setting” ****corner to set the parameters.

  4. Click the “unlocked “ ****in the bottom right lO C k shape icon to confirm the unlocking for parameter setting.
    SeIect the battery type, (FLD, SEL, GEL) battery do not need to set other parameters because the voltage is automatically identified by default, and other parameters are in accordance with the default values.2Select LI, you need to manually click the system voltage to set the voltage, other parameters are recommended to follow the default value (the boost charge voltage is allowed to set).Select USE, you can set all parameters

  5. Click to confirm after setting the above parameters.

  6. The  “Real-Time Monitoring” Real-Time Monitorin g **Can  check  the real-time working status of the solar system, and the “Historical Data”   **can  check the historical working status of the solar system.

APP Main interface

APP Main interface
APP Main interface

NO Item Description
1 BT connection Mobile phone BT connection controller
2 Device Information Check the BT connection **status and modify the

display font size**
3|   Battery SOC Information| Display the present batteryry capacity
4| Solar Input Information|  Real-time output voltage of solar panel
5|  PV Voltage| Real-Time Set the charging parameters
6| Charge Mode|  Display the present charge mode: MPPT (Buck) / Boost / Float / Equalize
7|  Equalization charge| If equalization charging is turned on. charge according to the default equalization charging method; If equaliza-tion charging is turned off. you need to disconnect the solar panel and battery, disconnect the Bluetooth device and finally reconnect to restore the off state
8|  Battery Charge Current| Display the real-time charging current of the battery
9| Battery Voltage| Display the real-time voltage of the battery
10| Battery Charge Power| Display the present battery charge power
11| Controler Temperature|
12| Controler Error Info|  See the error code introduction In the manual
13|  Today’s Running Data|  Display system working status at present
14|   Real-Time Monitoring|  Check the real-time working status of the solar system
15| Historical Data|  Check the historical working status of the solar system
16| Parameter Setting| Set the charging parameters of the solar panel to the battery

Lead-acid Battery Working Stag

Battery Instruction

  1. Lead-acid Battery Working Stage @BuIk Charge: Constant current charging, providing the maximum current to the battery until the battery  voltage  reaches the constant voltage stage (boost charging voltage or equalize charging voltage).
  2. @Boost Charge: Constant voltage charging, the battery is charged for 120 minutes at an elevated charging voltage.
  3. Float Charge: After the boost charge, the controller will reduce the battery voltage by reducing the charging current, and let the battery voltage be maintained at the set value of the floating charge voltage. During the floating charge stage, the battery is charged very weakly to ensure that the battery is maintained in a fully charged state. In the floating charge stage, the load can obtain nearly all solar power. If the load exceeds the power that solar energy can provide, the controller will not be able to maintain the battery voltage at the floating charge stage. When the battery voltage is low to the set value of boost charge return voltage, the system will exit the floating charging stage and enter the bulk charging stage again.
  4. @EquaIization: Equalization charging raises the battery voltage to higher than the standard supplementary voltage to charge the battery. Certain types of lead-acid batteries benefit from regular equalization charging, which can agitate the electrolyte, balance the battery voltage, complete a chemical reaction, and prevent battery vulcanization.
    Note: Only FLD, SLD and AGM can perform equalization charging. The equalization charge will be carried out every 30 days, and the charge time is 12O minutes. When the battery is charged in equalization, the boost charge stage will not be performed.

Lithium Battery Working Stage

  1. Bulk Charge: Constant current charging, providing the maximum current to the battery until the battery reaches the boost charge voltage.
  2. Boost Charge: Charge with a constant current. When it is about to be fully charged, the charging current begins to drop, and finally charges with a small current. During this process, the charging voltage is constant to maintain the  boost charge voltage.

BAITERY VOLAGE

LITHIUM BATTERY CHARGING CURVE

Error Code

Error code Cause of failure Solution
E00 No Error /
E02 The battery voltage system is voltage The temperature drops to the

return value
E06| The controller temperature is too higher|
E07| The ambient temperature is too high| D Disconnect the controller and lower the ambient temperature
E10| The input voltage of the solar panel is too high, exceeding 150V| Change the solar panel series-parallel connection, the solar panel is connected in parallel, and the voltage is lower than 150V to recover
E13| The positive and negative connections of the solar panel are reversed.| Change the solar panel series-parallel connection, the solar panel is connected in parallel, and the voltage is lower than 150V to recover
E14| The positive and negative connections of the battery are reversed| Disconnect and reconnect with correct wire polarity. Disconnect and reconnect with correct wire polarity

LED Signal Instruction

L ED NAME LED Color LED Display Signal Indication
PV Creen Off Not In Charge
Steady On In Charge
BAT Green Fast Flash Battery Over Voltage
Steady On Battery On & Normal
FAULT Red Off No Error or Alarm
Steady On System with Error or Alarm

Base Specification

Rated  charging current 4OA
Maximum PV input voltage 1OOV
Maximum input of PV system: 6OOW/I2V; I2OOW/24V
System voltage: l2V/24VAuto (FLD/GEL/SLD Manual (Li/User
Communication function: APP
No-load loss: 12ma (12V),lOma(24V)
Working temperature: -35°C – +45”C/-31°F 113°F
Protection level: IP34
Altitude: s3OOOm
Net weight 2.1KG
Dimensions: 0.65.92.6 (inch)
Installation size: 0.1*2.4(inch)
Installation aperture t 0.2(inch)

Battery Charge Parameter

Battery Types FLD SEL GEL USER LI
Equalizing Charge Voltage 14.8V’n 14.6V’n Default: GEL
Boost Char eg Voltage ‹.6V*n 14.4V*n JR.2V*n Default: GEL Default:

14.2V”n
Floating Charge Voltage| 13.8V”n| Default: GEL| –
Boost Charge Return Voltage| l3.2V’n| Default: GEL| –
Equalization ChargeTime| 2 hour| 2 hour| –| Default: GEL| –
Equalizing ChargeInterval| 3O day| 3O day| –| Default: GEL|
Temperature Compensation| -3mV / 2V /°C| Default: GEL

Note:O

  1. n=1 for 12V system; n=2 for 24V system; n=3 for 36V system; n=4 for 48V system;
  2. The parameters corresponding to the yellow font can be modified by APP, and the other parameters cannot be modified

Controller Dimension

Controller Dimension

Controller Dimension

Controller Dimension

Product Dimension: 8.6’5.9’2.6inch Installation Area Dimension: 8.1”2.4inch Installation Hole Size: 0.2O.2inch Connection Socket Size: 0.30.3inch

CUTTING EDGE POWER CEP440 Off Grid Solar-Wind Generator User
Manual

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals