Intellihot iQ751 Water Heater Owner’s Manual
- June 9, 2024
- Intellihot
Table of Contents
- iQ751 Water Heater
- Air Filter Blocked Alert
- Air Filter Service Alert Maintenance Alert
- Air Filter Switch Wiring Alert
- Blocked Flue Fault
- Blower Fault / Blower Speed Fault
- Blower Speed Signal Fault
- Breaker Tripped
- Cascading Alert (Fault)
- Flue Overheat Fault
- Fuel Type Alert Fuel Type Mismatch
- Heat Exchanger Overheat
- Ignition Fault
- Manifold Inlet/Outlet Wiring Alert
- Pump Alert
- Rough Ignition
- Rumbling
- Water Valve Fault
- Appendix
- Blower/Gas Valve Exploded View
- Wiring Diagram (all wall-hung units)
- Gas Valve
- Documents / Resources
TROUBLESHOOTING GUIDE
(for all Gen II units)
iQ751 Water Heater
This guide contains information for identifying and correcting any issues that
may arise.
Product Support/Warranty
If the water heater requires additional service, please use one of the
following options for contacting Intellihot Technical Support:
-
Call: 309-473-8040 (toll-free 1-877-835-1705), press 1
-
Email: support@intellihot.com
When contacting Technical Support, please have the following information ready: -
Model Number
-
Serial Number
-
Date Purchased/Installed
-
Installation location & application
Suggested Tool List
- Digital Manometer
- Electrical Multimeter
- Flue Gas Analyzer (for NOx & CO2)
- 7mm Socket/Ratchet
-
1 & #2 Phillips Screwdrivers
- Instrument Flat Blade Screwdriver
- Pliers
- Adjustable Wrench
Air Filter Blocked Alert
Air Filter Service Alert Maintenance Alert
Air Filter Switch Wiring Alert
Blocked Flue Fault
Blower Fault / Blower Speed Fault
Blower Speed Signal Fault
Breaker Tripped
Cascading Alert (Fault)
Dead Unit – No Power Up
Flow Sensor Fault
Flue Overheat Fault
Fuel Type Alert Fuel Type Mismatch
Heat Exchanger Overheat
Ignition Fault
Page 1 of 3 Ignition Fault
Manifold Inlet/Outlet Wiring Alert
Pump Alert
Rough Ignition
Rumbling
Inlet/Outlet/Heat Exchanger/Manifold Inlet/Manifold Outlet/Flue Sensor Open/Fault/Shorted
Water Valve Opening Fault
Water Valve Closing Fault
Water Valve Switch Fault
Water Valve Fault
Appendix
BLOWER REPLACEMENT
The blower is located on the top of the heat exchanger
− Shut off the gas to the heater
− Shut off power to the heater by unplugging the unit from the 120 VAC outlet
− remove the front panel (three screws at top and three at bottom)
− Unplug the display cable from the pcb (press plastic tab and pull)
− lift up and remove the front display bracket
− Unplug all the wiring connections from the blower (press the tabs and pull)
− remove the gas valve wiring located behind the blower
− Unplug the HV cable from the DSI
− Remove the gas connection at the top isolating the unit’s gas supply from
the building
− remove phillips screws to remove the aluminum gas fitting at the top the
unit
− remove 4 allen screws to remove the aluminum gas adapter fitting
− remove two plastic taps on top of the cabinet to access the screws securing
the blower
− remove 4 screws securing the blower from the top using a long screwdriver
− remove the entire blower gas valve assembly from the unit
− remove the gas valve 3 torx screws
− install the gas valve on the new blower
− reverse process to assemble the blower back to the heater
− ensure the gasket is installed between the blower and the top housing
− Install the blower gas valve using 4 screws and a long screw driver
− Install the aluminum gas adapter on top of the gas valve
− Install the gas fitting and secure it using 4 screws to the cabinet
− Install the building gas supply
− Install the blower wiring, HV cable and gas valve wiring
− turn gas supply back on and check for any gas leaks
− turn water on and plug the heater to the outlet
GAS VALVE REPLACEMENT
The blower gas valve assembly is located on the top of the heat exchanger
− Shut off the gas to the heater
− Shut off power to the heater by unplugging the unit from the 120 VAC outlet
− remove the front panel (three screws at top and three at bottom)
− Unplug the display cable from the pcb (press plastic tab and pull)
− lift up and remove the front display bracket
− Unplug all the wiring connections from the blower (press the tabs and pull)
− remove the gas valve wiring located behind the blower
− Unplug the HV cable from the DSI
− Remove the gas connection at the top isolating the unit’s gas supply from
the building
− remove phillips screws to remove the aluminum gas fitting at the top the
unit
− remove 4 allen screws to remove the aluminum gas adapter fitting
− remove two plastic taps on top of the cabinet to access the screws securing
the blower
− remove 4 screws securing the blower from the top using a long screwdriver
− remove the entire blower gas valve assembly from the unit
− remove the gas valve 3 torx screws
− install the new gas valve on the blower 3 torx screws
− reverse process to assemble the blower back to the heater
− ensure the gasket is installed between the blower and the top housing
− Install the blower gas valve using 4 screws and a long screw driver
− Install the aluminum gas adapter on top of the gas valve (ensure the o-ring
is in place)
− Install the gas fitting and secure it using 4 screws to the cabinet
− Install the building gas supply
− Install the blower wiring, HV cable and gas valve wiring
− turn gas supply back on and check for any gas leaks
− turn water on and plug the heater to the outlet
Blower/Gas Valve Exploded View
ELECTRODE REPLACEMENT
The electrode is located on the top of the heat exchanger
− Shut off the gas to the heater
− Shut off power to the heater by unplugging the unit from the 120 VAC outlet
− remove the front panel (three screws at top and three at bottom)
− Unplug the display cable from the pcb (press plastic tab and pull)
− lift up and remove the front display bracket
− Unplug the HV cable from the electrode
− Unplug the electrode connection from the controller at connection E12
− Remove the 2 screws & washers securing the electrode
− Remove electrode from HEX assembly.
− Insert new electrode into the HEX assembly, careful to use new probe hole
seal
− Fasten the electrode with the 2 screws with washers. Verify that the
yellow/green wire is attached beneath the right hand screw.
− Connect the electrode to the controller at connection E12
− Connect the HV cable to the electrode
− turn gas supply back on
− turn water on and plug the heater to the outlet
Controller Pin Layout
Wiring Diagram (all wall-hung units)
Wiring Diagram (all floor-standing units)
Gas Valve
Resettable overheat switch
www.intellihot.com
2900 W. Main Street, Galesburg IL 61401 |
309.473.8040 main
309.296.8984 fa
Documents / Resources
|
Intellihot iQ751 Water
Heater
[pdf] Owner's Manual
iQ751 Water Heater, iQ751, Water Heater, Heater
---|---
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>