SIEMENS VNT-PS Power Supply Instruction Manual
- June 9, 2024
- SIEMENS
Table of Contents
SIEMENS VNT-PS Power Supply
Installation Instructions Model VNT-PS Power Supply for VNT
INTRODUCTION
The Model VNT-PS is used to isolate the ground of the VNT (Virtual Network
Tunnel) from the FireFinder-XLS system ground.
INSTALLATION
Remove all system power before installation, first battery then AC. (To
power up, connect the AC first, then the battery.)
Mounting
The VNT-PS mounts with an attached bracket onto the VNT-MP using the hex
nuts supplied with the VNT-MP.
The VNT-PS installs on the left edge of the VNT-MP mounting plate. Loosen the two nuts on the left side of the VNT that are fastened to the VNT-MP, then slide the slots of the VNT-PS bracket onto the studs. Tighten the nuts to securely fasten the VNT-PS bracket in place. Refer to Figure 2.
Figure 2
Mounting the VNT-PS to the VNT-MP
Siemens Industry, Inc.
Building Technologies Division
Figure 3
Typical VNT-PS Wiring to VNT
ELECTRICAL RATINGS
- Special Application: The VNT-PS may only be used to connect PSC-12 (P/N 500-033340) and VNT (P/N 500-650490).
- Output Voltage: 24VDC
- Output Current: 1.7A max
- Input Voltage: Regulated 24VDC 50mA
- No Load Current: 2.0A @ 24VDC max.
- Input Current: 2.0A @ 24VDC max.
Siemens Industry, Inc. Building Technologies Division Florham Park, NJ Siemens
Building Technologies, Ltd. Fire Safety & Security Products
2 Kenville Boulevard
Brampton, Ontario L6T 5E4 Canada
Documents / Resources
|
SIEMENS VNT-PS Power
Supply
[pdf] Instruction Manual
VNT-PS Power Supply, VNT-PS, Power Supply, Supply
---|---
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>