MARK LIGHTING S1LI Slot 1 Indirect Pendant Instruction Manual
- June 9, 2024
- MARK LIGHTING
Table of Contents
S1LI Slot 1 Indirect Pendant
SLOT 1
Installation Instructions – Pendant S1LI/S1LD/S1LID
Safety p.1
Overview
Parts
p.6
p.10
Set Up Ceiling p.11
Prep Fixtures Install Head Unit Install Fixture
p.13
p.14
p.20
Important Safety Instructions
Electrical Connections p.27
Supplemental p.31
Contractor Resources p.32
Pre-Launch READ AND FOLLOW ALL SAFETY INSTRUCTIONS!
SAVE THESE INSTRUCTIONS AND DELIVER TO OWNER AFTER INSTALLATION
· To reduce the risk of death, personal injury or property damage from fire,
electric shock, falling parts, cuts/abrasions, and other hazards please read
all warnings and instructions included with and on the fixture box and all
fixture labels.
· Before installing, servicing, or performing routine maintenance upon this
equipment, follow these general precautions. · Installation and service of
luminaires should be performed by a qualified licensed electrician. ·
Maintenance of the luminaires should be performed by person(s) familiar with
the luminaires construction and operation and any hazards
involved. Regular fixture maintenance programs are recommended. · It will
occasionally be necessary to clean the outside of the refractor/lens.
Frequency of cleaning will depend on ambient dirt level and minimum
light output which is acceptable to user. Refractor/lens should be washed in a
solution of warm water and any mild, non-abrasive household detergent, rinsed
with clean water and wiped dry. Should optical assembly become dirty on the
inside, wipe refractor/lens and clean in above manner, replacing damaged
gaskets as necessary. · DO NOT INSTALL DAMAGED PRODUCT! This luminaire has
been properly packed so that no parts should have been damaged during transit.
Inspect to confirm. Any part damaged or broken during or after assembly should
be replaced. · Recycle: For information on how to recycle LED electronic
products, please visit www.epa.gov. · These instructions do not purport to
cover all details or variations in equipment nor to provide every possible
contingency to meet in connection with installation, operation, or
maintenance. Should further information be desired or should particular
problems arise which are not covered sufficiently for the purchaser’s or
owner’s purposes, this matter should be referred to Acuity Brands Lighting,
Inc.
WARNING RISK OF ELECTRIC SHOCK
Disconnect or turn off power before installation or servicing. Verify that
supply voltage is correct by comparing it with the
luminaire label information. Make all electrical and grounded connections in
accordance
with the National Electrical Code (NEC) and any applicable local code
requirements.
WARNING RISK OF BURN
Allow lamp/fixture to cool before handling. Do not touch enclosure or light
source.
Do not exceed maximum wattage marked on luminaire label. Follow all
manufacturer’s warnings, recommendations and
restrictions for: driver type, burning position, mounting locations/methods,
replacement and recycling.
All wiring connections should be capped with UL approved
recognized wire connectors.
marklighting.com I 800-705-SERV (7378) I TechSupport-Mark@AcuityBrands.com I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
912-00307-002 10/25, Rev A
1
SLOT 1
Safety p.1
Overview p.6
Installation Instructions – Pendant S1LI/S1LD/S1LID
Parts
Set Up Ceiling
Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental Contractor Resources
p.10
p.11
p.13
p.14
p.20
p.27
p.31
p.32
Important Safety Instructions
Pre-Launch CAUTION
RISK OF INJURY
Wear gloves and safety glasses at all times when removing luminaire from
carton, installing, servicing or performing maintenance.
Avoid direct eye exposure to the light source while it is on.
CAUTION RISK OF FIRE
Keep combustible and other materials that can burn, away from lamp/lens.
Do not operate in close proximity to persons, combustible materials or
substances affected by heat or drying.
CAUTION: RISK OF PRODUCT DAMAGE
Never connect components under load. Do not mount or support these fixtures in
a manner that can cut the outer jacket or damage wire insulation. Controls for
dimming, auto-sensing, or remote control of a luminaire that are not factory-
wired to the luminaire must be checked for
compatibility with the luminaire prior to installation. LED fixtures must be
powered directly to a switched circuit. Unless individual product
specifications deem otherwise: Do not restrict fixture ventilation. Allow for
some volume of airspace around fixture.
Avoid covering LED fixtures with insulation, foam, or other material that will
prevent convection or conduction cooling. Unless individual product
specifications deem otherwise: Do not exceed fixtures maximum ambient
temperature. Only use fixture in its intended location. LED products are
Polarity Sensitive. Ensure proper Polarity before installation. Electrostatic
Discharge (ESD): ESD can damage LED fixtures. Personal grounding equipment
must be worn during all installation or servicing
of the unit. Do not touch individual electrical components as this can cause
ESD, shorten lamp life, or alter performance. Some components inside the
fixture may not be serviceable. In the unlikely event your unit may require
service, stop using the unit immediately
and contact an ABL representative for assistance. Always read the fixtures
complete installation instructions prior to installation for any additional
fixture specific warnings. Always ensure that the electrical distribution
system is up to NEC (and any applicable local code) requirements. Verify that
power distribution system has proper grounding. Lack of proper earth ground
can lead to fixture failure and may void warranty.
Choose either Part 15 OR Part 18 and move to Page 3 Installation Instructions
under Delivery. Lithonia Outdoor will always use Part 15.
All luminaires that contain electronic devices that generate frequencies above 9kHz from any component within the luminaire comply with Part 15 of the FCC Rules. Operation is subject
to the following two conditions:
(1)
This device may not cause harmful interference.
(2)
This device must accept any interference received, including interference that may cause undesired operation.
marklighting.com I 800-705-SERV (7378) I TechSupport-Mark@AcuityBrands.com I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
912-00307-002 10/25, Rev A
2
SLOT 1
Safety p.1
Overview p.6
Installation Instructions – Pendant S1LI/S1LD/S1LID
Parts
Set Up Ceiling
Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental Contractor Resources
p.10
p.11
p.13
p.14
p.20
p.27
p.31
p.32
Important Safety Instructions
Pre-Launch This device complies with Part 18 of the FCC Rules but may cause
interference with cordless and cell phones, radios, televisions, and other
electronic
devices. To correct the problem, move the device away from the luminaire or
plug into a different outlet. This product may cause interference to radio
equipment and should not be installed near maritime safety communications
equipment or other critical navigation or communications equipment operating
between 0.45-30MHz.
Failure to follow any of these instructions could void product warranties. For
a complete listing of product Terms and Conditions, please visit
www.acuitybrands.com.
Acuity Brands Lighting, Inc. assumes no responsibility for claims arising out
of improper or careless installation or handling of its products.
ABL LED General Warnings, Form No. 503.203
© 2021, 2010, 2016 Acuity Brands Lighting, Inc. All rights reserved. 12/01/10
READ AND FOLLOW ALL SAFETY INSTRUCTIONS! SAVE THESE INSTRUCTIONS AND DELIVER
TO OWNER AFTER INSTALLATION
· To reduce the risk of death, personal injury or property damage from fire,
electric shock, falling parts, cuts/abrasions, and other hazards please read
all warnings and instructions included with and on the fixture box and all
fixture labels.
· Before installing, servicing, or performing routine maintenance upon this
equipment, follow these general precautions. · Installation and service should
be performed by a qualified licensed electrician. · Maintenance should be
performed by qualified person(s) familiar with the products’ construction and
operation and any hazards
involved. Regular maintenance programs are recommended. · DO NOT INSTALL
DAMAGED PRODUCT! This product has been properly packed so that no parts should
have been damaged during
transit. Inspect to confirm. Any part damaged or broken during or after
assembly should be replaced. · These instructions do not purport to cover all
details or variations in equipment nor to provide every possible contingency
to meet in
connection with installation, operation, or maintenance. Should further
information be desired or should particular problems arise which are not
covered sufficiently for the purchaser’s or owner’s purposes, this matter
should be referred to Acuity Brands Lighting, Inc.
marklighting.com I 800-705-SERV (7378) I TechSupport-Mark@AcuityBrands.com I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
912-00307-002 10/25, Rev A
3
SLOT 1
Safety p.1
Overview p.6
Installation Instructions – Pendant S1LI/S1LD/S1LID
Parts
Set Up Ceiling
Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental Contractor Resources
p.10
p.11
p.13
p.14
p.20
p.27
p.31
p.32
Important Safety Instructions
Pre-Launch WARNING
RISK OF ELECTRIC SHOCK
Disconnect or turn off power before installation or servicing. Verify that
supply voltage is correct by comparing it with the
luminaire label information. Make all electrical and grounded connections in
accordance
with the National Electrical Code (NEC) and any applicable local code
requirements. All wiring connections should be capped with UL approved
recognized wire connectors.
CAUTION RISK OF INJURY
Wear gloves and safety glasses at all times when removing luminaire from
carton, installing, servicing or performing maintenance.
Avoid direct eye exposure to the light source while it is on.
WARNING RISK OF BURN
Allow lamp/fixture to cool before handling. Do not touch enclosure or light
source.
Do not exceed maximum wattage marked on luminaire label. Follow all
manufacturer’s warnings, recommendations
and restrictions for: driver type, burning position, mounting
locations/methods, replacement and recycling.
CAUTION RISK OF FIRE
Keep combustible and other materials that can burn, away from lamp/lens.
Do not operate in close proximity to persons, combustible materials or
substances affected by heat or drying.
Always read the fixtures complete installation instructions prior to
installation for any additional fixture specific warnings. Failure to follow
any of these instructions could void product warranties. For a complete
listing of product Terms and Conditions, please
visit www.acuitybrands.com.
Acuity Brands Lighting, Inc. assumes no responsibility for claims arising out
of improper or careless installation or handling of its products.
ABL LED General Warnings, Form No. 503.203
© 2021, 2010, 2016 Acuity Brands Lighting, Inc. All rights reserved. 12/01/10
marklighting.com I 800-705-SERV (7378) I TechSupport-Mark@AcuityBrands.com I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
912-00307-002 10/25, Rev A
4
SLOT 1
Safety p.1
Overview p.6
Installation Instructions – Pendant S1LI/S1LD/S1LID
Parts
Set Up Ceiling
Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental Contractor Resources
p.10
p.11
p.13
p.14
p.20
p.27
p.31
p.32
Important Safety Instructions
Pre-Launch CAUTION: RISKOFPRODUCTDAMAGE
Electrostatic Discharge (ESD): ESD can damage product(s). Personal grounding
equipment must be worn during all installation or servicing of the unit.
Do not touch individual electrical components as this can cause ESD and affect
product Performance. Do not stretch or use cable sets that are to short or are
of insufficient length. Do not tamper with contacts. Do not modify the
product. Do not change or alter internal wiring or installation circuitry. Do
not use product for anything other than its intended use. If installing
latching springs: ensure that the springs are fully engaged prior to moving to
next connection. If installing wiring systems: Materials and component parts
of a manufacturing wiring system as described in Article 604 of the National
Electric
Code and Underwriters Laboratories Standard for Safety #183 MUST BE installed.
Please see product specific installation instructions for additional warnings
or any applicable FCC or other regulatory statements.
Failure to follow any of these instructions could void product warranties. For
a complete listing of product Terms and Conditions, please visit
www.acuitybrands.com.
Our Brands
Indoor/Outdoor Lithonia Lighting Carandini Holophane RELOC Light Concepts
Indoor Lighting Gotham Mark Architectural Lighting Peerless Renaissance Lighting Winona Lighting
Outdoor Lighting American Electric Lighting Antique Street Lamps Hydrel Tersen
Controls DARK TO LIGHT LC&D ROAM Sensor Switch Synergy
Daylighting SunOptics
Acuity Brands Lighting, Inc. assumes no responsibility for claims arising out of improper or careless installation or handling of its products.
ABL LED General Warnings, Form No. 503.203
© 2021, 2010, 2016 Acuity Brands Lighting, Inc. All rights reserved. 12/01/10
marklighting.com I 800-705-SERV (7378) I TechSupport-Mark@AcuityBrands.com I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
912-00307-002 10/25, Rev A
5
SLOT 1
Safety p.1
Overview p.6
A. Overview – Fixture
Installation Instructions – Pendant S1LI/S1LD/S1LID
Parts
Set Up Ceiling
Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental Contractor Resources
p.10
p.11
p.13
p.14
p.20
p.27
p.31
p.32
Pre-Launch NOTE: Illustrations are used for reference only and can differ
slightly from the actual lighting system installed. However, key components
addressed in this information are represented as accurately as possible.
DO NOT CONNECT FIXTURE TO LINE VOLTAGE POWER; IT IS A LOW VOLTAGE UNIT.
Grip-Lock Hanging Bracket
Aircraft Cable
RIGHT SECTION (S1L..R)
Feed Cord
End Cap
LEFT SECTION (S1L..L)
INTERMEDIATE SECTION (S1L..I)
Direct
S1LD
Indirect
S1LI
Bi-Direct
S1LID
Modulus Remote Head Unit
marklighting.com I 800-705-SERV (7378) I TechSupport-Mark@AcuityBrands.com I ©
2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to
change design, materials and finish in any way that will not alter installed
appearance or reduce function and performance.
912-00307-002 10/25, Rev A
6
SLOT 1
Safety p.1
Overview p.6
A. Overview – Mounting
Installation Instructions – Pendant S1LI/S1LD/S1LID
Parts
Set Up Ceiling
Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental
p.10
p.11
p.13
p.14
p.20
p.27
p.31
Contractor Resources p.32
Pre-Launch For an Individual Luminaire
“C”
“B”
“A”
ORDERED LENGTH
2FT 3FT 4FT 5FT 6FT 7FT 8FT
INDIVIDUAL FIXTURE
“A” O.A.L
“B” O.C
“C” FROM END
2′ – 13/32″
1′ – 11 13/32″
1/2″
3′ – 13/32″
2′ – 11 13/32″
1/2″
4′ – 13/32″
3′ – 11 13/32″
1/2″
5′ – 13/32″
4′ – 11 13/32″
1/2″
6′ – 13/32″
5′ – 11 13/32″
1/2″
7′ – 13/32″
6′ – 11 13/32″
1/2″
8′ – 13/32″
7′ – 11 13/32″
1/2″
APPROX WEIGHT
3LB 5LB 7LB 8LB 10LB 11LB 13LB
“C”
marklighting.com I 800-705-SERV (7378) I TechSupport-Mark@AcuityBrands.com I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
912-00307-002 10/25, Rev A
7
SLOT 1
Safety p.1
Overview p.6
A. Overview – Mounting
Installation Instructions – Pendant S1LI/S1LD/S1LID
Parts
Set Up Ceiling
Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental
p.10
p.11
p.13
p.14
p.20
p.27
p.31
Contractor Resources p.32
Pre-Launch RunConfigurations
“C”
“B-1”
“A-1”
“B-2” “A-2”
“B-1” “A-1”
ORDERED LENGTH 4FT 5FT 6FT 7FT 8FT
“A-1″ O.A.L. 4′ – 3/16″ 5′ – 3/16″ 6′ – 3/16″ 7′ – 3/16″ 8′ – 3/16”
“A-2″ O.A.L. 4′ – 0″ 5′ – 0″ 6′ – 0″ 7′ – 0″ 8′ – 0”
RUN LAYOUT “B-1″ O.C. 3′ – 11 23/32″ 4′ – 11 23/32″ 5′ – 11 23/32″ 6′ – 11 23/32″ 7′ – 11 23/32”
“B-2″ O.C. 4′ – 0″ 5′ – 0″ 6′ – 0″ 7′ – 0″ 8′ – 0”
“C” FROM END 1/2″ 1/2″ 1/2″ 1/2″ 1/2″
APPROX. WEIGHT 7LB 8LB 10LB 11LB 13LB
“C”
marklighting.com I 800-705-SERV (7378) I TechSupport-Mark@AcuityBrands.com I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
912-00307-002 10/25, Rev A
8
SLOT 1
Installation Instructions – Pendant S1LI/S1LD/S1LID
Safety p.1
Overview
Parts
p.6
p.10
A. Overview Run Layout
Set Up Ceiling p.11
Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental
p.13
p.14
p.20
p.27
p.31
Contractor Resources p.32
Slot Head Unit Requirements
Pre-Launch Individual LED Watts
LMF 0
Indirect 0 </= 400 </= 600 </= 800 </= 1000 </= 1200
32ft 32ft
32ft
32ft
32ft
32ft
</= 200 32ft 32ft
32ft
32ft
32ft
28ft
Direct
</= 400 32ft 32ft
32ft
32ft
28ft
24ft
</= 600 32ft 32ft
32ft
28ft
24ft
24ft
</= 800 32ft 32ft
28ft
24ft
24ft
20ft
</= 1000 30ft 28ft
24ft
24ft
20ft
18ft
The above table shows the maximum run length for combination of Direct/Indirect lumen packages for one head unit. As an Example: For a 48ft Bidirect luminaire run with 400LMF Indirect and 800LMF Direct lumen package, if the customer orders six 8ft luminaires then the run should look like below:
Max Run Per Head Unit Based On Lumen
Do Not Connect Luminaires Powered
Package (Refer To Table Above)
From Separate Head Unit (DK320M)
ELEVATION VIEW TYPICAL LUMINAIRE LAYOUT (*HANGING POINTS CAN VARY BASED ON
CONFIGURATIONS)
marklighting.com I 800-705-SERV (7378) I TechSupport-Mark@AcuityBrands.com I ©
2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to
change design, materials and finish in any way that will not alter installed
appearance or reduce function and performance.
912-00307-002 10/25, Rev A
9
SLOT 1
Installation Instructions – Pendant S1LI/S1LD/S1LID
Safety p.1
Overview
Parts
p.6
p.10
Set Up Ceiling p.11
Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental
p.13
p.14
p.20
p.27
p.31
Contractor Resources p.32
B. Parts
Pre-Launch · Providedin a separateredbox labeled”INSTALLATION
HARDWARE PLEASE OPEN FIRST”.
1
· All other parts for installation to be provided by others.
NOTE: Feed kit is the same for F1/F2 and parts are provided for both types of ceiling install. See parts list on this page for provided mounting hardware kit.
2 3
2 3
4 5
11
12
7
8
6
13
9 9
4 12
10
5
6 7
Grid Mount J-box
8
*274WJ0
(provided with F1A option only)
9
Cross Bar
*274W1N
10
Grid Clip
*274W1R
11
5″ Round Feed/CAT5 Canopy
White: 274WH1 (274WJ7) Black: 274WHG (274WL5) Silver: 274WMV (274WPA)
5″ Round Dual Feed Canopy 12
White: 274WLJ (274WN0) Black: 274WMP (274WNY) Silver: 274WPV (274WR5)
5″ Round Support Canopy
White:274WK8 (274WML)
Black: 274WMX (274WMX)
Silver: 274WPJ (274WR1)
2″ Round Support Canopy
White: 274W2S (274WHC) Black: 274WHL (274WHL)
13
Strain Relief
White: 274W1U Black: 274W2L
Mini Cable Gripper
274W1J
Coupler (2″ Canopy)
274W24
Coupler (5″ Canopy)
274W2K
Aircraft Cable
36″: 274W2W 72″: 274W2G 150″:274WH0
Feed Cord (White)
12FT: 270WLL (female connector) 12FT: 275SN2 (male connector)
Feed Cord (Black)
12FT: *2751M5 (female connector)
Silver: 274WLU (274WNV)
12FT: *2716E6 (male
NOTE: For square canopies, use part #s in the parenthesis.
connector)
marklighting.com I 800-705-SERV (7378) I TechSupport-Mark@AcuityBrands.com I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
912-00307-002 10/25, Rev A
10
SLOT 1
Installation Instructions – Pendant S1LI/S1LD/S1LID
Safety p.1
Overview
Parts
p.6
p.10
C. Set Up Ceilings Grid Ceilings
Set Up Ceiling p.11
Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental
p.13
p.14
p.20
p.27
p.31
Contractor Resources p.32
Pre-Launch 1
Conduit (by others)
T-Bar Cross-Bar
8 Screws
Canopy Feed Cord Strain Relief
J-box (by others)
2
Bolt
J-box
Cord
Canopy
To Fixture
Bracket (B)
Cable Retainer
Canopy Coupler
Bracket (A) T-Bar
3
Caddy Bar (by others)
Bracket (B)
Bracket (A) Tab
Bracket (A)
Hanger Bracket (A)
Hanger Bracket (A) Tab
Caddy Bar Brackets (by others)
Hanger Bracket (B)
Feed Locations: a. Install J-box (by others) into the ceiling. Ensure the
bottom edge is flush with the ceiling. Connect the metal conduit from building
power to the J-box.
b. Mount the crossbar to the J-box using (2) #8 screws and fasten it securely
to the J-box.
c. Insert strain relief to the feed cord.
d. Pass the feed cord through the hole in the canopy and make wire connections
inside J-box. Flush the canopy with the crossbar and thread coupler onto
Non-Feed Locations (On-Grid): a. Insert bolt into the bottom of bracket (A)
and hook onto grid member.
b. Hook bracket (B) onto bracket (A) and adjust brackets to proper location
along the ceiling grid and push the tab from (A) towards bracket (B) to secure
brackets together.
c. Secure the brackets to the building structure per local building codes.
Non-Feed Locations (Off-Grid): a. Insert bolt into the bottom of bracket (A)
and hook together with bracket (B). Secure with nut (DO NOT TIGHTEN).
b. Slide hanger onto caddy bar and fit caddy bar into upper slots on the grid
members.
c. Adjust brackets to proper location and push the tab from bracket (A)
towards bracket (B) to secure brackets together.
d. Secure the brackets to the building structure per
crossbar screw.
local building codes.
DO NOT CONNECT FIXTURE TO LINE VOLTAGE POWER; IT IS A LOW VOLTAGE UNIT.
All 4 WIRES FROM THE HARNESS MUST BE CONNECTED; ALL FIXTURES REQUIRE POWER AND CONTROL SIGNAL WIRES.
marklighting.com I 800-705-SERV (7378) I TechSupport-Mark@AcuityBrands.com I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
912-00307-002 10/25, Rev A
11
SLOT 1
Safety p.1
Overview
Parts
p.6
p.10
C. Set Up Ceilings – Hard – Lid
Installation Instructions – Pendant S1LI/S1LD/S1LID
Set Up Ceiling p.11
Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental
p.13
p.14
p.20
p.27
p.31
Contractor Resources p.32
Pre-Launch 1
J-box (by others)
Cross-Bar
8 Screws
Ceiling
1/4-20 Screw
J-box Canopy
Cord To Fixture
2 Ceiling
1/4-20 Threaded Rod (by others)
Canopy
3/8″ to 5/8″ Below the Ceiling
Feed Cord
Canopy Coupler
Strain Relief Feed Locations:
a. Install the 4O J-box (by others) into the ceiling. Ensure the bottom edge
is flush with ceiling. Connect the metal conduit from building power to the
J-box.
b. Mount crossbar to J-box using (2) #8 screws and fasten it securely to
J-box.
c. Install strain relief to the feed cord.
d. Pass feed cord through the bushing in the canopy and make wire connections
Coupler
Coupler
Ceiling Canopy
Non-Feed Locations: a. Secure 1/4-20 threaded rod approximately 3/8″ to 5/8″ below the ceiling. b. Insert canopy and securely fasten the coupler.
inside J-box. Flush the canopy with the crossbar and thread coupler onto
the crossbar screw.
DO NOT CONNECT FIXTURE TO LINE VOLTAGE POWER; IT IS A LOW VOLTAGE UNIT. ALL 4 WIRES FROM THE HARNESS MUST BE CONNECTED.
marklighting.com I 800-705-SERV (7378) I TechSupport-Mark@AcuityBrands.com I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
912-00307-002 10/25, Rev A
12
SLOT 1
Safety p.1
Overview p.6
D. Prep Fixtures
Installation Instructions – Pendant S1LI/S1LD/S1LID
Parts
Set Up Ceiling
Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental Contractor Resources
p.10
p.11
p.13
p.14
p.20
p.27
p.31
p.32
Pre-Launch LocateMaterial 1
All components required to install the fixture run/pattern are on one pallet.
· Fixture Sections · Joining Hardware · Record Drawings
Fixture Identification
2
FIXTURES MUST BE INSTALLED IN ORDER AS SHOWN ON RECORD DRAWINGS.
Mark as Field
Unique Run/Pattern # Section #
F-08-32FT
ID: 2.001
A427-40250-0-LLA-1.001
Order #
NOTE: Each luminaire section must be paired with its corresponding head unit. Look for matching fixture types on the luminaire and head unit packaging boxes.
LEFT 2.000
INTERMEDIATE 2.001
INTERMEDIATE 2.001
RIGHT 2.002
· Labels are located on the carton, on the fixture, and on the lens. · Each
section is identified by an ID#. · Section position starting with X.000 for
the first fixture. · Same fixture configuration can carry identical ID# and
are
interchangeable.
· Individual fixtures have whole numbers. · For replacement parts, provide ID#
and order #.
marklighting.com I 800-705-SERV (7378) I TechSupport-Mark@AcuityBrands.com I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
912-00307-002 10/25, Rev A
13
SLOT 1
Safety p.1
Overview p.6
E. Install Head Unit
Installation Instructions – Pendant S1LI/S1LD/S1LID
Parts
Set Up Ceiling
Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental Contractor Resources
p.10
p.11
p.13
p.14
p.20
p.27
p.31
p.32
Pre-Launch F1 Grid Head Unit
1′-10
”
F2 Hard – Lid Head Unit
OVERALL DIMENSIONS 2′-2 ¼” x 2′-¾” x 4 ¾”
Overview of Head Unit for Grid Ceiling
Head Unit
OVERALL DIMENSIONS 1′-8 ¼” x 1′-3/8″ x 2 5/8″
Overview of Head Unit for Hard – Lid Ceiling
Head Unit
Grid Frame Assembly
NOTE: 50ft max distance between head unit and J-box for the fixture.
marklighting.com I 800-705-SERV (7378) I TechSupport-Mark@AcuityBrands.com I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
912-00307-002 10/25, Rev A
14
SLOT 1
Installation Instructions – Pendant S1LI/S1LD/S1LID
Safety p.1
Overview
Parts
p.6
p.10
E. Install Head Unit – Grid Ceilings
Set Up Ceiling p.11
Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental
p.13
p.14
p.20
p.27
p.31
Contractor Resources p.32
Pre-Launch 1
2
3
Channel
Bar
Closed
Open
Bend Tab
a. Align the two holes of the frame assembly (provided in the kit) with the
holes provided in the sides of head unit and fasten them using 2X (PHW067204)
screws.
b. Assemble the second set of frame assembly using 2X (PHW067204) screws on
other side of the head unit.
a. Release the clamping latch arms (CC01434) on either side of the head unit and adjust channel bars to the correct spacing between T-bars as shown.
a. Once the channel bars are adjusted, bend the ends of all four channel bars based on the distance between T-bars.
marklighting.com I 800-705-SERV (7378) I TechSupport-Mark@AcuityBrands.com I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
912-00307-002 10/25, Rev A
15
SLOT 1
Installation Instructions – Pendant S1LI/S1LD/S1LID
Safety p.1
Overview
Parts
p.6
p.10
E. Install Head Unit – Grid Ceilings
Set Up Ceiling p.11
Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental
p.13
p.14
p.20
p.27
p.31
Contractor Resources p.32
Pre-Launch 4
5
Channel Bar
T-Bar
Bend Tab
Input
Wire Tie
Output
a. Fix the channel bars (on either sides of head unit) with T-bars by means of
wire ties or screws (provided in the kit) onto T-bars as shown.
b. Secure the head unit in position by closing the clamping latch arm.
a. Remove either one of the knock-outs from both access plates and connect the input and output metal conduits as shown.
NOTE: CONTRACTOR TO RUN MIN.12GA WIRE FROM HEAD UNIT TO SUPPLY CLASS 1 DC POWER TO LUMINAIRE THROUGH CODE COMPLIANT METAL CONDUIT, MAX. 50FT.
marklighting.com I 800-705-SERV (7378) I TechSupport-Mark@AcuityBrands.com I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
912-00307-002 10/25, Rev A
16
SLOT 1
Safety p.1
Overview
Parts
p.6
p.10
E. Install Head Unit – Hard – Lid
Installation Instructions – Pendant S1LI/S1LD/S1LID
Set Up Ceiling p.11
Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental
p.13
p.14
p.20
p.27
p.31
Contractor Resources p.32
Pre-Launch For Surface Mount, Side Entry
1
2
3
Output Input
a. Loosen the screw from the lid on the head unit and swing it to open.
a. Flush the head unit onto the ceiling and secure it to ceiling using 4X
screws.
b. Complete the wire harnesses inside the head unit.
a. Use knock-outs of the side access plates to connect input and output metal
conduits.
b. Close the lid and fasten it using a screw.
marklighting.com I 800-705-SERV (7378) I TechSupport-Mark@AcuityBrands.com I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
912-00307-002 10/25, Rev A
17
SLOT 1
Safety p.1
Overview
Parts
p.6
p.10
E. Install Head Unit – Hard – Lid
Installation Instructions – Pendant S1LI/S1LD/S1LID
Set Up Ceiling p.11
Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental
p.13
p.14
p.20
p.27
p.31
Contractor Resources p.32
Pre-Launch For Surface Mount, Rear Entry
1
2
3
Input
Output
a. Loosen the screw from the lid on the head unit and swing it to open.
a. Flush the head unit onto the ceiling and secure it to ceiling using 4X
screws.
b. Complete the wire harnesses inside the head unit.
a. Use knock-outs of the rear access plates to connect input and output metal
conduits.
b. Close the lid and fasten it using a screw.
marklighting.com I 800-705-SERV (7378) I TechSupport-Mark@AcuityBrands.com I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
912-00307-002 10/25, Rev A
18
SLOT 1
Safety p.1
Overview
Parts
p.6
p.10
E. Install Head Unit – Hard – Lid
Installation Instructions – Pendant S1LI/S1LD/S1LID
Set Up Ceiling p.11
Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental
p.13
p.14
p.20
p.27
p.31
Contractor Resources p.32
Pre-Launch For Wall Mount, Side Entry
1
2
3
a. Loosen the screw from the lid on the head unit
and swing it to open.
a. Flush the head unit onto the ceiling and secure it to ceiling using 4X
screws.
b. Complete the wire harnesses inside the head unit.
a. Use knock-outs of the side access plates to connect input and output metal
conduits.
b. Close the lid and fasten it using a screw.
marklighting.com I 800-705-SERV (7378) I TechSupport-Mark@AcuityBrands.com I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
912-00307-002 10/25, Rev A
19
SLOT 1
Installation Instructions – Pendant S1LI/S1LD/S1LID
Safety p.1
Overview
Parts
p.6
p.10
Set Up Ceiling p.11
F. Install Fixture – Grid Ceilings (F1)
Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental
p.13
p.14
p.20
p.27
p.31
Contractor Resources p.32
Pre-Launch 1
Conduit from Head Unit
2
J-box
L=4″ W=4″ D=2.2″
Canopy
T-Bar
3 Cable Retainer
a. At Power Feed Locations: Mount the 4″ x 4″ J-box (recommended as above)
above T-grid as shown.
b. Pass the feed cord through the canopy and flush it with T-bar. Make wire
connections and thread cable retainer onto the cross-bar screw.
c. Connect the metal conduit from head unit to the J-box.
a. At Non-Power Feed Locations: Assemble grid clips onto grid or caddy bar.
b. Place canopy flush with ceiling tile. Thread cable retainer onto bolt no
less than ¼” of the way up.
a. For an Individual (IND): Mount the grip-lock (from the kit) onto the screw
provided on the individual luminaire and insert the aircraft cable from
ceiling support to the end of IND luminaire.
b. Repeat the same procedure on other side of luminaire as well.
marklighting.com I 800-705-SERV (7378) I TechSupport-Mark@AcuityBrands.com I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
912-00307-002 10/25, Rev A
20
SLOT 1
Installation Instructions – Pendant S1LI/S1LD/S1LID
Safety p.1
Overview
Parts
p.6
p.10
Set Up Ceiling p.11
F. Install Fixture – Grid Ceilings (F1)
Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental
p.13
p.14
p.20
p.27
p.31
Contractor Resources p.32
Pre-Launch 4
5
6
Lens Removal Tool
a. To adjust aircraft cable up or down, push down on upper lock cylinder.
b. Once required length is achieved, allow lock cylinder to spring back up.
Make sure the lock screw is tightened.
c. Repeat the same on other end of the luminaire. Trim the excess cable
length.
a. For a Run: Insert and pivot the flange of lens removal tool (provided in
the kit) in the gap between end cap and lens.
b. Detach the lens from the luminaire completely on both sides. Assemble the
grip-lock and aircraft cable as mentioned in steps F3 to F4.
a. Assemble the aligner key and light blocker foil (provided in the kit) and
slide them (2X) into the DIRECT side of the housing as shown.
b. Place the aligner key dimples to face the outer extrusion. Repeat this step
only on LEFT and INT luminaires.
marklighting.com I 800-705-SERV (7378) I TechSupport-Mark@AcuityBrands.com I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
912-00307-002 10/25, Rev A
21
SLOT 1
Installation Instructions – Pendant S1LI/S1LD/S1LID
Safety p.1
Overview
Parts
p.6
p.10
Set Up Ceiling p.11
F. Install Fixture – Grid Ceilings (F1)
Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental
p.13
p.14
p.20
p.27
p.31
Contractor Resources p.32
Pre-Launch 7
8
9
Indirect Direct
View A
Hanger Bracket
View A
a. Insert aircraft cable into grip-lock hardware that is attached to hanger
bracket. Repeat this step on all INT and RIGHT luminaires.
b. Make electrical connections between the luminaires as shown before the
luminaires are completely installed.
c. Slide intermediate luminaire (INT) along hanger bracket keeping aligner
key-blocker foil to the channel from opposite luminaire body.
a. Once both the luminaires mate, secure shoulder screws (2X) (provided in the
kit) from bottom using allen key provided (from the kit) shown.
b. Ensure that both screws will fasten the joiner bracket from the INT
luminaire towards the joiner knuckle from previous luminaire as shown.
c. Repeat the same step for all INT and RIGHT luminaires.
a. Once all the electrical connections are made by a licensed electrical
contractor, reinstall the lens of the LEFT-INT-RIGHT luminaires.
b. The lens needs to match up with the unit it was originally in. Gently push
the lens into the housing until engaged completely from all sides.
c. Finally, insert feed cord into J-box through bushings and canopy. Complete
the harness of feed cord from the luminaire and connect it to its mating
connector from the head unit inside the Jbox.
marklighting.com I 800-705-SERV (7378) I TechSupport-Mark@AcuityBrands.com I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
912-00307-002 10/25, Rev A
22
SLOT 1
Installation Instructions – Pendant S1LI/S1LD/S1LID
Safety p.1
Overview
Parts
p.6
p.10
Set Up Ceiling p.11
F. Install Fixture – Hard Ceilings (F2)
Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental
p.13
p.14
p.20
p.27
p.31
Contractor Resources p.32
Pre-Launch 1
From Head Unit
2
a. At Power Feed Locations: Install the J-box (by others) into the ceiling.
b. Ensure that the bottom edge is flushed with the ceiling as shown. Connect
the metal conduit from head unit to the J-box.
a. Attach a cross-bar to the J-box using 2X #8 screws and fasten it securely onto the J-box.
3
Strain Relief
4′ section uses 2,4 or 6 quick connectors to
connect DC input cord to power cord on luminarie. Match the Conductor color.
a. Insert white 7/8″ bushing on luminaire power cord. Connect matched color
wire using wire connectors.
b. Install the insulated crimp strain relief to the feed cord.
c. Pass the luminaire power cord through the canopy. Complete the wiring
connections inside the J-box.
marklighting.com I 800-705-SERV (7378) I TechSupport-Mark@AcuityBrands.com I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
912-00307-002 10/25, Rev A
23
SLOT 1
Installation Instructions – Pendant S1LI/S1LD/S1LID
Safety p.1
Overview
Parts
p.6
p.10
Set Up Ceiling p.11
F. Install Fixture – Hard Ceilings (F2)
Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental
p.13
p.14
p.20
p.27
p.31
Contractor Resources p.32
Pre-Launch 4
5
6
¼”-20 Screw
a. Connect the coupler to the ¼”-20 screw provided on the cross-bar along with canopy.
a. For an Individual (IND): Mount the grip-lock (from the kit) onto the screw
provided on the individual luminaire and insert the aircraft cable from
ceiling support to the end of IND luminaire.
b. Repeat the same procedure on other side of luminaire as well.
a. To adjust aircraft cable up or down, push down on upper lock cylinder. Once
required length is achieved, allow lock cylinder to spring back up.
b. Make sure the lock screw is tightened. Repeat the same on other end of the
luminaire. Trim the excess cable length.
marklighting.com I 800-705-SERV (7378) I TechSupport-Mark@AcuityBrands.com I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
912-00307-002 10/25, Rev A
24
SLOT 1
Installation Instructions – Pendant S1LI/S1LD/S1LID
Safety p.1
Overview
Parts
p.6
p.10
Set Up Ceiling p.11
F. Install Fixture – Hard Ceilings (F2)
Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental
p.13
p.14
p.20
p.27
p.31
Contractor Resources p.32
Pre-Launch 7
8
Lens Removal Tool
9 View A
a. For a Run: Insert and pivot the flange of lens removal tool (provided in
the kit) in the gap between end cap and lens as shown (repeat this step for
all luminaires).
b. Detach the lens from the luminaire completely on both sides. Assemble the
grip-lock and aircraft cable as mentioned in steps F3 to F4.
a. Assemble the aligner key and light blocker foil (provided in the kit) and
slide them (2X) into the DIRECT side of the housing as shown.
b. Place the aligner key dimples to face the outer extrusion. Repeat this step
only on LEFT and INT luminaires.
a. Insert aircraft cable into grip-lock hardware that is attached into hanger
bracket. Repeat this step on all INT and RIGHT luminaires.
b. Make electrical connections between the luminaires as shown before the
luminaires are completely installed.
c. Slide the intermediate luminaire (INT) along hanger bracket keeping aligner
key-blocker foil to the channel from opposite luminaire body.
marklighting.com I 800-705-SERV (7378) I TechSupport-Mark@AcuityBrands.com I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
912-00307-002 10/25, Rev A
25
SLOT 1
Installation Instructions – Pendant S1LI/S1LD/S1LID
Safety p.1
Overview
Parts
p.6
p.10
Set Up Ceiling p.11
F. Install Fixture – Hard Ceilings (F2)
Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental
p.13
p.14
p.20
p.27
p.31
Contractor Resources p.32
Pre-Launch 10
11
12
¼-20 Stud
Cable Retainer
3/8″ – 5/8″ Canopy
a. Once both the luminaires mate, secure shoulder screws (2X) (provided in the
kit) from bottom using allen key provided (from the kit).
b. Ensure that both screws will fasten the joiner bracket from the INT
luminaire towards the joiner knuckle from previous luminaire as shown.
c. Repeat the same step for all INT and RIGHT luminaires.
a. Once all the electrical connections are made by a licensed electrical
contractor, reinstall the lens of the LEFT-INT-RIGHT luminaires.
b. The lens needs to match up with the unit it was originally in. Gently push
the lens into the housing until engaged completely from all sides.
c. Finally, insert feed cord into J-box through bushings and canopy. Complete
the harness of feed cord from the luminaire and connect it to its mating
connector from the head unit inside the Jbox.
a. At Non-Feed Locations: Secure ¼-20 stud approximately 3/8″ to 5/8″ below
the ceiling. Insert canopy and securely fasten the cable retainer.
b. Repeat the same procedure on other side of luminaire as well.
marklighting.com I 800-705-SERV (7378) I TechSupport-Mark@AcuityBrands.com I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
912-00307-002 10/25, Rev A
26
SLOT 1
Installation Instructions – Pendant S1LI/S1LD/S1LID
Safety p.1
Overview
Parts
p.6
p.10
Set Up Ceiling p.11
G. Electrical Connection – Head Unit to Fixture
Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental
p.13
p.14
p.20
p.27
p.31
Pre-Launch All power connections should be installed according to
local/national codes by a Certified Electrician. All 4 WIRES FROM THE HARNESS
MUST BE CONNECTED; ALL FIXTURES REQUIRE POWER AND CONTROL SIGNAL WIRES.
J-box
*Older versions of fixture cord have Black, White, Purple, and Gray conductors. Connect according to detail on right.
Electrical Connections:
a. Secure electrical connections to the fixture per wiring chart on this page,
and in accordance with local/national code. b. Secure wiring access plate back
to fixture when completed. NOTE: Provided flex cord is not plenum rated, cord
will need to be ran with flexible or rigid conduit at time of install.
Contractor Resources p.32
marklighting.com I 800-705-SERV (7378) I TechSupport-Mark@AcuityBrands.com I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
912-00307-002 10/25, Rev A
27
SLOT 1
Installation Instructions – Pendant S1LI/S1LD/S1LID
Safety p.1
Overview
Parts
p.6
p.10
Set Up Ceiling p.11
G. Electrical Connection – Head Unit to Fixture
Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental
p.13
p.14
p.20
p.27
p.31
Contractor Resources p.32
Pre-Launch All power connections should be installed according to
local/national codes by a Certified Electrician. Wiring Compartment Detail
A Must connect to luminaires for all input control types! Modulus control
lines are polarityinsensitive. Use 12AWG solid wire in grounded conduit for
remote placement of head unit up to 50ft away from fixture canopy. B Line
voltage should match ordered voltage option (120/277/MVOLT or 347V). See next
pages for emergency power input wiring diagrams. Separate the luminaire
disconnect before servicing. Luminaire disconnects may not be present on units
build before Fall 2021. C Purple/gray will control direct lights, first zone
or intensity (for tunable white), blue/blue-white will control indirect light,
second zone, or CCT (for tunable white). Cap blue/blue-white if second channel
is unused. D DALI lines are polarity insensitive. Customer to supply DALI
power supply external to head unit. E Connect Cat5 to integral nIO on outside
wall of head unit. F Screw external antenna onto coax connector on outside
wall of head unit after installation. G Eco System lines are polarity-
insensitive. H For Chicago Plenum (CP) applications, a cat5 splitter is
located inside the Modulus outputs connection area. Installer should pull the
splitter through the access plate opening, make cat5
connections, then push the connector back into the wiring compartment before replacing
access plates. All connections should be made through the gasketed side access plates for CP
NOTE: Provided Flex cord is not plenum rated, cord will need to be head units – do not remove the top cover, which is factory sealed with aluminum tape. Replace
ran with Flexible or Rigid conduit at time of install.
tape if removed.
marklighting.com I 800-705-SERV (7378) I TechSupport-Mark@AcuityBrands.com I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
912-00307-002 10/25, Rev A
28
SLOT 1
Installation Instructions – Pendant S1LI/S1LD/S1LID
Safety p.1
Overview
Parts
p.6
p.10
Set Up Ceiling p.11
Prep Fixtures p.13
G. Electrical Connection – Emergency Circuit (EC)
Install Head Unit Install Fixture Electrical Connections Supplemental
p.14
p.20
p.27
p.31
Contractor Resources p.32
Pre-Launch All power connections should be installed according to local/national codes by a Certified Electrician.
EC System Wiring Diagram
Wiring Compartment Detail
a. Luminaire disconnects will be added to all head unit power input wires beginning Fall 2021 head units produced prior to then may not have disconnects.
marklighting.com I 800-705-SERV (7378) I TechSupport-Mark@AcuityBrands.com I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
912-00307-002 10/25, Rev A
29
SLOT 1
Installation Instructions – Pendant S1LI/S1LD/S1LID
Safety p.1
Overview
Parts
p.6
p.10
Set Up Ceiling p.11
G. Electrical Connection – Microinverter (E35INV)
Prep Fixtures p.13
Install Head Unit Install Fixture Electrical Connections Supplemental
p.14
p.20
p.27
p.31
Contractor Resources p.32
Pre-Launch All power connections should be installed according to local/national codes by a Certified Electrician.
E35INV System Wiring Diagram
Wiring Compartment Detail
a. Ships with E35INV head unit for field installation. Includes 3ft whip but
can be installed up to 250ft away with Class 1 wires run through additional
conduit (not included) in accordance with local code.
b. Ensure that Inverter Output Voltage Selector Switch always set to 277VAC
Out (the left-most switch position) before connecting normal power, regardless
of normal power voltage.
a. 120-277V, unswitched. Make normal power connections to 18AWG solid copper
flying leads in accordance with local code.
b. Luminaire disconnects will be added to all head unit power input wires
beginning Fall 2021 head units produced prior to then may not have
disconnects.
c. Mount test switch remotely (optional) or cap
red/black and white/red wires if not in use.
NOTE: Short unit connector lines after installation is complete. NOTE: Ensure that voltage selector switch on output side of IIS-35-HE is set to 277V REGARDLESS of input voltage.
marklighting.com I 800-705-SERV (7378) I TechSupport-Mark@AcuityBrands.com I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
912-00307-002 10/25, Rev A
30
SLOT 1
Safety p.1
Overview
Parts
p.6
p.10
H. Supplemental – NLTAIR2
Installation Instructions – Pendant S1LI/S1LD/S1LID
Set Up Ceiling p.11
Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental
p.13
p.14
p.20
p.27
p.31
Contractor Resources p.32
Pre-Launch Typical Installation For Rio External Antenna Antenna (packaged
with fixture)
NLTAIR2 Antenna (*274X9N)
Antenna Large Locking Nut
Antenna Small Ring
Antenna Gasket
RIO External Antenna
Head Unit With RIO External Antenna Installed
a. Open the top cover of the head unit. b. Find antenna taped inside the
enclosure. c. Attach RIO external antenna to the brass SMA connector.
Antenna Locking Nut
Coax Base
Antenna
NOTE: If antenna is lost, replacement part # for it is *274X9N.
marklighting.com I 800-705-SERV (7378) I TechSupport-Mark@AcuityBrands.com I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
912-00307-002 10/25, Rev A
31
SLOT 1
Safety p.1
Overview
Parts
p.6
p.10
I. Contractor’s Resources
Installation Instructions – Pendant S1LI/S1LD/S1LID
Set Up Ceiling p.11
Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental
p.13
p.14
p.20
p.27
p.31
Contractor Resources p.32
Pre-Launch Checkout helpful programs, tools, installation videosand more.
marklighting.com I 800-705-SERV (7378) I TechSupport-Mark@AcuityBrands.com I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.
912-00307-002 10/25, Rev A
32
References
- Mark Architectural Lighting | Acuity Brands
- Acuity Brands | Lighting, Controls, and Building Management Solutions
- U.S. Environmental Protection Agency | US EPA
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>