MARK LIGHTING SLOT 4 Recessed Linear Lighting Instruction Manual
- June 9, 2024
- MARK LIGHTING
Table of Contents
SLOT 2/4
Installation Instructions
Indirect/Direct Pendant S2PID/S4PID
Important Safety Instructions
READ AND FOLLOW ALL SAFETY INSTRUCTIONS!
SAVE THESE INSTRUCTIONS AND DELIVER TO OWNER AFTER INSTALLATION
- To reduce the risk of death, personal injury or property damage from fire, electric shock, falling parts, cuts/abrasions, and other hazards please read all warnings and instructions included with and on the fixture box and all fixture labels.
- Before installing, servicing, or performing routine maintenance upon this equipment, follow these general precautions.
- Installation and service of luminaires should be performed by a qualified licensed electrician.
- Maintenance of the luminaires should be performed by person(s) familiar with the luminaires’ construction and operation and any hazards involved. Regular fixture maintenance programs are recommended.
- It will occasionally be necessary to clean the outside of the refractor/lens. Frequency of cleaning will depend on ambient dirt level and minimum light output which is acceptable to user. Refractor/lens should be washed in a solution of warm water and any mild, non-abrasive household detergent, rinsed with clean water and wiped dry. Should optical assembly become dirty on the inside, wipe refractor/lens and clean in above manner, replacing damaged gaskets as necessary.
- DO NOT INSTALL DAMAGED PRODUCT! This luminaire has been properly packed so that no parts should have been damaged during transit. Inspect to confirm. Any part damaged or broken during or after assembly should be replaced.
- Recycle: For information on how to recycle LED electronic products, please visit www.epa.gov.
- These instructions do not purport to cover all details or variations in equipment nor to provide every possible contingency to meet in connection with installation, operation, or maintenance. Should further information be desired or should particular problems arise which are not covered sufficiently for the purchaser’s or owner’s purposes, this matter should be referred to Acuity Brands Lighting, Inc.
WARNING
RISK OF ELECTRIC SHOCK
✓ Disconnect or turn off power before installation or servicing.
✓ Verify that supply voltage is correct by comparing it with the luminaire
label information.
✓ Make all electrical and grounded connections in accordance National
Electrical Code (NEC) and any applicable with the local code requirements.
✓ All wiring connections should be capped with UL approved connectors.
WARNING
RISK OF BURN
✓ Allow lamp/fixture to cool before handling. enclosure or light source.
✓ Do not exceed maximum wattage marked on luminaire label.
✓ Follow all manufacturer’s warnings, and restrictions for: driver type,
burning position, mounting recommendations locations/methods, replacement and
recycling.
**CAUTION
RISK OF INJURY
✓ Wear gloves and safety glasses at all luminaire from carton, installing,
servicing or performing maintenance.
✓ Avoid direct eye exposure to the light source while it is on.
CAUTION
RISK OF FIRE
✓ Keep combustible and other materials that can burn, away from lamp/lens.
✓ Do not operate in close proximity to materials or substances affected by heat
or drying. persons, combustible
CAUTION:** RISK OF PRODUCT DAMAGE
✓ Never connect components under load.
✓ Do not mount or support these fixtures in a manner that can cut the outer
jacket or damage wire insulation.
✓ Controls for dimming, auto-sensing, or remote control of a luminaire that
are not factory-wired to the luminaire must be checked for compatibility with
the luminaire prior to installation. LED fixtures must be powered directly o ffa
switched circuit.
✓ Unless individual product specifications deem otherwise: Do not restrict
fixture ventilation. Allow for some volume of airspace around fixture.
Avoid covering LED fixtures with insulation, foam, or other material that will
prevent convection or conduction cooling.
✓ Unless individual product specifications deem otherwise: Do not exceed
fixtures maximum ambient temperature.
✓ Only use fixture in its intended location.
✓ LED products are Polarity Sensitive. Ensure proper Polarity before
installation.
✓ Electrostatic Discharge (ESD): ESD can damage LED fixtures. Personal
grounding equipment must be worn during all installation or servicing of the
unit.
✓ Do not touch individual electrical components as this can cause ESD, shorten
lamp life, or alter performance.
✓ Some components inside the fixture may not be serviceable. In the unlikely
event your unit may require service, stop using the unit immediately and
contact an ABL representative for assistance.
✓ Always read the fixtures complete installation instructions prior to
installation for any additional fixture specific warnings.
✓ Always ensure that the electrical distribution system is up to NEC (and any
applicable local code) requirements.
✓ Verify that power distribution system has proper grounding. Lack of proper
earth ground can lead to fixture failure and may void warranty.
Choose either Part 15 OR Part 18 and move to Page 3 Installation Instructions
under Delivery. Lithonia Outdoor will always use Part 15.
All luminaires that contain electronic devices that generate frequencies above
9kHz from any component within the luminaire comply with Part 15 of the FCC
Rules. Operation is subject to the following two conditions:
- This device may not cause harmful interference
- This device must accept any interference received, including interference that may cause undesired operation
This device complies with Part 18 of the FCC Rules but may cause interference
with cordless and cell phones, radios, televisions, and other electronic
devices. To correct the problem, move the device away from the luminaire or
plug into a different outlet. This product may cause interference to radio
equipment and should not be installed near maritime safety communications
equipment or other critical navigation or communications equipment operating
between 0.45-30MHz.
Failure to follow any of these instructions could void product warranties. For
a complete listing of product Terms and Conditions, please visit.
www.acuitybrands.com
Acuity Brands Lighting, Inc. assumes no responsibility for claims arising out
of improper or careless installation or handling of its products.
ABL LED General Warnings, Form No. 503.203
© 2021, 2010, 2016 Acuity Brands Lighting, Inc. All rights reserved. 12/01/10
- To reduce the risk of death, personal injury or property damage from fire, electric shock, falling parts, cuts/abrasions, and other hazards please read all warnings and instructions included with and on the fixture box and all fixture labels.
- Before installing, servicing, or performing routine maintenance upon this equipment, follow these general precautions.
- Installation and service should be performed by a qualified licensed electrician.
- Maintenance should be performed by qualified person(s) familiar with the products’ construction and operation and any hazards involved. Regular maintenance programs are recommended.
- DO NOT INSTALL DAMAGED PRODUCT! This product has been properly packed so that no parts should have been damaged during transit. Inspect to confirm. Any part damaged or broken during or after assembly should be replaced.
- These instructions do not purport to cover all details or variations in equipment nor to provide every possible contingency to meet in connection with installation, operation, or maintenance. Should further information be desired or should particular problems arise which are not covered sufficiently for the purchaser’s or owner’s purposes, this matter should be referred to Acuity Brands Lighting, Inc.
WARNING
RISK OF ELECTRIC SHOCK
✓ Disconnect or turn off power before installation or servicing.
✓ Verify that supply voltage is correct by comparing it with the luminaire
label information.
✓ Make all electrical and grounded connections in accordance National
Electrical Code (NEC) and any applicable with the local code requirements.
✓ All wiring connections should be capped with UL approved connectors.
WARNING
RISK OF BURN
✓ Allow lamp/fixture to cool before handling. enclosure or light source.
✓ Do not exceed maximum wattage marked on luminaire label.
✓ Follow all manufacturer’s warnings, and restrictions for: driver type,
burning position, mounting recommendations locations/methods, replacement and
recycling.
**CAUTION
RISK OF INJURY
✓ Wear gloves and safety glasses at all luminaire from carton, installing,
servicing or performing maintenance.
✓ Avoid direct eye exposure to the light source while it is on.
CAUTION
RISK OF FIRE**
✓ Keep combustible and other materials that can burn, away from lamp/lens.
✓ Do not operate in close proximity to materials or substances affected by heat
or drying. persons, combustible
Always read the fixtures complete installation instructions prior to
installation for any additional fixture specific warnings.
Failure to follow any of these instructions could void product warranties. For
a complete listing of product Terms and Conditions, please visit.
www.acuitybrands.com
Acuity Brands Lighting, Inc. assumes no responsibility for claims arising out
of improper or careless installation or handling of its products.
ABL LED General Warnings, Form No. 503.203
© 2021, 2010, 2016 Acuity Brands Lighting, Inc. All rights reserved. 12/01/10
CAUTION: RISK OF PRODUCT DAMAGE
✓ Electrostatic Discharge (ESD): ESD can damage product(s). Personal
grounding equipment must be worn during all installation or servicing of the
unit.
✓ Do not touch individual electrical components as this can cause ESD and
affect product Performance.
✓ Do not stretch or use cable sets that are to short or are of insufficient
length.
✓ Do not tamper with contacts.
✓ Do not modify the product.
✓ Do not change or alter internal wiring or installation circuitry.
✓ Do not use product for anything other than its intended use.
✓ If installing latching springs: ensure that the springs are fully engaged
prior to moving to next connection.
✓ If installing wiring systems: Materials and component parts of a
manufacturing wiring system as described in Article 604 of the National
Electric Code and Underwriters Laboratories Standard for Safety #183 MUST BE
installed.
Please see product specific installation instructions for additional warnings
or any applicable FCC or other regulatory statements.
Failure to follow any of these instructions could void product warranties. For
a complete listing of product Terms and Conditions, please visit
www.acuitybrands.com
Our Brands| Indoor/Outdoor| Controls| Daylighting|
Outdoor Lighting| Indoor Lighting
---|---|---|---|---|---
Lithonia Lighting
Carandini
Holophane
RELOC
Light Concepts| Gotham
Mark Architectural Lighting
Peerless
Renaissance Lighting
Winona Lighting| American Electric Lighting
Antique Street Lamps
Hydrel
Tersen| DARK TO LIGHT
LC&D
ROAM
Sensor Switch
Synergy| Pre-Launch
Acuity Brands Lighting, Inc. assumes no responsibility for claims arising out of improper or careless installation or handling of its products.
Overview – Fixture
NOTE: Illustrations are used for reference only and can differ slightly
from the actual lighting system installed. However, key components addressed
in this information are
represented as accurately as possible.
WARNING: DO NOT LOAD SINGLE FEED TO MORE THAN 6 AMPS
Overview – Mounting
INDIVIDUAL FIXTURES (MOUNTING)
LENGTH| “A” O.A.L.| “B” O.C.| “C” FROM END
2FT| 2′- 0 9/16″| 1′- 11 13/16″| 3/8″
3FT| 3′- 0 9/16″| 1′- 11 13/16″| 3/8″
4FT| 4′- 0 9/16″| 1′- 11 13/16″| 3/8″
5FT| 5′- 0 9/16″| 1′- 11 13/16″| 3/8″
6FT| 6′- 0 9/16″| 1′- 11 13/16″| 3/8″
7FT| 7′- 0 9/16″| 1′- 11 13/16″| 3/8″
8FT| 8′- 0 9/16″| 1′- 11 13/16″| 3/8″
O.A.L. – Overall lenght
O.C. – Distance from center to center
Feed Point Locations
Run Configurations
RUN LAYOUT (MOUNTING)
“A1” O.A.L.| “A2” O.A.L.| “B” O.C| C” FROM END
4′- 0 1/4″| 4′-0″| 3′- 11 15/16″| 3/8″
5′- 0 1/4″| 5′-0″| 3′- 11 15/16″| 3/8″
6′- 0 1/4″| 6′-0″| 3′- 11 15/16″| 3/8″
7′- 0 1/4″| 7′-0″| 3′- 11 15/16″| 3/8″
8′- 0 1/4″| 8′-0″| 3′- 11 15/16″| 3/8″
Parts – Hanging Hardware
Provided in a separate red box labeled “INSTALLATION HARDWARE PLEASE OPEN
FIRST”.
All other parts for installation to be provided by others.
NOTE: Feed kit is the same for F1/F2 and parts are provided for both
types of ceiling install. See parts list on this page for provided mounting
hardware kit. Pre-Launch
Set Up Ceiling – Grid Ceilings (F1)
Feed Locations:
a. Install J-box (by others) into the ceiling. Ensure the bottom edge is flush
with the ceiling. Connect the metal conduit from building power to the J-box.
b. Mount the crossbar to the J-box using (2) #8 screws and fasten it securely
to the J-box.
c. Insert strain relief to the feed cord.
d. Pass the feed cord through the hole in the canopy and make wire connections
inside J-box. Flush the canopy with the crossbar and thread coupler onto
crossbar screw.
NOTE: A separate hole is provided for a CAT5 cable if NLIGHT option is
selected.
Non-Feed Locations (On-Grid):
a. Insert bolt into the bottom of bracket (A) and hook onto grid member.
b. Hook bracket (B) onto bracket (A) and adjust brackets to proper location
along the ceiling grid and push the tab from (A) towards bracket (B) to secure
brackets together.
c. Secure the brackets to the building structure per local building codes.
Non-Feed Locations (Off-Grid):
a. Insert bolt into the bottom of bracket (A) and hook together with bracket
(B). Secure with nut (DO NOT TIGHTEN).
b. Slide hanger onto caddy bar and fit caddy bar into upper slots on the grid
members.
c. Adjust brackets to proper location and push the tab from bracket (A)
towards bracket (B) to secure brackets together.
d. Secure the brackets to the building structure per local building codes.
Set Up Ceiling – Hardlid (F2)
Feed Locations:
a. Install the 4O J-box (by others) into the ceiling. Ensure the bottom edge
is flush with ceiling. Connect the metal conduit from building power to the
J-box.
b. Mount crossbar to J-box using (2) #8 screws and fasten it securely to
J-box.
c. Install strain relief to the feed cord.
d. Pass feed cord through the bushing in the canopy and make wire connections
inside J-box. Flush canopy with the crossbar and thread coupler onto the
crossbar screw.
NOTE: A separate hole is provided for CAT5 cable if NLIGHT option is
selected.
Non-Feed Locations:
Secure 1/4-20 threaded rod approximately 3/8” to 5/8” below the ceiling.
Insert canopy and securely fasten the coupler.
Prep Fixtures
- Labels are located on the carton, on the fixture, and on the lens.
- Each section is identified by and ID#.
- Section position starting with X.000 for the first fixture.
- Same fixture configuration can carry identical ID# and are interchangeable.
- Individual fixtures have whole number Y.
- For replacement parts, provide ID# and order #.
Mount First Section
First Section:
a. Mount the grip lock from the hanging hardware kit onto the screw provided
on the fixture.
b. Adjust aircraft cable up or down, by pushing down on upper lock cylinder.
Once required length is achieved, allow lock cylinder to spring back up. Make
sure the lock screw is tightened. Hide or trim the excess cable length.
For an Individual Fixture:
Repeat the same procedure from step (1) on the other end of fixture.
NOTE: For a run, refer to step 3.
For a Run:
a. Mount the grip lock onto the screw on the hanger bracket and temporary
secure in place with supplied #8 screw.
b. Slide the hanger bracket into open end of housing.
c. Adjust aircraft cable up or down, by pushing down on upper lock cylinder.
Once required length is achieved, allow lock cylinder to spring back up. Make
sure the lock screw is tightened. Hide or trim the excess cable length.
Opening Fixtures
Grasp dust cover (if present) and pull it slowly out of the housing.
Unscrew four #8 screws and remove the reflector tray.
Join Sections
(NOTE: Joining hardware parts provided in a separate red bag.)
Install (4) aligner keys onto one end of the run.
The bump on the aligner key should face the extrusion. Half of the aligner key
should be exposed to insert into the next section.
a. Slide joining fixture over hanger bracket while keeping aligner keys
aligned to the holes from opposite fixture body.
b. Fully join sections together, latch the hook and slide the hanger bracket
into the next section (Detail “A”).
NOTE: Pull wires into the next section before fully joining fixture
together. From each quick connector provided on the intermediate ends of the
fixture remove and discard the half (male or female) to which no wires are
connected. Make electrical connections w
(NOTE: Joining hardware parts provided in a separate red bag.)
- Insert sliding joiners through slots at hanger bracket and tighten with #8 screws provided.
- Secure hanger bracket with #8 screws provided.
Electrical Connections
a. Pull the feed cable through grommet at the beginning of the run.
b. Using pliers, compress the metal strain relief on the power feed cable.
c. If NLIGHT option is selected, remove cap next to the power cord, feed CAT5
cable through it, and connect to the RJ45 port.
d. If NLIGHT or DCT option is selected, remove second cap for the CAT5 cable
or second feed.
NOTE: Feed may come pre-installed if pre-installed feed option was
selected.
Make wiring connections.
NOTE: Emergency feed uses the exact same feed kit and cord.
Wires used to power EMPACK.
NOTE: Cap the unused wire at the junction box.
Close Fixtures
Insert reflectors into the housings.Secure reflectors with #8 screws.
Gently push dust cover (if presented) and snap it into the housing.
NOTE: Use two people when working with fixtures greater than 4 feet.
Supplemental
Dust Cover Removal (DC/DCF):
To remove, lift dust cover.
Battery Pack/Test Switch (E10WLCP):
a. If battery pack option is selected (E10WLCP), then an un-switched normal
hot is required for power and sensing.
b. Standard battery drop is on the right side of the section with the battery.
See above diagram for location of test button.
nLight AIR NOTE:
Install antenna on coax cable.
Remote BGTD Mounting Option:
a. Suggested to mount in an accessible location for maintenance. To be
installed in ceiling or to structure according to local and NEC code.
b. 6 foot flexible conduit is attached. The remote BGTD should be mounted
within 6 feet of the J-box above the fixture.
Continuous lens
a. Begin lens install per “Left (L)” detail.
b. Snap lens into fixture housing making sure to follow “Lens Orientation”
detail. Push left side of lens end approximately 1/8″ into end cap.
c. Unroll lens as you make your way through the run.
d. Follow “Right (R)” detail for lens cutting. Cut lens approximately 1/8″
longer than last section housing and tuck in right lens end into end cap
cavity.
NOTE: Use at least two people when installing a continuous lens.
NOTE: Continuous lens supplied oversized for any given run lengh.
Contractor to make final lenght cut at the time of installation.
NOTE: Continuous lens should stay at room temperature for a few hours
before installation.
Check out helpful programs, tools, installation videos and more. postsales.acuitybrands.com/qr/?sn=2562C210004322520
marklighting.com
800-705-SERV (7378)
TechSupport-Mark@AcuityBrands.com
I © 2022 AcuityBrands Lighting, Inc. All Rights Reserved.
We reserve the right to change design, materials and finish in any way that
will not alter installed appearance or reduce function and performance.
ABL LED General Warnings, Form No. 503.203
© 2021, 2010, 2016 Acuity Brands Lighting, Inc. All rights reserved.
12/01/10
912-00323-001
10/14, Rev A
Documents / Resources
| MARK
LIGHTING SLOT 4 Recessed Linear
Lighting
[pdf] Instruction Manual
SLOT 4 Recessed Linear Lighting, Recessed Linear Lighting, SLOT 4 Linear
Lighting, Linear Lighting, Lighting, SLOT 4
---|---
References
- Mark Architectural Lighting | Acuity Brands
- Acuity Brands | Lighting, Controls, and Building Management Solutions
- U.S. Environmental Protection Agency | US EPA
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>