ZEVNI A04466 Chandelier Installation Guide

June 8, 2024
ZEVNI

Item Number: A04466
Installation Guide

A04466 Chandelier

WARNING (To reduce the risk of fire, electric shock, or personal injury):

  1. We suggest installation by a licensed electrician.

  2. Please read the instruction carefully and save it as you may need it at a later time.

  3. Before you start, NEVER attempt any work without shutting off the electricity until the work is done.
    » Go to the main fuse, or circuit breaker, box in your home.
    Place the main power switch in the “OFF” position.
    » Place the wall switch in the “OFF” position.

  4. Mounting surface should be clean, dry, flat, strong enough and 1/4” larger than the canopy on all sides.
    Any gaps between the mounting surface and canopy exceeding 3/16” should be corrected as required.

  5. Make sure that the ceiling or wall can stand the weight of the lamp before installation.

  6. Make sure the voltage you are using is 120V. The maximum wattage is 40W per bulb.

  7. Keep the lamp away from acidic and alkaline substances in case of damaging the surface of the lamp.

  8. When replacing bulbs, you should turn off or unplug the lamp and you must wait until it is cool as bulbs get hot quickly.

  9. The safety instructions appearing in this manual are not meant to cover all possible conditions that may occur. It must be understood that common sense, caution and care must be used with any electrical products.

IMAGE FOR FINISHED PRODUCT:

ZEVNI A04466 Chandelier

ORDERING PARTS
Keep this sheet for future reference in case you need to order replacement parts. All parts for this fixture can be ordered from the place of purchase. Be sure to use exact wording from illustration when ordering parts.
CLEANING
To clean, wipe the fixture with a soft cloth. Do not use abrasive materials such as scouring pads or powders, steel wool or abrasive paper.
TOOLS REQUIRED (NOT INCLUDED):
Before starting assembly and installation please prepare the needed tools as below picture

| | | |
---|---|---|---|---
Ladder| Phillips head.flat blade screwdriver| Electrical tape| Pliers| Wire cutter/Stripper

PARTS TYPE & QTY INCLUDING:

ZEVNI A04466 Chandelier - FIGURE 1

(C) Mounting plate (1)
(D) Green ground screw (1)
(E) Canopy (1)
(F) Swivel joint (1)
(G) Knob nut (2)
(H) Tube
(I) Iron frame (2)
(J) Stem (1)
(K) Arm (4)
(L) Arms assembly (1)
ACCESSORIES & QTY ENCLOSED:
(A) Plastic wire connector (3)
(B) Mounting screw (2)

ASSEMBLY & INSTALLATION INSTRUCTIONS:

  1. Carefully remove the fixture from the carton and check that all parts and accessories are included as shown in the above illustration.

  2. Turn off power
    Before you start the installation, NEVER attempt any work without shutting off the electricity until the work is done.
    » Go to the main fuse, or circuit breaker, box in your home.
    Place the main power switch in the “OFF” position.
    » Place the wall switch in the “OFF” position.

  3. Unscrew knob nuts (G) from canopy (E) then remove mounting plate (C).ZEVNI A04466 Chandelier - FIGURE 2

  4. Adjust iron frames (I) and arms (K) to the proper position.ZEVNI A04466 Chandelier - FIGURE 4

    1. According to your desired hanging height to choose and use tubes (H).
      Then pass the fixture wires through the chosen tubes (H), swivel joint (F) and canopy (E).
  1. Be sure that all the threaded pipes are tightened, then screw the chosen tubes (H) onto swivel joint (F) and the top of iron frames (I).
    Hand tighten till snug.ZEVNI A04466 Chandelier - FIGURE
5
  1. Attach mounting plate (C) to the outlet box with mounting screws (B).ZEVNI A04466 Chandelier - FIGURE 6
  2. Make wire connections
    Connect wires as below wires connection shown. PLEASE NOTE THAT GROUND WIRE IS BARE COPPER WIRE, NEVER CONNECT OTHER WIRES TO GROUND WIRES.
    Connect ground wires according to the below chartZEVNI A04712
Chandelier - FIGURE 10 Connect wires according to the below chart Connect Black or Red Supply Wire to:| Connect White Supply Wire to:
    ---|---
    Black| White
    Parallel cord ( round & smooth )| Parallel cord ( square & ridged )
    Clear,Brown,Gold or Black without tracer| Clear,Brown,Gold or Black with tracer
    Insulated wire ( other than green) with copper conductor| Insulated wire ( other than green ) with silver conductor

*Note: When parallel wires ( SPT I & SPT II ) are used. The neutral wire is square shaped or ridged and the other wire will be round in shape or smooth ( see illus. )
ZEVNI A04712 Chandelier - FIGURE 11Twist wires together with plastic wire connectors until tightly joined, and wrap each connector with approved electrical tape. Be sure that no wire strands are exposed and then carefully tuck all wires into the outlet box.

  1. Raise canopy (E) to the ceiling and secure canopy (E) in place by tightening knob nuts (G) onto the pre­assembled screws in mounting plate (C)ZEVNI A04466 Chandelier - FIGURE 7 Note: canopy (E) should be snug against the ceiling and knob nuts (G).
    If not, adjust the threaded length on mounting plate assembly (C):
    • first, unscrew the pre­assembled hex nuts;
    • then, screw the pre­assembled screws in or out of mounting plate (C);
    • when the secure length is achieved, tighten the hex nuts and back to step 8. ZEVNI A04466 Chandelier - FIGURE 8

  2. Install bulbs (not included) (Please do not exceed the maximum wattage recommended on the socket.)

  3. Check everything is already installed properly, then you could turn on the light. Enjoy!

+1 850 296 2377
Working hours : Mon ­ Fri 9:00 a.m. ­ 16:00 p.m. EST
homecustomercare@outlook.com
www.ihomeangel.com

Documents / Resources

| ZEVNI A04466 Chandelier [pdf] Installation Guide
A04466 Chandelier, A04466, Chandelier
---|---

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

ZEVNI User Manuals

Related Manuals