Raingler NETS GRIPS N210 Full Ceiling Attic Net Installation Guide
- June 8, 2024
- Raingler NETS GRIPS
Table of Contents
N210 Full Ceiling Attic Net
Installation Guide
N210 Full Ceiling Attic Net
2003 – 2009 Toyota 4Runner 4th Gen (N210) Ceiling Attic Net Installation
NOTE: Many newer models have B-pillar handles and even overhead on the
ceiling that can be used for some of the top mounting locations. Check to see
if you prefer to use these factory locations as the nets typically have enough
adjustment to allow for this option. If your vehicle does not have handles in
desired locations or you prefer to install mounting points for better fitment,
please follow the below steps.
IMPORTANT: READ INSTRUCTIONS FULLY BEFORE STARTING
Time: approximately 60 minutes
Paw Level:
Tools:
- Ratchet or Wrench
- 10MM socket/wrench
- 14MM socket/wrench
- Small flat blade and/or panel removal tool for removing access covers and releasing plastic snap divots.
EZ install Ceiling Nets will not need any tools to install and typically take about 10 minutes simply installing on OEM handles or the C102 mounts explained in Step 2 below. Your particular model may very slightly from these shown and may include additional hardware that you don’t need. Please contact us for assistance if questions before proceeding.
*Instructions show process for 2 and 3 row equipped models.
Step 1
D pillar mounting.
3rd row equipped models remove the plastic upper seat belt bolt to access the
14mm black bolt and remove.
2nd row equipped models may have mirrors on the trim panels that can easily
pop out. Loosely pop back just the top of the upper
D pillar trimpiece just enough to slide the C100XL behind the trim and align
the mounting hole to the seat belt bolt. Reinstall with the
D ring tether protruding over the top of the D pillar trim and reassemble.
3rd row version shown here. ![Raingler NETS GRIPS N210 Full Ceiling Attic Net
- fig 4](https://manuals.plus/wp-content/uploads/2023/01/Raingler-NETS-
GRIPS-N210-Full-Ceiling-Attic-Net-fig-4.png)Step 2
Above the ¼ window mounting and optional B pillar forward mounting.
Your model may have handles here, plastic hooks, or nothing at all.
If you have plastic hooks or handles, remove the side pop out cap and remove the Phillips or 10mm bolts and reassemble with the C102 hardware as shown. If you have nothing here, you will need to install the C100M hardware set
See video here for details. https://vimeo.com/316655122
Line up this location last, once the net has been put into location for the most exact alignment. Step 3
Line up the ceiling net to the factory handles and previously installed D rings. Adjust and center to tension buckles and mounting straps in desired location.
Step 4
Tie up the loose ends. You can do this by feeding the end of the strap through
the opening of the buckle to create a loop. Feed the strap through the loop,
and the strap behind, continue until no strap is hanging.
See video here for details: https://vimeo.com/316588617Thank you for purchasing Raingler Nets.
If you have any questions please contact us, we are here to help!
See all our install videos on Vimeo! https://vimeo.com/raingler
866-905-7625
Tech@RAINGLER.com
Raingler.com
References
- Cargo, barrier and dog safety nets - Raingler Nets
- Tying Up Loose Ends on Vimeo
- Raingler C100 Mounts for Barrier and Ceiling Installation - Trucks & Vans on Vimeo
- Raingler Nets & Barriers
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>