cable bullet HRS-1.25-93 Stainless Steel Handrail User Guide
- June 3, 2024
- cable bullet
Table of Contents
HRS-1.25-93 Stainless
Steel Handrail
User Guide
VENTURE SERIES TOP MOUNT POST
36” | 42”
END | LINE
UNIVERSAL POST TOP
HRS-1.25-93 Stainless Steel Handrail
Concrete should be rated at 3500 PSI or higher and free of cracks in the area where posts will be mounted.
IMPORTANT: It is the installer’s responsibility to make certain the structure supporting your posts is able to handle the transferred loads of the railing system (+150 lbs of tension/cable).
WOOD FOUNDATION
3-1/2” Blocking Recommended
- Screw length will vary by handrail thickness.
** Custom Cable Bullet screw with continuous threading to maximize holding strength. See pg. 2 for screw length recommendations.
*** If no interior blocking, consult a local builder for a custom solution to secure against a 200 lb. concentrated load.
TOOLS
- Cable Bullet crimper*
- Cable cutter*
- Magnetic Multi-Bit Screw Driver*
- 1/8” Allen wrench*
- 3/16” Allen wrench*
- 6” Hex Socket Head Power Bit (1/8”)*
- Drill/impact driver
- 3/16” drill bit*
- T30 x 6” star drive power bit*
- Level
- Tape measure
SUPPLIES
- 5/32” diameter cable*
- Cable end fittings (included with end posts)*
- Stainless steel lubricant/protectant*
- Cable spacer bar kits (optional)*
- Shop rags
- 1” painter’s tape (optional)
- Post mounting screws (1/4” SS star drive socket head cap screws*)
- Stainless steel handrail* (or custom wood top rail)
- Handrail mounting screws (see pg. 1)*
*Posts MUST be anchored to project structural frame (joists, blocking, etc)
and all 3” of mounting screw threading should be engaged in structural
material. If mounting directly to structural material, use 3-1/2” long
mounting screws. If mounting through non-structural material (veneer or trim),
use 4-1/2” long mounting screws.
available at www.cablebullet.com
POST SPACING FOR CABLE SUPPORT
Follow these guidelines for optimal cable tension and to minimize cable
deflection.
TENSIONING POST SPACING | 20’ MAX.
To ensure adequate cable tension (150#) use two end posts and additional
tensioners to cover longer runs. CABLE SUPPORT POSTS | 4’ MAX.
To minimize deflection under load, add intermediate posts, or cable spacer
bars every 42–48 inches.
POSTS SPACING FOR HANDRAIL SUPPORT
Structural support post spacing for Cable Bullet stainless steel handrail will
vary by layout. Follow the guidelines below.
For wood top rail, spacing will vary by material, thickness, & rigidity.
SIMPLE SPAN | 7’ MAX.
Standalone section of railing with 2 end posts and no continuation on either
end. ****
OUTSIDE SPAN | 8’ MAX.
One end post with one connecting span on the opposite side.
CENTER SPAN | 9’ MAX.
One section of railing with two connecting spans.
IMPORTANT: All recommendations and rail components are designed to comply with
the IRC.
Because building codes vary, it is the installer’s responsibility to verify
that the installed system complies with all applicable state and local
building codes.
Detailed installation instructions for Venture series railing are available at: www.cablebullet.com/blogs/guides
STEP 1 | FIND POST LOCATION
Determine the placement of your posts, and mark the location of each
structural screw (4 per post). See page 1 for screw recommendations.
PRO TIP: Use painter’s tape to mark the edge and angle of your posts.
STEP 2 | DRILL PILOT HOLES
Set your post aside and drill your four pilot holes. The size and depth of
your pilot holes will vary by project and foundation construction.
STEP 3 | SET MOUNTING SCREWS
Set each screw, but don’t tighten them down before levelling the post. Screw
lengths and type will vary by application.
It is the installer’s responsibility to ensure there is sufficient blocking to
anchor securely to!
STEP 4 | ADVANCE SCREWS
Use 3/16” Allen wrench to advance the four set screws to plumb your post, then
finish setting each screw. Repeat the process until all structural posts are
set.
PRO TIP: The leveling feature is designed to work best on hard surfaces.
On soft wood or composite decks, consider adding a #10 washer underneath each
set screw. STEP 5 | ATTACH TOP RAIL
Your project is now ready for top rail.
Installation will vary by top rail selection.
For Cable Bullet stainless steel handrail, refer to the installation
instructions or for more information, visit
www.cablebullet.com/blogs/guides.
STEP 6 | INSTALL YOUR CABLES
After attaching your top rail, install your cable runs. Complete this process
following the instructions on page 4.Images in steps 2-3 show
GRK RSS 5/16 x 5-1/8”, an alternative screw to the Cable Bullet post mounting
screws (1/4” SS star drive socket head cap screws).
INSTALLING CABLE INFILL
Remove pre-installed set screws from channels of post. These are essential for
tensioning cables. Apply a drop of lubricant to each set screw channel to ease
installation, reduce the likelihood of seizing, passivate the stainless, and
help prevent corrosion.
STEP 1 | CUT CABLE LENGTHS
Measure railing sections and cut oversized, rough lengths of cable for each.
Leave a few extra inches to avoid ending up short. You will make a final cut
later. CAUTION: A properly crimped cable end
is essential to maintaining the integrity and safety of your cable. A weak
connection will slip over time or fail against an impact load!
STEP 2 | CRIMP CABLE ENDS
Fit first end of cable with lobed washer and crimp sleeve. Use Cable Bullet
crimper to firmly set crimp sleeve. Properly crimped cable end will show
distinct hex- agonal imprint pattern.
STEP 3 | SET CABLE END
Retrieve a pre-installed set screw. Insert crimped cable and lobed washer into
post tensioning channel and use 1/8” Allen key (or hex socket power bit) to
advance set screw just until it’s flush with face of the post. With crimped
end locked in place, thread cable through all intermediate posts and spacer
bars along span.
CAUTION : To minimize the risk of cross-threading or galling, use a manual socket screw driver or Allen wrench.
STEP 4 | MAKE FINAL CUT
Pull cable hand-tight, measure 1” past face of post, and make final cut.
Repeat steps 2 & 3 to secure the second end of cable. Repeat process for each
cable run.
STEP 5 | FINAL TENSIONING
Once all cables are in place, begin tensioning each run from innermost cable
outwards. Take care not to over-tighten cables. Properly tensioned cable will
deflect approximately 1/4” per foot under a 50# load.
STEP 6 | SET SPACER BARS
Position and lock floating spacer bars in place by advancing set screws on top
and bottom. Wipe down railing following the Cable Bullet Care & Maintenance
instructions to clean & protect stainless steel.
Your railing is now complete. For more information, visit
www.cablebullet.com/blogs/guides.
WE’RE HERE TO HELP!
WWW.CABLEBULLET.COM
INFO@CABLEBULLET.COM
574.742.2737
CB006_2021-9-27
References
- bullet.com/blogs/guides
- Cable Bullet Cable Rail System | Hidden Cable Rail Tensioners
- Guides - Cable Bullet
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>