CHIKOUSA CK-U2V Steel Ground Mount Solar Panel Ground Instruction Manual
- September 27, 2024
- CHIKOUSA
Table of Contents
- CK-U2V Steel Ground Mount Solar Panel Ground
- Product Specifications
- Product Usage Instructions
- Installation Tools Required:
- Installation Rules:
- Installation Steps:
- Q: What is the maximum span for this ground mount system?
- Q: What certifications does this racking system have?
- Q: What is the maximum rated current for this product?
CK-U2V Steel Ground Mount Solar Panel Ground
“`html
Product Specifications
- Product Model: CHIKO CK-U2V
- Mount Type: Steel Ground Mount
- Max Span: 9′
- Max Rated Current: 30A
- Design Load:
- Downward Pressure – 10 psf allowable load
- Upward Pressure – 5 psf allowable load
- Down-Slope Load – 5 psf allowable load
- UL Certification: UL 2703 for Bonding, grounding, mechanical
loading, and fire classification
Product Usage Instructions
Installation Tools Required:
- Tape Measure
- Chalk Line
- Labor Protection Products
- End Clamp
- Mid Clamp
- Allen Key
- Front V Leg
- Rear V Leg
- Beam
- Beam Splice
- Open-end Spanner
- Strengthen Pipe
- Rail
- Rail Splice Kit
Installation Rules:
-
Comply with relevant local government standards and
manufacturer’s specifications. -
Ensure the roof conforms to local government standards.
-
Develop safe work procedures and provide appropriate training
and PPE. -
Prevent falls and ensure emergency procedures are known to all
employees.
Installation Steps:
-
Insert Ground Screw: Place the ground mount
attachment into the ground as per the provided drawing. -
Connect Top Beams:
-
Join two sections of top beams with Beam Splice using M10x80
Hardware. -
Mark the beam sections for proper installation on the front and
rear legs. -
Install Beams: Attach beams to front and rear
legs using hex bolts M10*80 with specified torque values. -
Assemble V Legs: Pre-assemble front and rear V
legs with V bases using hex bolts M10*80 with specified torque
values.
Frequently Asked Questions (FAQ)
Q: What is the maximum span for this ground mount system?
A: The maximum span for this system is 9 feet. Please review the
span charts considering site conditions for accurate
calculations.
Q: What certifications does this racking system have?
A: This racking system has been tested and evaluated to UL 2703
for Bonding, grounding, mechanical loading, and fire
classification.
Q: What is the maximum rated current for this product?
A: The maximum rated current is 30A.
“`
10 PANEL
30 PANEL
CHIKO CK-U2V
Steel Ground Mount
Installation Manual
Version 2023.06.2
I Installation Tools
Steel CK-U2V Ground Mount Installation Manual
Tape Measure
Chalk Line
Labor Protection Products
End Clamp
Mid Clamp
Allen Key
Front V Leg
Rear V Leg
Beam
Beam Splice
Open-end Spanner
Strengthen Pipe
Rail
Rail Splice Kit
II Installation Rule
Installation of the framing shall comply with relevant local government
standards, manufacturer’s specifications and good building practices. The roof
which the panels are to be installed shall conform to the relevant local
government standards.
Follow the risk management process prior to commencing work that is,
identify all the hazards, assess their risks and eliminate or control them.
Consult with those involved in the work.
Develop safe work procedures for installing solar panels, using information
from the risk management process, which would include reviewing the following
information:
Provide appropriate information and training to those involved in performing
the work. Provide appropriate tools and personal protective equipment (PPE).
Ensure that a system is in place to prevent or arrest falls. Ensure there are
adequate first aid facilities. Ensure all employees are aware of the emergency
procedures.
www.chikousa.com
1
Steel CK-U2V Ground Mount Installation Manual
III Notice
1. Max Span 9′
(Review current span charts and apply all applicable site conditions to
include wind, snow, module size, tilt, etc. to determine recommended site span
calculations.)
2. Max. Rated Current: 30A 3. Minimum design load for Chiko CK-U2V STELL
GROUND MOUNT mounting system:
a) Downward Pressure – 10 psf allowable load b) Upward Pressure – 5 psf
allowable load c) Down-Slope Load – 5 psf allowable load 4. This ground mount
system is used for in ground mounting 5. This racking system has been tested
and evaluated to UL 2703 for Bonding, grounding, mechanical loading and fire
classification, and may be used to ground and/or mount PV modules listed to UL
1703 or UL 61730.
IV Components
1. Base Support & Beam
2. Rail
3. Splice
4. End Clamp
5. Mid Clamp
6. Strengthen Pipe
8
7. Ground Screw
8. Beam Splice
3
6
2
4 5 7
1
www.chikousa.com
2
Steel CK-U2V Ground Mount Installation Manual
V Installation Steps
Insert Ground Screw, Trident Mount, or other approved ground mount attachment
into the ground according to drawing. 1
D
1.1
1.2
1.3
Connect 2 sections of the top beams (78.7″ & 82.6″) with the Beam Splice
(15.7″) connect the beams with the M10x80 Hardware, once 2 beams are spliced
together the new total beam length will be 161.4″ Mark the 82.6″ section of
Beam with a clearly visible mark on beam that can be seen from a top view.
Ensure that the marked portion of the beam is installed on the high side or
the side with the longest legs. (The marked portion was originally 82.6″)
2
78.7″
Install the beam on front leg and rear leg by hex bolts M10*80 (1 flat washer,
1 spring washer, 1 nut). M10: tighten torque is 30N.m; safe torque is 40N.m; 3
161.4″
82.6″
2.1
hex bolt M10*80
The front V leg and rear V leg are pre-assembled with V bases by hex bolts
M10*80 (1 flat washer, 1 spring washer, 1 nut).
M10: tighten torque is 30N.m; safe torque is 40N.m;
3.1
3.2
www.chikousa.com
3
4
hex bolt M12*35
hex bolt M10*80
Steel CK-U2V Ground Mount Installation Manual
4.1
4.2
Connect the V leg bases to ground screws by hex bolts M12*35 (2 flat washers,
1 spring washer, 1 nut); M12: tighten torque is 50N.m; safe torque is 55N.m;
Use the same attachment method and torque specs when utilizing the Trident
Mount. When connecting bases to concrete using anchor bolts follow the
specific anchor bolt installation instructions.
5
hex bolt M10*30
Connect rail to the beams by hex bolts
M10*30 (1 flat washer, 1 spring washer, and 1 nut);
5.1
M10: tighten torque is 30N.m; safe torque is 40N.m;
hex bolt M10*30
Use rail splice kit to connect 2 rails by hex bolts
5.2
M10*30 (2 flat washers, 1 spring washer, and 1 nut).
M10: tighten torque is 30N.m; safe torque is 40N.m;
www.chikousa.com
4
6
6.1 7
Steel CK-U2V Ground Mount Installation Manual
hex bolt M10*60
Connect 2 sections of strengthening pipe with orchid bolt in the middle of the
pipes, then connect either end of the connected strengthening pipe between 2
rear V legs by hex bolts M10*60 (2 flat washer, 1 spring washer and 1 nut)
after threaded rod has been inserted through connection bracket place washers
and nut on end of strengthening pipe.
M10: tighten torque is 30N.m; safe torque is 40N.m;
hex bolt M8*25
hex bolt M8*50 7.1
Install panels onto rails by fastening mid and end clamps. Note: End clamps by
inner hex bolts M825 (1 spring washer, 1 plastic steel nut);
Mid clamps by inner hex bolts M850 (1 spring washer, 1 plastic steel nut).
M8: tighten torque is 15N.m; safe torque is 20N.m;
8
Double-check to make sure all bolts are
fastened tight after installing
all the panels.
30 PANEL
10 PANEL
8.1
www.chikousa.com
5
VI Grounding System
Steel CK-U2V Ground Mount Installation Manual
The grounding function of the whole mounting system connections is achieved by
the following steps
1. Grounding Mid Clamp and Grounding End Clamp: Grounding & Solar Panel
2. Rail Splice Kit : Connect two rails
3. Beam Splice Kit : Connect two Beams
4. SUS Bolt and Nut: All mounting system connected
5. Ground screw: connect the mounting system to the ground 6. Grounding Lug
7. Copper wire (or other steel products): connect the mounting system to the
ground
(if not ground screw foundation, such as concrete)
www.chikousa.com
6
Steel CK-U2V Ground Mount Installation Manual
Grounding Lugs are intended for use with one solid or stranded copper wire,
conductor size range 10-6 AWG following local municipal and/or AHJ guidelines
CONTINUING MAINTENANCE
a) Any loose components or fasteners shall be re-tightened in accordance with
these instructions b) Any components showing signs of damage that compromise
safety shall be replaced immediately
FOR SINGLE USE ONLY
Bonding and grounding devices, are “For single-use only”, NOT multiple use)
Module removal may disrupt the bonding path and could introduce the risk of
electric shock. To ensure that the bonding path remains intact, additional
steps may be necessary; qualified persons should follow the instructions in
this manual.” Scenerios that could result in a disruption of the bonding path
are irregularly-shaped arrays, arrays consisting of individual rows or any
other scenario where module removal could disrupt the bonding path.
www.chikousa.com
7
Steel CK-U2V Ground Mount Installation Manual
Installation of Grounding Lug
Install a grounding lug (500mm from the rail end) on to each rail line edge
with an inner hex bolt M825 and a stainless steel nut, then cross 8.4mm2
(greater than or equal to 8AWG) copper wire through all the grounding lugs
(fixed by M820 inner hex bolt), finally connect copper wire to the ground.
The grounding lug has grounding function when fastened tight to connect rail
and copper wire. M8 Torque: 15~20N.m
Electrical Characteristics of AWG Copper Wire
AWG
6 7 8 9 10
Diameter [inches] 0.162 0.1443 0.1285 0.1144 0.1019
Diameter [mm] 4.1148 3.66522 3.2639 2.90576 2.58826
Resistance [Ohm / 1000ft.] 0.3951 0.4982 0.6282 0.7921 0.9989
Resistance [Ohm / km] 1.295928 1.634096 2.060496 2.598088 3.276392
Max Current [Amperes]
Max Frequency for 100% skin depth
37
1100 Hz
30
1300 Hz
24
1650 Hz
19
2050 Hz
15
2600 Hz
www.chikousa.com
8
Steel CK-U2V Ground Mount Installation Manual
Authorized to Mark
Equipment and components are authorized to be marked with the manufacturer’s name, trade name, trademark or other descriptive marking which identifies the organization responsible for The product, part number, and/or model number.
System Model No
: CK-U2V
Production Date : 20230315
Max. Rated Current
: 30A
Design Load :
Max. Size
: 6000mm
a) Downward Pressure – 10 psf
System Fire Class Rating : NA
See Installation Instructions for Installation Requirements to achieve a
Specified System UL2703 Grounding
b) Upward Pressure – 5 psf c) Down-Slope Load – 5 psf
with this Product.
Manufactured Add
: No 680 Xingwen Rd. Jiading dist. Shanghai 201815, China
www.chikousa.com
9
Steel CK-U2V Ground Mount Installation Manual
EXAMPLE SPAN CHARTS (20 DEGREES)
20 DEGREES
Potrait
Standard Strength
72 Cell Module
Allowable Rail Span (ft.) based on Wind Speed and Ground Snow Load
Wind Speed
90 MPH 100 MPH 1150 MPH 130 MPH 150 MPH
Ground Snow Loads
0 psf 20 psf 40 psf 60 psf 80 psf
9
7
6
4
–
8
7
5
4
–
6
6
5
4
–
5
5
4
–
–
–
–
–
–
–
20 DEGREES
Potrait
Standard Strength
Large Format Module
Allowable Rail Span (ft.) based on Wind Speed and Ground Snow Load
Wind Speed
90 MPH 100 MPH 1150 MPH 130 MPH 150 MPH
Ground Snow Loads
0 psf 20 psf 40 psf 60 psf 80 psf
8
7
5
4
–
7
6
4
–
–
5
5
4
–
–
4
4
–
–
–
–
–
–
–
–
10 www.chikousa.com
Steel CK-U2V Ground Mount Installation Manual
Panel Start Location for 10 and 30 Panel Systems using 9′ Spans
10 Panel System
x5=
Panel
of
Width Panels in
Row Spacing
+ 6″ =
– = 248″
Distance Total Panel Total Rail of Clamps Width Plus Length
Clamp Distance
÷2= Distance From End of Rail to 1st Panel
Example : (Using 41.1″ wide module) 41.1″ x 5 = 205.5″ +6″ = 211.5″ – 248″ =
-36.5″ / 2 = -18.25″ = 18.25″ Distance from end of Rail 1st Panel Edge
Installed
End of Rail to Beam Distance 16″ Max Panel Width 48.4″ AHJ to provide max wind
and snow span requirements for install location
30 Panel System
x 15 =
Panel
of
Width Panels in
Row Spacing
+ = 16″
– = 661.4″
Distance Total Panel Total Rail of Clamps Width Plus Length
Clamp Distance
÷2= Distance From End of Rail to 1st Panel
Example : (Using 41.1″ wide module) 41.1″ x 15 = 616.5″ + 16″ = 632.5″ –
661.4″ = -28.9″ / 2 = -14.45″ = -14.45″ Distance from end of Rail 1st Panel
Edge Installed
End of Rail to Beam Distance 6.7″ Max Panel Width 43″ AHJ to provide max wind
and snow span requirements for install location
11 www.chikousa.com
Side Profile Ground Mount
Steel CK-U2V Ground Mount Installation Manual
12 www.chikousa.com
Steel CK-U2V Ground Mount Installation Manual
CHIKOUSA Ground Mount 10 Panel System | 9 Foot Span | BOM
NEW CHIKO GROUND MOUNT; NUMBER OF NALES;
IMAGES
BOM COUNT
LENGTH IN INCHIES
12
82.7
10 DESCRIPTION
U72 Rail (2100mm)
(9 FOOT SPAN) PART NUMBER
CK-UR72-T2.5-001-2100
12
9.8
U72 Rail Splice Kit
CK-0221RU72-3-200
20
Mid clamp (30-40mm with grounding pin) CK-777RU-K-(30-40)-50
BEAM #1
BEAM #2
FRONT LEG
REAR LEG
8
End clamp (30-42mm with ground pin) CK-749RU-K-(30-42)-40
3
78.7
3
82.7
3
25.6 and 49.4
3
67.1 and 69.0
Beam #1-(2000mm) Beam #2-(2100mm) Front V LEG (Assembled) Rear V LEG (Assembled)
CK-ET-011-197-34-C261 – U2V-2000mm
CK-ET-011-197-34-C261 – U2V-2100mm
CK-ET-011-197-34-C26-2 CK-U2V-V-1705/1753
CK-ET-011-197-34-C26-3 CK-U2V-V-1705/1753
12
Bolts Kit for V Leg attched to Beam
CK-HS-006-2
3
78.7
Strengthen Pipe #1 (2000mm)
3
39.4
Strengthen Pipe #2 (1000mm)
CK-ET-011-197-34-
6
Strenghten pipe fix kit with Bolts
C26-4
Strengthen Pipe
2000mm+1000mm +
12
Nut and washer to fix Pipe
Connector
3
ORCHID BOLT/ PIPE Connector
13 www.chikousa.com
Steel CK-U2V Ground Mount Installation Manual
CHIKOUSA Ground Mount (CONTINUED) 10 Panel System | 9 Foot Span | BOM
6
65.0
Ground screw
6
Adjustable Flange
CK-GST-N16-3.0T2(H)800- 1600
36
31.5
Bolt to Tighten Top Flange to Ground Screw Bottom
12
Bolt to attach bottom V Legs to ground screw
CK-JGH-Q1235-2
1
Grounding Lug
CK-592RU-1-20
10
MLPE BOLT KITS for mico-inverter
CK-003RU(-37
12
5.9
Concrete Expansion Bolt M12*150
CK-JEB-12150
Mounting option: Ground Screw, Trident Mount, or Concrete Bolts (One Option Only)
14 www.chikousa.com
Steel CK-U2V Ground Mount Installation Manual
CHIKOUSA Ground Mount 30 Panel System | 9 Foot Span | BOM
NEW CHIKO GROUND MOUNT; NUMBER OF NALES;
IMAGES
BOM COUNT
LENGTH IN INCHIES
32
82.7
30 DESCRIPTION
U72 Rail (2100mm)
(9 FOOT SPAN) PART NUMBER
CK-UR72-T2.5-001-2100
32
9.8
U72 Rail Splice Kit
CK-0221RU72-3-200
60
Mid clamp (30-40mm with grounding pin) CK-777RU-K-(30-40)-50
BEAM #1
BEAM #2
FRONT LEG
REAR LEG
8
End clamp (30-42mm with ground pin) CK-749RU-K-(30-42)-40
7
78.7
7
82.7
7
25.6 and 49.4
7
67.1 and 69.0
Beam #1-(2000mm) Beam #2-(2100mm) Front V LEG (Assembled) Rear V LEG (Assembled)
CK-ET-011-197-34-C261 – U2V-2000mm
CK-ET-011-197-34-C261 – U2V-2100mm
CK-ET-011-197-34-C26-2 CK-U2V-V-1705/1753
CK-ET-011-197-34-C26-3 CK-U2V-V-1705/1753
28
Bolts Kit for V Leg attched to Beam
CK-HS-006-2
7
78.7
Strengthen Pipe #1 (2000mm)
7
39.4
Strengthen Pipe #2 (1000mm)
CK-ET-011-197-34-
14
Strenghten pipe fix kit with Bolts
C26-4 Strengthen Pipe
2000mm+1000mm +
28
Nut and washer to fix Pipe
Connector
7
ORCHID BOLT/ PIPE Connector
15 www.chikousa.com
Steel CK-U2V Ground Mount Installation Manual
CHIKOUSA Ground Mount (CONTINUED) 30 Panel System | 9 Foot Span | BOM
14
65.0
Ground screw
14
Adjustable Flange
CK-GST-N16-3.0T2(H)800- 1600
84
31.5
Bolt to Tighten Top Flange to Ground Screw Bottom
28
Bolt to attach bottom V Legs to ground screw
CK-JGH-Q1235-2
1
Grounding Lug
CK-592RU-1-20
30
MLPE BOLT KITS for mico-inverter
CK-003RU(-37
28
5.9
Concrete Expansion Bolt M12*150
CK-JEB-12150
Mounting option: Ground Screw, Trident Mount, or Concrete Bolts (One Option Only)
16 www.chikousa.com
Read User Manual Online (PDF format)