Tuindeco 250 190x250cm Sauna Barrel Pine Wood User Guide
- September 26, 2024
- TUINDECO
Table of Contents
- 250 190x250cm Sauna Barrel Pine Wood
- Product Information
- Specifications:
- Assembly:
- Ventilation and Maintenance:
- Window Installation:
- Additional Tips:
- Q: Are edge boards included in every model?
- Q: What should I do if I have a thermo wood sauna barrel?
- Q: Should I pre-drill holes before screwing components
250 190x250cm Sauna Barrel Pine Wood
“`html
Product Information
Specifications:
- Dimensions: 2500x140x42250 mm
- Construction: Sauna barrel
- Material: Thermowood
- Tools Required: Not included in the delivery
Product Usage Instructions
Assembly:
-
Read the entire manual before starting assembly.
-
Use the materials included in the kit to assemble different
lengths as needed. -
Pre-drill 4mm holes before screwing components together.
-
Follow guidelines for cutting materials if necessary.
Ventilation and Maintenance:
-
Ensure proper ventilation by rotating the ventilation grille
left and right. -
Oil threaded rods during assembly and maintenance to prevent
damage and ease clamping. -
Keep a distance and avoid gaps if the sauna is made of
thermowood.
Window Installation:
-
If windows are part of the model, they can be ordered as
accessories. -
When installing windows, ensure they are installed from the
inside.
Additional Tips:
- Use a spirit level for accurate alignment.
- Mark window openings before installation.
- If using an electric oven, attach det.23 directly to the wall
without det.22 using screw 3×25.
Frequently Asked Questions (FAQ)
Q: Are edge boards included in every model?
A: Edge boards are not part of every model and can be ordered as
accessories separately.
Q: What should I do if I have a thermo wood sauna barrel?
A: Do not remove the screws in a thermo wood sauna barrel to
prevent damage. Oil threaded rods for easier clamping.
Q: Should I pre-drill holes before screwing components
together?
A: Yes, it is recommended to pre-drill 4mm holes before screwing
components to avoid damage and ensure secure assembly.
“`
250
Before you start assembling the sauna, please read the entire manual. All
units of measurement are in millimeters.
A sauna barrel can never be 100% tight due to the construction.
Tools that make your construction easier. Not included in the delivery.
Windows are not part of every model and can be ordered as accessories
2500x140x42250/ 02x510400xx14124x/ 4225002x510104xx4442x44346200/x45x15
x2+x2
635x45x15
x2+x2
x1
11
x2 1670x45x15
openable
x1
11a
35 x2
x2
1690x28x28
36
19 x1
x8
1800×520
Edge boards are not part of every model and can be ordered as accessories
4 x1
x66
1776 mm
1776 mm
4 4
3
When assembling the round material use the material included in the kit to assemble different lengths to achieve the desired result.
x10
4
Please pre-drill the 4mm holes before screwing.
4
5-A.
1776 mm
x6
Use an app. 40 cm long board, that can be cut from the pallet.
A notice! Ventilation grille in the wall can be rotated left and right
Important! Keep your distance! Don’t leave a gap if the sauna is
made of thermowood.
Remove the screws. Remove the screws.
Use strap
Important! If you have a thermo wood sauna barrel,
please do not remove the screws.
Remove the screws.
remove
Attention! When assembling and maintaining/retightening the threaded rods, the
threaded rods must be oiled with oil
(W44 or Würth HPS1400). In this way,
damage to the threaded rod can be avoided and it can be
clamped more easily.
Remove the boards shown
Remove the boards shown
Extras assembly
min 50
/11a
Use a spirit level
Mark window opening
Follow the guidelines when cutting
Alt ernat ively can be used in t he back w all
Use a spirit level
SN! Install the window from the inside!
575
Use a spirit level
If you have an electric oven then attach det.23 directly to the wall (without det.22). Use screw 3×25
If necessary, cut the details to the appropriate size
Please pre-drill the 4mm holes before screwing.
Wooden wall
W= mm
35 36
23.
10
Door
Front Make sure that the door frame and the wall are on the same level!
25
10 Use a spirit level 26
26
27
27
25
Ø4
C
x10 4,0×50
Ø4
D x14
3,0×40
25
23-A.
Before processing the screws. Pre-drill the holes with a 4 mm drill bit.
Before processing the screws. Pre-drill the holes with a 4 mm drill bit.
Check also shingles installation manual inside the package
Bend the shingles over the side of the boards about 5 cm
Bend the shingles over the side of the boards about 5 cm
Extras assembly
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>