Ventev Hard Lid Ceiling Enclosure Instruction Manual
- September 19, 2024
- ventev
Table of Contents
- Hard Lid Ceiling Enclosure
- Product Information
- Specifications
- Product Usage Instructions
- Ventev Hard Lid Ceiling Enclosure Instructions
- Cisco Access Point Instructions
- Aruba Access Point Instructions (500 Series and Newer)
- Q: What is the weight capacity of the enclosure?
- Q: What type of screws should be used for mounting to
Hard Lid Ceiling Enclosure
“`html
Product Information
Specifications
- Product: Hard Lid Ceiling Enclosure
- Manufacturer: Ventev
- Model: Rev. 061924
- Weight Capacity: Supports AP of approximately 5 lbs
- Installation Requirement: 14 x 14 in. square hole in the
ceiling
Product Usage Instructions
Ventev Hard Lid Ceiling Enclosure Instructions
-
Cut a 14 x 14 in. square hole in the ceiling for recessing the
enclosure. -
Slide the enclosure into the hole and secure it to the ceiling
using appropriate hardware.
Cisco Access Point Instructions
-
Remove the door from the ceiling tile assembly.
-
Detach the AP Mounting Bracket from the door.
-
Insert the AP into the door and attach the cross bar.
-
Run the RJ45 cable into the enclosure tray and secure it with a
romex connector. -
Attach the door assembly to the base in the ceiling and connect
the RJ45 cable to AP. -
Close and lock the door.
Aruba Access Point Instructions (500 Series and Newer)
-
Remove the door from the ceiling tile assembly.
-
Remove the AP cross bar from the door stand offs.
-
Take off the factory mount from the AP.
-
Insert the AP into the door and attach the cross bar using
screws. -
Run the RJ45 cable into the enclosure tray and secure it with a
romex connector. -
Attach the door assembly to the base in the ceiling and connect
the RJ45 cable to AP. -
Close and lock the door.
FAQ
Q: What is the weight capacity of the enclosure?
A: The enclosure supports an Access Point of approximately 5
lbs.
Q: What type of screws should be used for mounting to
studs?
A: For studs, use #12 x 1.5 in. wood screws for securing the
enclosure to the ceiling.
“`
Installation Manual
Hard Lid Ceiling Enclosure
Rev. 061924
Ventev Hard Lid Ceiling Enclosure Instructions
Step 1
The enclosure comes with four ¼ in. holes spaced on 16 in. centers as shown.
It is recommended to center the holes with studs in the ceiling. Access Point
(AP) not included.
Step 2
A 14 x 14 in. square hole is required to be cut into the ceiling to allow the
enclosure to be recessed into the ceiling.
Enclosure Base
Step 3
Slide the enclosure into the hole and secure to the ceiling with the
appropriate hardware for the type of installation you are encountering. For
studs, use #12 x 1.5 in. wood screws. If mounting to other materials use the
correct wall anchors to support the enclosure plus the weight of the AP of
approximately 5 lbs.
2 11126 McCormick Road, Hunt Valley, MD 21031 |
800-851-4965 | sales@ventev.com |
ventevinfra.com | Rev. 061924
Cisco Access Point Instructions
Step 4
Remove the door from the ceiling tile assembly by pulling the heads of the two
spring pins that act as the door hinge.
Step 5
Remove the four screws or nuts that hold the AP Mounting Bracket to the door.
Step 6
Place AP in door from the front side. Slide the cross bar onto the AP mounting
feet from the back side.
Step 7
Attach the cross bar to the door with four screws or nuts.
Step 8
Run the RJ 45 cable into the large hole in the tray of the enclosure and
secure the wire with the romex connector.
Step 9
Attach door assembly to installed base in the ceiling and attach RJ45 cable to
AP.
Step 10
Close the door and lock.
Aruba Access Point Instructions (500 Series and Newer)
Step 4
Remove the door from the ceiling tile assembly by pulling the heads of the two
spring pins that act as the door hinge.
Step 5
Remove the two screws that hold the AP cross bar to the door stand offs.
Step 6
Remove the black factory mount from the AP and retain the two screws.
Step 7
Place AP in door from the front side. Screw the cross bar onto the AP from the
back side using the screws that were removed from the AP.
Step 8
Attach the cross bar to the door with the two screws from step five.
Step 9
Run the RJ 45 cable into the large hole in the tray of the enclosure and
secure the wire with the romex connector.
Step 10
Attach door assembly to installed base in the ceiling and attach RJ45 cable to
AP.
Step 11
Close the door and lock.
11126 McCormick Road, Hunt Valley, MD 21031 | 800-851-4965 | sales@ventev.com | ventevinfra.com | Rev. 061924 3
11126 McCormick Road, Hunt Valley, MD 21031
800-851-4965 sales@ventev.com
ventevinfra.com
Rev. 061924
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>