AQMD South Coast Air Quality Management District Instructions
- September 17, 2024
- AQMD
Table of Contents
INSTRUCTIONS FOR THE ASBESTOS – DEMOLITION NOTIFICATION FORM
Coast Air Quality Management District
For Homeowners submitting 14-Calender Day Demolition Notifications ONLY
Contractors use the Rule 1403 Asbestos Notifications Web
Application
NOTIFICATION TYPE: Check ORIGINAL for first time Notification. Check
REVISION DATES to change the START or END project schedule dates.
REVISIONs are for updating information on Notifications in which the project
END date has not expired. Revision of site location address requires a new
Notification. Check CANCELLATION to cancel a prior Notification. Use REVISION
OTHER for updating other information COMPLETED BY: Type the name and phone
number of the person completing the Notification form, the date, check number,
fee amount.
SITE INFORMATION: Provide detailed information about the site location and/or
building(s) where the demolition is to occur, including a cross street.
DESCRIBE WORK AND LOCATION by providing the specific work and areas within the
facility or structure. Examples: demo Monroe Hall, demo kitchen of Bldg. #2.
SITE OWNER: Name, physical address and phone number of the site legal
owner.
PROJECT DATES: The actual START and END dates and work shifts of the
Demolition project. Changes of project scheduled dates stated in ORIGINAL or
previous Notifications require a Revision to the previous Notification.
*BUILDING SIZE IN SQ FT: Provide the size of the structure in square
feet. For structure Demolition, the fee is based on the structure size.
REQUIRED BUILDING INFORMATION: Check a YES or NO answer for each
question.
Asbestos Surveys performed by Certified Asbestos Consultants are required
prior to all demolitions. Asbestos must be removed prior to ALL demolitions.
State when and who removed the asbestos. Demolitions require proof of prior
asbestos survey and removal, and the Structure Size to calculate the
Notification fee. For partial demolitions provide the size of the area to be
demolished in square feet.
CONTINGENCY PLAN: Check the actions to be followed if unexpected asbestos
is found or non-friable asbestos is rendered friable.
WASTE TRANSPORT: Name the company transporting the demolition waste to a
landfill.
LANDFILL: Name and address of the landfill where the demolition waste
will be sent.
SURVEY REQUIREMENT: Asbestos surveys are required prior to any
demolition. All asbestos must be removed prior to structure demolition.
NOTIFICATION REQUIREMENTS: Postmark Notifications 10 work days prior to
starting any demolition. Notifications shall be filled, signed, paid, and
submitted. Notifications without signature(s) require a revision.
FEE REQUIREMENT: Rule 301(o) requires all Notifications to be
submitted with appropriate fees. Fees are per Notification and are not
refundable.
Notifications submitted without appropriate fees may be returned, deemed
incomplete, and referred to the compliance unit for follow-up. Projects
conducted without a valid Notification are subject to local and federal
enforcement. Cancellations of Notifications are exempt from fees – other
requirements mayapply.
REVISIONS TO THE NOTIFICATION: Update the Notifications as necessary and
explain the reason for the revision. For Revision Amount Notifications state
the amount in the previous Notification. The Revision Amount fee is the
difference between the new Project Size Fee category and the Original Project
Size Fee category. Revisions increasing the demolition size but remaining in
the same amount/size category stated in a previous Notification(s) requires
only a revision fee. Increase in amount/size category requires a revision fee
and a fee for the difference in amount between the new Project Size Fee
Category and the original Project Size category. Fees are per Notification and
multiple service charge fees may apply. Notifications expire on the project
schedule End Date and cannot be revised after the expired End Date.
REVISIONS TO THE NOTIFICATION: Update the Notifications as necessary and
explain the reason for the revision. For Revision Amount Notifications state
the amount in the previous Notification. The Revision Amount fee is the
difference between the new Project Size Fee category and the Original Project
Size Fee category. Revisions increasing the demolition size but remaining in
the same amount/size category stated in a previous Notification(s) requires
only a revision fee. Increase in amount/size category requires a revision fee
and a fee for the difference in amount between the new Project Size Fee
Category and the original Project Size category. Fees are per Notification and
multiple service charge fees may apply. Notifications expire on the project
schedule End Date and cannot be revised after the expired End Date.
MAILING REQUIREMENT: Postmark/Mail the Notification and fee to SCAQMD,
P.O. Box 55641, LOS ANGELES, CA 90074-5641. Mailing saves time, money and
reduces traffic and air pollution.
DEMOLITIONS require 4 PRIOR steps 1-Asbestos Survey, 2-Asbestos Removal,
3-South Coast AQMD Notification, and 4-Building & Safety demolition permit.
ALL demolitions require a Notification by the contractor/operator performing
the demolition. Demolition is defined as the wrecking or taking out of one or
more load-supporting structural member(s) of a structure or the intentional
burning of a structure.
Dismantling of partitions and installation of windows and doors through load-
supporting walls without asbestos is exempt from Notification.
Keep three (3) copies of this Notification Form for your records, to post
at the worksite, and to obtain a city demolition permit. See California
Health and Safety Code
19827.5
requiring that you provide a copy of this demolition Notification form to
Building and Safety before issuance of a demolition permit. This law does not
require proof of receipt or approval by South Coast AQMD. Mail the signed
original Notification form, fee and any attachments to SCAQMD, P.O. Box
55641, LOS ANGELES, CA 90074-5641. Mailing saves time, money, gasoline, and
reduces traffic, energy use and air pollution. Los Angeles City, Palm Springs
Fire Department, and Cal-OSHA require a separate Notification. For questions
call the asbestos HOTLINE at
909-396-2336.
Notification Form, instructions, and Rule
1403 can be found at
http://www.aqmd.gov/comply/asbestos/asbestos.html
Rule 1403 and NESHAP Asbestos Notification Form Instruction Sheet
(1403 instructions, revised 6/2024)
Read User Manual Online (PDF format)