Supplier Requirements Manual
5020 Ash Grove Drive Springfield, Illinois 62711
Toll Free Ph. 800-637-8606
Direct Ph. 217-529-6601
BUNN-O-MATIC
Supplier Requirements Manual
Scope
Applies to suppliers of production materials and services.
Purpose
- Define expectations and procedures for approval of production parts and services.
- Define quality assurance requirements.
- Define supplier performance metrics.
- Describe the supplier qualification process.
Definitions
- Quality – Conformance to contractual requirements.
- Temporary Change Request – If approved, the supplier may ship product which does not conform to formally approved documentation. A formal change to approved documentation is optional, depending on the terms of the approved temporary change request.
- Permanent Change Request – If approved, affected documentation must be formally updated. If the Supplier must ship prior to formal release of updated documentation, an approved waiver request is required.
General Requirements
Suppliers must:
- Supply material that conforms to documented requirements.
- Provide evidence of conformance when requested.
- Provide timely responses to non-conformances with effective corrective actions.
- Permit audits to verify capability.
- Communicate any change or event that may affect product quality, reliability or business relations.
Suppliers should have a quality system that:
- Is capable of third party certification
- Emphasizes prevention of non-conformance rather than relying on inspection to achieve zero defects.
Supplier Code of Conduct
Bunn-O-Matic’s Supplier Code of Conduct helps us select business partners who
follow workplace standards and business practices that are consistent with our
company’s values. The supplier is fully responsible for ensuring compliance by
any such sub-contractor(s) as if it were the supplier itself.
These requirements are applicable to all Bunn-O-Matic suppliers as well as any
sub-contractor(s) providing goods or services to the supplier:
- General Principle: Supplier plants shall operate in full compliance with the laws of their respective countries and with all other applicable laws, rules, and regulations.
- Environment: Environmental sustainability is of great importance to Bunn-O-Matic. At the minimum, Supplier plants must comply with all applicable environmental laws and regulations and operate in a manner that minimizes the impact to our environment. In addition, Suppliers should demonstrate a commitment to managing their environmental impact by implementing a system or plan for continuous improvement in their environmental performance.
- Child Labor: Suppliers shall employ only workers who meet the applicable minimum legal age requirement. Suppliers must also comply with all other applicable child labor laws.
- Forced Labor: Suppliers shall not use any indentured or forced labor, slavery or servitude.
- Wages and Hours: Supplier plants shall set working hours, wages and over-time pay in compliance with all applicable laws. Workers shall be paid at least the minimum legal wage or a wage that meets local industry standards, whichever is greater.
- Discrimination: Suppliers shall employ workers on the basis of their ability to do the job, not on the basis of their personal characteristics or beliefs (including race, color, gender, nationality, and religion, and age, maternity or marital status).
- Gift and Gratuity Policy: The offering or acceptance of kickbacks, bribes and other illegal payments subverts the very essence of competition and erodes the moral fiber of those involved. These include gratuities (i.e., anything of value) offered to Bunn-O-Matic employees. Such activities are not condoned and will not be tolerated. Bunn-O-Matic also prohibits the offer or acceptance of gifts or gratuities that the recipient likely would consider to be of substantial value. Any supplier that violates this Gift and Gratuity Policy risks immediate loss of all existing and future Bunn-O-Matic business.
Bunn-O-Matic reserves the right to audit supplier sub-contractors for
compliance. The supplier shall accommodate Bunn-O-Matic’s audit as required.
In the event of non-compliance with this Code of Supplier Conduct, The
supplier must provide a written corrective action plan to Bunn-O-Matic
Purchasing. If the supplier fails to meet the corrective action plan
commitment, Bunn-O-Matic may terminate the business relationship, including
suspension of future orders and potential termination of current production.
Supplier Screening and Qualification
The Bunn-O-Matic supplier selection process is based on a desire for long term superior supplier performance and must ensure that selected suppliers are capable of meeting quality, availability, value and continuous improvement objectives. At Bunn-O-Matic discretion, the supplier may be required to participate in this process.
Supplier Screening
The Bunn-O-Matic screening process is based on the following supplier
considerations:
- Quality performance defined as conformance to contractual requirements. The Quality Score is a composite of the number of nonconformance reports and PPM (Parts per million defects).
- Value performance is comprised of the value improvement activities and purchase order terms and price variance performance.
- Availability performance based on 100% on-time expectation. The composite score for availability is comprised of DSI (Days Sales of Inventory), lead time, and on time deliveries.
- Reliability engineering process to mitigate and eliminate risk to achieve the duration or probability of failure-free product performance under stated conditions.
- Suppliers of food contact packaging raw materials for filter process may be requested to complete pre-qualification questionnaire.
- Registration to an industry sector quality system such as ISO-9000.
- Product complexity/compatibility with the supplier
- Availability of capital to produce product under evaluation
- Financial strength for future growth and investment
- Ability to provide inspection, testing and design analysis as required
- Support of “state of the art” equipment and processing
- Technical and management strength
- Strategic importance of the Bunn-O-Matic product to supplier business strategy
- History of competitiveness in the product group under evaluation
- Ability to manage prototype/pre-production activities
- Diversification in markets and products to allow balance
- System to manage logistics
- System to manage language barriers
- Effective use of continuous improvement techniques
- Adequate process automation and error proofing
Follow-up information and corrective actions may be requested.
On-Site Assessment
At Bunn-O-Matic’s discretion an on-site review of key areas such as
procurement, engineering, manufacturing, and quality may be performed to
better evaluate the effectiveness of the supplier’s business, manufacturing
and quality & reliability systems.
Self-Assessment
The supplier may be asked to complete a self-assessment and provide any
necessary supporting documents to Bunn-O-Matic.
Assessment Results
When system deficiencies are identified, a response time may be provided for
the supplier to define corresponding corrective actions. At Bunn-O-Matic’s
sole discretion the qualification process may be terminated at any time.
Production Part Approval Process (PPAP)
Bunn-O-Matic may request suppliers to utilize the PPAP (level 3 as the
default – Reference 14.1 for electronic warrant worksheet. Note: PPAP’s, FAI
for purchased shelf item parts may be approved internally at Bunn by
conducting the FAI inspection and confirming manufacturer’s part number via
Certificate of Compliance (CofC form) or technical data sheet. PPAP parts must
be from production tooling, production processes and production employees and
may be required in the following situations:
- New part
- Correction of a discrepancy/resubmission.
- Modifications due to a documentation or materials change.
- Alternate construction or materials from previously approved parts.
- Produced from new or modified tools, dies, molds, etc.
- Changes to process, method, or facility of manufacture.
- Change to a source of subcontracted parts, materials, or services.
At Bunn-O-Matic’s sole discretion the supplier may be required to submit the following items for approval prior to production shipments:
Early Production Containment (GP-12) – The purpose of GP-12 is to document the supplier’s efforts to gain control of its processes during start-up and acceleration so that any quality issues that may arise are quickly identified and corrected at the supplier’s location prior to shipping production parts to Bunn-O-Matic. GP-12 Early Production Containment requires a Pre-Launch Control Plan, a significant enhancement to the supplier’s production control plan, which will raise the confidence level to ensure that all products shipped initially, will meet customer expectations and requirements. The Pre-Launch Control Plan will also serve to validate the production control plan. The Pre- Launch Control Plan should take into consideration all known critical conditions of the part, as well as potential areas of concern identified during PPAP. When GP-12 is requested, the supplier should do the following:
- Develop a Pre-Launch Control Plan consisting of additional control, inspection audits and testing to identify non-conformances during the production process. Additional controls could include: Increased frequency/sample size of receiving, process, and or shipping inspections. Mandated sub-supplier containment and or sub-supplier support/audits; addition of inspection/control items; increased verification of label accuracy; enhancement of process controls such as error proofing; error proofing validation through introduction of known defects; increased involvement and visibility of top management.
- Prompt implementation of containment/correction when non-conformances are discovered.
- Pre-Launch Control Plan is over and above the Production Control Plan and serves to validate the Production Control Plan. The Pre-Launch Control Plan should be utilized for the first 500 production units or a duration specified by Bunn-O-Matic. Non-conformances identified during the first 500 units, should continue to be 100% inspected at the Supplier’s location until the process demonstrates capability of 1.33 cpk minimum.
- The supplier is eligible to exit and discontinue the Pre-Launch Control Plan on their own accord after 500 production units or the predefined duration has been met and no discrepancies or customer NCMR’s (Nonconforming Material Reports) issued during the Pre-Launch phase. In the event the self exit criteria cannot be met, the GP-12 Pre-Launch Control Plan must remain in place until process control and capabilities have proven effective and the Production Control Plan is validated.
- 100% first piece inspection with measurement method and results to the Bunn-O-Matic drawing for 5 parts (reference 14.0 for supplier submission forms). For multiple cavity tools, dimensional results will be needed from at least 1 part per cavity, material certifications (CofC), process control plan.
- Laboratory validation of material specifications including coating, plating, paint, salt spray, special processes and performance test results, certificate of conformance (CofC).
- SPC charts, process capability studies for critical features achieving a Cpk of 1.33 or greater, gage R&R studies, process flow charts, and FMEAs. Purchasing and/or Supplier Quality will notify the Supplier of non-conformances. Failure to meet documented requirements will result in rejection. Supplier may be charged a $35 administration fee per non-conforming receipt plus $35/hour for any additional time, labor or material costs. The Supplier must take immediate corrective action.
- Bunn-O-Matic uses a zero-defect C=0 sample plan where 1 defect rejects the entire lot. Rejected material disposition will be at Bunn-O-Matic’s sole discretion in one of or in a combination of the following methods:
- Return for rework or scrap.
- Supplier will rework or sort at Bunn-O-Matic at supplier’s expense.
- Bunn-O-Matic will rework or sort.
- Return for full refund or credit of the price actually paid for any such non-conforming goods.
Supplier should refer to the Purchase Order Terms and Conditions.
Supplier Corrective Actions Requests
When notified of a non-conforming receipt the Supplier must take immediate
corrective action. The supplier is expected to provide an initial response via
e-mail or fax to Purchasing within 24 hours.
Root-cause analysis and permanent corrective action should be communicated to
Supplier Quality Engineer or designee within 10 working days (see end of this
document for reference form). Extension date may be approved through Supplier
Quality Engineer or designee written communication. Documentation should
include:
- Immediate short-term corrective action with effective date.
- Affected shipments with date, run, and/or lot numbers.
- Root cause with investigation details.
- Long-term corrective action with effective date.
- Date, run, and/or lot number of material produced after corrective action.
Change Requests
Once a non-conforming shipment enters the Bunn-O-Matic receiving/inspection
process, the Supplier performance record is negatively affected and will not
be updated if a change request is later approved.
At the sole discretion of Bunn-O-Matic it may be necessary to resubmit the
part for approval when a change is made.
Permanent change request
The supplier may request a permanent change to a process, material, or design
of a part by submitting a change request to Bunn-O-Matic Purchasing.
Temporary change request
The supplier may request a temporary change by communicating directly with
their Bunn-O-Matic Purchasing contact.
A temporary change shall typically be limited to a production run. The
supplier may request a temporary change to a process, material, or design of a
part in order to:
- Ship a part that varies from a requirement that is currently approved.
- Ship a part that was produced on a process or work center that is different from what is currently approved.
A copy of the approved temporary change request must accompany any affect shipment. Under no circumstances is a supplier to ship known non-conforming material to Bunn-O-Matic without prior written authorization from the Bunn-O-Matic Purchasing department.
Lot Control and Traceability
The supplier must record and retain records to enable traceability and
retrieval of material. Material lots must be identified with part number,
revision and other pertinent information. When possible the lot number/date
code should be marked on the part itself. Additional requirements may be
specified at Bunn-O-Matic discretion.
Verification of Subcontracted Product
The supplier shall allow Bunn-O-Matic employees entrance into the
supplier’s facility in order to verify product conformance. Bunn-O-Matic
purchasing will coordinate visit schedules. In the event of a major quality
concern, the supplier shall accommodate an immediate visit during normal
business hours.
Supplier Performance
The following performance data is tracked on a periodic basis and may be
shared with the Supplier as needed. When performance is not acceptable the
Supplier must communicate and implement a corrective action plan.
Supplier Performance Metrics:
- PPM
- On-time delivery
- Price of Non-Conformance (PONC)
Supplier Warrant
Supplier Inspection Report Form
Supplier Corrective Action Request Form
Supplier Process Change Request Form
Certificate of Conformance Form for Custom Part
Certificate of Compliance for Non-Custom Part