AVOLTIK 3335071 Solar Panel Halterung Installation Guide
- September 11, 2024
- AVOLTIK
Table of Contents
AVOLTIK 3335071 Solar Panel Halterung
Product Information
Specifications:
- Manufacturer: Naassan Com GmbH
- Address: Johanniskirchstr. 90, 45329 Essen
- Contact: E-Mail: kundenservice@pv-insel.de
Product Usage Instructions
Installation Steps
Rail Installation:
Install EPDM rubber onto the rail. Locate the rail position as shown in the
drawing and mark it after placing it. Connect the remaining rails through rail
connectors, place them according to the drawing, and tighten the bolts.
Front/Rear Leg Installation:
Place the front leg as shown in the drawing, fix it with M8*25 bolts and
clamps, then adjust and lock the corresponding bolts. Repeat the same for the
rear leg installation.
Ballast Installation:
Place the ballast plate on the rail as indicated in the drawing. Place the
ballast on the ballast plate and repeat the steps to complete the ballast
placement.
Panel Installation:
Place the panel on the front leg slot and the slope of the rear leg.
Install bottom clamps by pressing them into the card slot, locking the bolt,
and pressing the panel tightly. Follow similar steps for end clamp
installation and inter clamp installation.
Complete Installation:
Complete the installation process by following the above steps diligently.
FAQ
What should I do if I encounter difficulties during installation?
If you face any challenges during installation, please refer to the manual
carefully or contact our customer service at kundenservice@pv-insel.de for
assistance.
Locate rail position
-
Install EPDM rubber onto the rail
-
Locate the rail position as the drawing shows, and mark the rail position after placing it
-
Connect the remaining rails through rail connector and place them according to the location in the drawing, then tighten the bolts
-
As shown in the picture after installation
Install front/rear leg
-
Place the front leg as the drawing shows,fix the front leg with M8*25 bolts and clamps, then adjust and lock the corresponding bolts
-
Place the rear leg as the drawing shows,fix the rear leg with M8*25 bolts and clamps, then adjust and lock the corresponding bolts
-
Repeat the above steps to install all front and rear legs making sure that the top surface of the front/rear legs in the same row are at the same height to ensure the normal installa-tion of panels
Install ballast
-
Place the ballast plate on the rail as the drawing shows
-
Place the ballast on the ballast plate
-
Repeat the above steps to complete the ballast placement
Install panel
-
Place the panel on the front leg slot and the slope of the rear leg
-
Bottom clamp installation: press the bottom clamp into the card slot as the picture shows, lock the bolt, and press the panel tightly
-
End clamp installation: press the end clamp into the card slot as the picture shows, lock the bolt, and press the panel tightly
-
Inter clamp installation: place the panels in sequence according to the drawing as the picture shows, and place an inter clamp between two panels, then tighten the bolts
-
The remaining end clamp installation: place the panels in sequence according to the drawing as the picture shows, on the other side of the same row of panels,repeat steps 4.2/4.3
Complete installation
ABOUT COMPANY
- Naassan Com GmbH Johanniskirchstr. 90
- 45329 Essen
- Bei Fragen erreichen Sie uns unter
- E-Mail: kundenservice@pv-insel.de
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>