AVOLTIK Solar Panel Mount Installation Guide
- July 9, 2024
- AVOLTIK
Table of Contents
AVOLTIK Solar Panel Mount
Product Information
- Specifications:
- Manufacturer: Naassan Com GmbH
- Address: Johanniskirchstr. 90, 45329 Essen
- Contact Email: kundenservice@pv-insel.de.
- Installation: Ballast system in east and west direction
Product Usage Instructions
- Rail Installation
- Install EPDM rubber onto the rail.
- Locate the rail position as per the drawing, mark the position, and connect rails through connectors.
- Tighten bolts to secure the rails in place.
- Front/Rear Leg Installation
- Fix the front leg with M8*25 bolts and clamps, and adjust and lock bolts.
- Fix the rear leg with M8*25 bolts and clamps, and adjust and lock bolts.
- Ballast Installation
- Place the ballast plate on the rail as per the drawing.
- Place ballast on the ballast plate and repeat for complete placement.
- Panel Installation
- Place panel on front leg slot and rear leg slope.
- Install the bottom clamp by pressing into the card slot, locking the bolt, and pressing the panel tightly.
- Install the end clamp by pressing into the card slot, locking the bolt, and pressing the panel tightly.
- Install inter clamp between panels and tighten bolts.
FAQs
- Q: How should I ensure the stability of the installation?
- A: Make sure that the top surfaces of the front/rear legs in the same row are at the same height for normal panel installation.
Locate rail position
- Install EPDM rubber onto the rail
- Locate the rail position as the drawing shows, and mark the rail position after placing it
- Connect the remaining rails through the rail connector and place them according to the location in the drawing, then tighten the bolts
- As shown in the picture after the installation
Install front/rear leg
- Place the front leg as the drawing shows, fix the front leg with M8*25 bolts and clamps, then adjust and lock the corresponding bolts
- Place the rear leg as the drawing shows, fix the rear leg with M8*25 bolts and clamps, then adjust and lock the corresponding bolts
- Repeat the above steps to install all front and rear legs making sure that the top surface of the front/rear legs in the same row are at the same height to ensure the normal installation of panels
Install ballast
- Place the ballast plate on the rail as the drawing shows
- Place the ballast on the ballast plate
- Repeat the above steps to complete the ballast placement
Install panel
- Place the panel on the front leg slot and the slope of the rear leg
- Bottom clamp installation: press the bottom clamp into the card slot as the picture shows, lock the bolt, and press the panel tightly
- End clamp installation: press the end clamp into the card slot as the picture shows, lock the bolt, and press the panel tightly
- Inter clamp installation: place the panels in sequence according to the drawing as the picture shows, and place an inter clamp between two panels, then tighten the bolts
- The remaining end clamp installation: place the panels in sequence according to the drawing as the picture shows, on the other side of the same row of panels, repeat steps 4.2/4.3
Complete installation
CONTACT
- Naassan Com GmbH Johanniskirchstr. 90 45329 Essen
- Bei Fragen erreichen Sie uns unter
- E-Mail: kundenservice@pv-insel.de.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>