Specifications

  • Product: BIG MOUTH LIT KIT Quad and Dual Ram Air Intake
  • Vehicle Compatibility: 2015-2020 Ford F-150
  • Installation Time: Approximately 2 hours

Product Usage Instructions

Kit Contents
Before starting the installation, ensure you have received all the necessary components based on your kit type (QUAD or DUAL).
Refer to the provided list of contents in the manual.

Stock Components Removal
Prior to installation, it is recommended to remove the top 4 AGS flaps to allow clearance for the BIG MOUTH intakes. Follow the instructions on how to remove these components as detailed in the manual.

Cowl Templates
For 2015-2017 models, use templates A, B, C, and D. For 2018-2020 models, use templates A, B, C, and D. Refer to the provided diagrams for proper placement of the templates on your vehicle’s grille.

AGS Simulator Installation

  1. Insert a 60mm long M3 bolt into the driver side D splined shaft.
  2. Thread the bolt into the other splined shafts through the AGS motor to create a secure connection.
  3. Ensure the ‘ear’ of the splined shaft faces up away from the grille, with both ears pointing in the same direction.

General Installation Steps

  1. Begin by assembling the LIT KIT BIG MOUTH as per the provided instructions.
  2. Use the drill templates provided to mark drilling locations accurately.
  3. Securely attach all components using the screws and cable clips provided in the kit.
  4. Properly connect the cables and switches according to the wiring diagram.
  5. Test the functionality of the RGBW controller and ensure all connections are secure before completing the installation.

FAQ

  1. Q: How long does it take to install the BIG MOUTH LIT KIT?
    A: The installation process typically takes about 2 hours with basic hand tools.

  2. Q: Can I remove the AGS flaps myself?
    A: Yes, you can remove the top 4 AGS flaps to accommodate the BIG MOUTH intakes. Follow the instructions provided in the manual for proper removal.

  3. Q: Do I need any special tools for installation?
    A: Basic hand tools are required for installation. Ensure you have these tools available before starting the installation process.

2015-2017 F150 BIG MOUTH Lit Kit – Contents

Please review this document before attempting installation.
You will need basic hand tools and about 2 hours of installation time.
Please review the table below and make sure you have received the kit contents.

Kit Contents (QUAD Kit) Qty
M5 x 14mm Button Head Screw 12
Drill Templates (A+B+C+D) 4
M5 x 25mm Cap Screw 2
M3 x 60mm Cap Screw 1
AGS Simulator Spline Shaft “D” 1
AGS Simulator Spline Shaft “P” 1
Diode Dynamics RGBW Controller 1
Positive Cable w/ In-Line Fuse 1
Power Cable w/ Pigtail Connector 1
Switch 1
Switch Ground Cable w/ Pigtail 1
Cable Clips 4
8″ Zip Ties 8
Assembled LIT KIT BIG MOUTH 1
Kit Contents (DUAL Kit) Qty
M5 x 14mm Button Head Screw 8
Drill Templates (A+B) 2
M5 x 25mm Cap Screw 2
M3 x 60mm Cap Screw 1
AGS Simulator Spline Shaft “D” 1
AGS Simulator Spline Shaft “P” 1
Diode Dynamics RGBW Controller 1
Positive Cable w/ In-Line Fuse 1
Power Cable w/ Pigtail Connector 1
Switch 1
Switch Ground Cable w/ Pigtail 1
Cable Clips 4
8″ Zip Ties 8
Assembled LIT KIT BIG MOUTH 1

2018-2020 F150 BIG MOUTH Lit Kit – Contents
Please review this document before attempting installation.
You will need basic hand tools and about 2 hours of installation time.
Please review the table below and make sure you have received the kit contents.

Kit Contents (QUAD Kit) Qty
M5 x 14mm Button Head Screw 12
Drill Templates (A+B+C+D) 4
M5 x 25mm Cap Screw 2
M3 x 60mm Cap Screw 1
AGS Simulator Spline Shaft “D” 1
AGS Simulator Spline Shaft “P” 1
Diode Dynamics RGBW Controller 1
Positive Cable w/ In-Line Fuse 1
Power Cable w/ Pigtail Connector 1
Switch 1
Switch Ground Cable w/ Pigtail 1
Cable Clips 4
8″ Zip Ties 8
Assembled LIT KIT BIG MOUTH 1
Kit Contents (DUAL Kit) Qty
M5 x 14mm Button Head Screw 8
Drill Templates (A+B) 2
M5 x 25mm Cap Screw 2
M3 x 60mm Cap Screw 1
AGS Simulator Spline Shaft “D” 1
AGS Simulator Spline Shaft “P” 1
Diode Dynamics RGBW Controller 1
Positive Cable w/ In-Line Fuse 1
Power Cable w/ Pigtail Connector 1
Switch 1
Switch Ground Cable w/ Pigtail 1
Cable Clips 4
8″ Zip Ties 8
Assembled LIT KIT BIG MOUTH 1

Stock Components Removal
Use Google or online forums to search for best practices when removing the front bumper.

2015-2017 Cowl Templates

After removal of the grille/cowl assembly, you will need to use the supplied templates to drill ¼” holes in the locations shown. (Dual kits only have two templates).

2018-2020 Cowl Templates
After removal of the grille/cowl assembly, you will need to use the supplied templates to drill ¼” holes in the locations shown. (Dual kits only have two templates).

Stock Components Removal
Remove the top 4 AGS flaps to allow clearance for the BIG MOUTH intakes. You can flex these flaps at their center, and then bend them outward to unhook the engagement pegs. See below.

AGS Simulator

This assembly was engineered and tested to allow the AGS to continue to function, which will prevent a soft code from showing up on the dash for some 13th gen F150 models.

AGS Simulator
Use Allen key to fasten the sandwich together, tighten until snug, do not over-torque.

AGS Simulator
Finalize the assembly by screwing the 5mm bolt into the ears, ensure they bottom out and go through the AGS peg-holes as shown. (You can manually move the AGS to align the peg holes).

AGS Simulator Testing
Once the AGS Simulator install is complete, temporarily reinstall the bumper (no need to fully fasten yet), reconnect the AGS motor, turn your car on and allow the AGS system to perform its initiation cycle. If your flaps successfully open and close without interference, the install is successful and the AGS is fully functional.

Install BIG MOUTH Ram Air

From underneath the cowl openings, align the BIG MOUTH ram air intakes with the holes drilled, and fasten with supplied button head screws. For a ‘18-’20 Dual Kit, use the provided spacer on the lowest outer ear to avoid stressing the Big Mouth.

Wiring Harness

Wiring Harness Schematic

LED Wire Routing
Once the BIG MOUTH intakes are installed, you will need to practice patience and neatness to keep the LED wires from snagging on the AGS assembly. THIS IS VERY
IMPORTANT. Do not allow the wires to cross through the AGS assembly brackets or flaps, this will cause the flaps to bind and not open or close properly.

2015-2017 F-150 LED Controller Placement
After the LED power wires are routed towards the center of the AGS assembly, you may mount the controller at the top of the shroud, clean a flat surface with a towel and use the double-sided tape to fasten it firmly in place, ensure the LED power wires are neatly packed together and zip tied AWAY from the AGS and the hood latch.

2018-2020 F-150 LED Controller Placement
After the LED power wires are routed towards the center of the AGS assembly, you may mount the controller at the top of the shroud, using a zip tie as shown, ensure the LED power wires are neatly packed together and zip tied AWAY from the AGS and the hood latch.

Grounding and Power

Good grounding for the controller is important, bad grounds will lead to controller instability and/or failure. Ensure the ground lugs are tightened down and the surfaces are cleaned prior to grounding. Only use chassis/metal grounds or the battery ground. Route the power harness as shown, use zip ties.

Grounding and Power
Bundle excess wire with zip ties, route power through the switch using the wiring diagram on slide 13, follow it carefully and ensure the wiring is neat.

Power can be tapped out of the battery as shown. Use the small ground wire to ground the power switch at the battery negative post. Tuck the wire bundle away.

For both 2015-2017 and 2018-2020 F-150s, ensure that the hood latch is clear of any wire snags. Bundle the wires together with slack left, and zip tie the bundles down and AWAY from the hood latch.

For both 2015-2017 and 2018-2020 F-150s, ensure that the hood latch is clear of any wire snags. Bundle the wires together with slack left, and zip tie the bundles down and AWAY from the hood latch.

Phone App

Download the Diode Dynamics app and connect via Bluetooth.

How to connect to the app:

  1. After installing the app from the app store, open the app on your device.
  2. Cycle the power to the Bluetooth controller by unplugging it and plugging it back in or flick the power switch and wait a few seconds, then turn it back on.
  3. Wait for the app to detect the controller, it will pop up on the app screen as a Bluetooth controller. If necessary, cycle the power once more to refresh the controller.
  4. Once the controller shows up on the app, click it and connect. You have 30 seconds to select the controller once it shows up on the app. After 30 second you will need to refresh again to detect the controller again.
  5. Note that if you mounted your controller behind a lot of metal components, this may degrade the signal and range.

Finalize

You can make an adjustment to the BIG MOUTHs to ensure they are level. Place bumper on the vehicle however do not fasten it yet, inspect visually for alignment and level of your BIG MOUTH intakes. If you need more adjustment, go back and drill bigger holes in the shroud to allow play room, then tighten as needed. You may add shims between the cowl shroud and the BIG MOUTH fastening points to help with leveling for your particular vehicle.

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

VELOSSA TECH User Manuals

Related Manuals