Shelti LBA-0 Series Coin Operated 88 Inch Bayside Pool Table Instruction Manual

August 17, 2024
Shelti

Shelti LBA-0 Series Coin Operated 88 Inch Bayside Pool Table

Shelti-LBA-0-Series-Coin-Operated-88-Inch-Bayside-Pool-Table-
product

Assembly Instructions

Thank you for purchasing a Shelti product. All of us at Shelti want you to be completely satisfied with your Coin Pool Table, so feel free to contact us for help with the assembly of your product, Shelti parts, or other information you may require.

Tools Required: 5/16” Wrench or Socket Level

Description Part Number Quantity
Shelti Pool Table Leg Box LBA-0 1
Pool Table Leg Assembly PX-LAA-0 4
Pool Table Leg 201-0053-0 4
Square Base T-Nut 1 3/8”x1 3/8” 305-0010-0 4
#8 x 1 1/4” Pan Phil Tap Screw 304-0002-0 4
Leg Leveler – Brushed Aluminum 204-0035-0 4
Leg Bolts – 5/16-18×1 1/2” 301-0020-0 12
Ball Set – With Magnet Cue Ball 213-0001-0 1
Ball Rack Triangle 201-0060-0 1
Pool Table Chalk 210-0047-0 6
Pool Table Warranty Card 210-0063-0 1
8˚ Coin Pool Table Assembly Instructions 210-0158-0 1
  • Step #1 —Place the pool table box on its side, remove the banding and the top of the box.Shelti-LBA-0-Series-Coin-Operated-88-Inch-Bayside-Pool-Table-fig-1
  • Step #2 —Slide the table partially out of the box, slightly tip the table and remove the bottom of the box and the fillers.
  • Step #3 —Attach the legs to the bottom of the pool table using three 5/16”-18 leg bolts per leg. Make sure that the leg levelers are screwed all of the way into the leg and slowly rotate the table over onto its four legs.
  • Step #4 —Rough level the pool table by placing a level across, lengthwise, and diagonally into the four corners and raise or lower the appropriate leg leveler. Final level the pool table by dropping a ball onto the nose of the cushion rail and watch the drift of the ball as it comes to a stop. Raise or lower the appropriate leg leveler until the ball rolls true.Shelti-LBA-0-Series-Coin-Operated-88-Inch-Bayside-Pool-Table-fig-3
  • Step #5 —Complete the warranty card and return the self-mailing Registration Form to Shelti in the event of upgrades and/or product recalls.

Maintenance Adjustments

Top Rail Molding Removal / Installation

  • Step #1 —Remove the top rail molding screws.
  • Step #2 —Slide the molding all of the way in one direction.Shelti-LBA-0-Series-Coin-Operated-88-Inch-Bayside-Pool-Table-fig-4

Cue Ball Separator Adjustment

Shelti-LBA-0-Series-Coin-Operated-88-Inch-Bayside-Pool-Table-
fig-5

Ball Trap Removal & Upper Ball Wedge Replacement

Shelti-LBA-0-Series-Coin-Operated-88-Inch-Bayside-Pool-Table-
fig-6

Die Cast Corner Removal / Installation

Shelti-LBA-0-Series-Coin-Operated-88-Inch-Bayside-Pool-Table-
fig-7

Ball Trap Cam Removal / Adjustments

Shelti-LBA-0-Series-Coin-Operated-88-Inch-Bayside-Pool-Table-
fig-8Shelti-LBA-0-Series-Coin-
Operated-88-Inch-Bayside-Pool-Table-fig-9

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals