HERCULES 3 Bar Footing Stands User Guide

August 11, 2024
Hercules

HERCULES 3 Bar Footing Stands

Product Information

Specifications

  • Product: 2-Bar & 3-Bar Footing Stands
  • Recommended Placement: Every 4 feet
  • Features: Snap-in clips, no wire tying needed
  • Function: Ensures reinforcement stays in place before, during, and after concrete pour

Product Usage Instructions

  1. Identify the spacing for the footing stands according to the recommended placement of every 4 feet.
  2. Place a footing stand at each identified location.
  3. Secure the reinforcement by snapping it into the clips on the footing stands.
  4. Ensure the reinforcement is properly aligned and supported before pouring concrete.
  5. After the concrete pour, verify that the reinforcement remains in place with the help of the footing stands.

Frequently Asked Questions (FAQ)

  • Q: Do I need to tie wires when using the 2-Bar & 3-Bar Footing Stands?
    A: No, wire tying is not needed with our footing stands. Simply snap the reinforcement into the clips for a secure placement

  • Q: How many footing stands should I use for a specific area?
    A: We recommend placing a stand every 4 feet to ensure proper support and alignment of the reinforcement.

Recommended Placement Guide

2-Bar & 3-Bar Footing Stands

For our 2-Bar and 3-Bar Footing Stands, we recommend placing a stand every 4 feet. Simply snap the reinforcement into the clips, and you are finished. No wire tying needed. Our footing stands ensure the reinforcement stays in the right place before, during, and after the concrete pour.

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals