QUOIZEL LIGHTING QSF6742BN Starlight 4 Light 19 Wide Crystal Pendant Installation Guide

July 30, 2024
QUOIZEL LIGHTING

INSTALLATION GUIDE FOR QSF6742MBK
QSF6742BN,QP6742MBK and QP6742BN
Released Date: 2024-03-25

SAFETY INFORMATION

Please read and understand this entire manual before attempting to assemble, install or operate the product.
WARNING

  • RISK OF ELECTRIC SHOCK – Before beginning installation, turn off electricity at the circuit breaker box or the main fuse box.
  • RISK OF FIRE – Use bulbs specified by the markings and/or labels on the fixture.

CAUTION

  • For your safety, read instructions completely before beginning installation.
  • If in doubt about electrical installation, consult a licensed electrician.
  • Turn off electricity to fixture before replacing the bulb(s).

TOOLS REQUIRED

CARE AND MAINTENANCE

  • Wipe clean using soft, dry cloth or static duster. Always avoid using harsh chemicals and abrasives to clean fixture as they may damage the finish.
    If you need further assistance call Quoizel Customer Care at 1-800-645-3184 (9:00am – 5:00pm EST), or visit us on-line at www.quoizel.com.

PACKAGE CONTENTS

MOUNTING HARDWARE

INSTALLATION

IMPORTANT: This CONVERTIBLE fixture can be mounted as pendant light or semi-flush light.
DO NOT CUT SUPPLY WIRES if you intend to use it as pendant light.
OPTION 1: SEMI-FLUSH – QSF6742MBK and QSF6742BN

  • Set aside (2) 6″L Rods and (2) 12″L Rods, swivel since they are not required for the semi-flush installation.

    1. Remove Swivel

    2. Install Ceiling Canopy

  • Cut the supply wires leaving approximately 8” of wire extending from the ceiling canopy after assembly.

    1. Install Crossbar

    2. Wiring

    3. Install Ceiling Canopy to Crossbar Assembly

    4. Install long Crystals

    5. Install Short Crystals

    6. Install Ring

    7. Install Bulbs
      Install our correct bulbs referring to fixture markings and/or labels for maximum wattage.
      Recommended Bulb type (not included):
      Your installation is now complete! Restore electricity and save this sheet for future reference.

OPTION 2: PENDANT – QP6742MBK and QP6742BN

  1. Install Rods
    Optional Rods:
    8 Feet Ceiling:
    ( 2) 12″L Rods.
    9 Feet Ceiling:
    (2 ) 6″L Rods + (2) 12″L Rods.

  2. Tighten hex nut inside of the Ceiling Canopy

  3. Install Ceiling Canopy to Upper Rod

  4. Install Crossbar Assembly

  5. Wiring

  6. Install Ceiling Canopy to Crossbar

  7. Install long Crystals

  8. Install Short Crystals

  9. Install Ring

  10. Install Bulbs
    Install four correct bulbs referring to fixture markings and/or labels for maximum wattage.
    Recommended Bulb type (not included):

Your installation is now complete! Restore electricity and save this sheet for future reference.

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals