Specifications

  • Model: R1003A3 R-8000AY3
  • Manufacturer: GOLDSTAR
  • Factory Charged Refrigerant

Features
The GOLDSTAR R1003 Air Conditioner is designed with the following features:

  • Efficient cooling performance
  • Easy-to-use controls
  • Quality construction for durability
  • Reversible inlet grille for versatile installation

Control Locations
The control locations on the unit provide easy access to adjust settings for optimal comfort.

Installation

  1. Select the best location for installation.
  2. Check the installation for proper setup.
  3. Follow guidelines on how to drain excess moisture.
  4. Install the unit correctly for efficient operation.
  5. Use the reversible inlet grille feature as needed.

Troubleshooting Guide
If you encounter issues with the air conditioner, refer to the troubleshooting guide for assistance in identifying and resolving problems.

Schematic Diagram
The circuit diagram provides a visual representation of theelectrical components for reference during servicing.

Exploded View
The exploded view diagram illustrates the internal parts and their assembly for better understanding of the unit’s structure.

Product Usage Instructions

Safety Precautions
Before servicing the unit, ensure to follow these safety precautions:

  1. Set the ROTARY SWITCH or POWER SWITCH to OFF.
  2. Unplug the power cord to prevent electrical accidents.

Installation

  1. Selecting the Best Location: Choose a location that allows proper air circulation and easy access to power outlets.
  2. Checking Installation: Ensure all parts are securely connected and the unit is level for efficient operation.
  3. Draining Excess Moisture: Follow instructions on how to drain accumulated water to prevent leaks and damage.
  4. Proper Installation: Install the air conditioner following the provided guidelines to avoid performance issues.
  5. Using Reversible Inlet Grille: Modify the inlet grille position as needed for customized airflow direction.

Frequently Asked Questions (FAQ)

  1. Q: How often should I clean the air filters?
    A: It is recommended to clean the air filters every 2 weeks to maintain optimal airflow and cooling efficiency.

  2. Q: Can I use the air conditioner without installing it in a window?
    A: It is not recommended to operate the air conditioner without proper installation as it may affect performance and safety.

CAUTION
Before Servicing the unit, read the safety precautions in General SVC manual. Only for authorized service personnel.

PREFACE

This SERVICE MANUAL provides various service information, including the mechanical and electrical parts etc. This room air conditioner was manufactured and assembled under a strict quality control system. The refrigerant is charged at the factory. Be sure to read the safety precautions prior to servicing the unit.

SAFETY PRECAUTIONS

  1. When servicing the unit, set the ROTARY SWITCH or POWER SWITCH to OFF and unplug the power cord.

  2. Observe the original lead dress.
    If a short circuit is found, replace all parts which have been overheated or damaged by the short circuit.

  3. After servicing the unit, make an insulation resistance test to protect the customer from being exposed to shock hazards.

INSULATION RESISTANCE TEST

  1. Unplug the power cord and connect a jumper between 2 pins (black and white).
  2.  The grounding conductor (green) is to be open.
  3. Measure the resistance value with an ohm meter between the jumpered lead and each exposed metallic part on the equipment at all the positions (except OFF) of the ROTARY SWITCH.
  4. The value should be over 1MΩ.

Copyright ©2007 LG Electronics. Inc. All right reserved. Only for training and service purposes

SPECIFICATIONS

MODELS/ ITEMS R10003A3 R- 8000AY3
POWER SUPPLY 1ø, 115, 60Hz
COOLING CAPACITY (Btu/h) 10,000
INPUT (W) 1,020
RUNNING CURRENT (A) 9.2
E.E.R                                (BTU/W.h) 9.8

OPERATING

CONDITION

| INDOOR  (°C)| 26.7(DB)*| 19.4(WB)*
OUTDOOR (°C)| 35(DB)
| 23.9(WB)
REFRIGERANT (R-22) CHARGE| 460g(16.2oz)| 260g(9.2oz)
EVAPORATOR| 3 ROW 14 STACKS, SLIT-FIN TYPE
CONDENSER| 2 ROW 16 STACKS, L-BENDED TYPE
FAN, INDOOR| TURBO FAN
FAN, OUTDOOR| PROPELLER TYPE FAN WITH SLINGER-RING
FAN SPEEDS, FAN/COOLING| 2/3
FAN MOTOR| 6 POLES
OPERATION CONTROL| ROTARY SWITCH
ROOM TEMP. CONTROL| THERMOSTAT
**
AIR DIRECTION CONTROL| VERTICAL LOUVER (RIGHT & LEFT)
HORIZONTAL LOUVER (UP & DOWN)
CONSTRUCTION| SLIDE IN-OUT CHASSIS
PROTECTOR| COMPRESSOR| OVERLOAD PROTECTOR
FAN MOTOR| INTERNAL THERMAL PROTECTOR
POWER CORD| (3 WIRE WITH GROUDING)
ATTACHMENT PLUG (CORD-CONNECTED TYPE)
DRAIN SYSTEM| DRAIN PIPE OR SPLASHED BY FAN SLINGER
NET WEIGHT| (lbs/kg)| 70/32
OUTSIDE DIMENSION
(W x H x D)| (inch)| 181/2 x 137/8 x 2011/16
(mm)| 470 x 353 x 525

  • DB:Dry Bulb
    **WB:Wet Bulb

FEATURES

  • Designed for COOLING ONLY.
  • Powerful and whispering cooling.
  • Slide-in and slide-out chassis for the simple installation and service.
  • Side air-intake, side cooled-air discharge.
  • Built-in adjustable THERMOSTAT
  • Washable one-touch filter
  • Compact size
  • Reliable and efficient rotary compressor is equipped.

CONTROL LOCATIONS

COOLING ONLY MODEL
VENTILATION
The ventilation lever must be in the CLOSE position in order to maintain the best cooling conditions. When a fresh air is necessary in the room, set the ventilation lever OPEN position.

The damper is opened and room air is exhausted.

THERMOSTAT
Thermostat will automatically control the temperature of the room. Select a higher number (the right side of arc) for a cooler temperature in the room. The temperature is selected by positioning the knob to the desired position.
The 5 or 6 position (the middle position of arc) is a normal setting for average conditions.

Goldstar-R1003-Room-Air-Conditioner-\(2\)

OPERATION

  • OFF : Turns the air conditioner to off.
  • MED FAN : Permits the medium fan speed operation without cooling.
  • LOW FAN : Permits the low fan speed operation without cooling.
  • HIGH COOL : Permits cooling with the high fan speed operation.
  • MED COOL : Permits cooling with the medium fan speed operation.
  • LOW COOL : Permits cooling with the low fan speed operation.

DISASSEMBLY INSTRUCTIONS

  • Before the following disassembly, POWER SWITCH set to OFF and disconnect the power cord.

MECHANICAL PARTS
FRONT GRILLE

  1. Open the lnlet grille upward or downward.
  2. Remove the screw which fastens the front grille.
  3. Pull the front grille from the right side.
  4. Remove the front grille.
  5. Re-install the component by referring to the removal procedure, above.(See Figure 1)

Goldstar-R1003-Room-Air-Conditioner-\(3\)

CABINET

  1. After disassembling the FRONT GRILLE, remove the 2 screws which fasten the cabinet at both sides.
  2. Remove the 2 screws which fasten the cabinet at back.
  3. Pull the base pan forward. (See Figure 2)
  4. Remove the cabinet.
  5. Re-install the component by referring to the removal procedure, above.

CONTROL BOX

  1. Disconnect the unit from the power source.

  2. Remove the front grille. (Refer to section 2.1.1)

  3. Remove the cabinet. (Refer to section 2.1.2)

  4. Remove the screw which fastens the control box cover.

  5. Remove the housing which connects motor wire in the control box.

  6. Remove the 3 leads from the compressor.
    (Refer to section 2.3.1)

  7. Discharge the capacitor by placing a 20,000 ohmresistor across the capacitor terminals.

  8. Remove the 2 screws which fasten the control box.(See Figure 3)

  9. Pull the control box forward completely.

  10. Re-install the components by referring to the removal procedure, above. (See Figure 3)
    (Refer to the circuit diagram found on page 24, in this manual or on the control box.)

Goldstar-R1003-Room-Air-Conditioner-\(5\)

AIR HANDLING PARTS
AIR GUIDE AND BLOWER

  1. Remove the front grille. (Refer to section 2.1.1)
  2. Remove the cabinet. (Refer to section 2.1.2)
  3. Remove the control box. (Refer to section 2.1.3)
  4. Remove the 3 screws which fasten the brace.
  5. Remove the brace.
  6. Remove the 2 screws which fasten the evaporator.
  7. Move the evaporator forward and pulling it upward slightly. (See Figure 4)
  8. Move the evaporator to the left carefully.
  9. Pull out the hook of orifice by pushing the tabs and remove it. (See Figure 5)
  10. Remove the clamp with a hand plier which secures the turbo fan.
  11. Remove the turbo fan.
  12. Remove the 4 screws which fasten the air guide from the barrier.
  13. Move the air guide backward, pulling out from the base pan.
  14. Re-install the components by referring to the removal procedure, above.

Goldstar-R1003-Room-Air-Conditioner-\(6\)

Goldstar-R1003-Room-Air-Conditioner-\(7\)

FAN AND SHROUD

  1. Remove the cabinet. (Refer to section 2.1.2)

  2. Remove the brace (Refer to section 2.2.1)

  3. Remove the screw which fastens the cover cond.

  4. Remove the 5 screws which fasten the condenser.

  5. Move the condenser to the left carefully.

  6. Remove the clamp with a hand plier which secures the fan.

  7. Remove the fan and then pull out the shroud.
    (See Figure 6)

  8. Re-install the components by referring to the removal procedure.

Goldstar-R1003-Room-Air-Conditioner-\(8\)

ELECTRICAL PARTS
OVERLOAD PROTECTOR

  1. Remove the cabinet. (Refer to section 2.1.2)
  2. Remove the nut which fastens the terminal cover.
  3. Remove the terminal cover. (See Figure 7)
  4. Remove all the leads from the overload protector.
  5. Remove the overload protector.
  6. Re-install the component by referring to the removal procedure, above.

COMPRESSOR

  1. Remove the cabinet. (Refer to section 2.1.2)

  2. Discharge the refrigerant system using a FreonTM Recovery System.
    If there is no valve to attach the recovery system, install one (such as a WATCO A-1) before venting the FreonTM. Leave the valve in place after servicing the system.

  3. Remove the overload protector. (Refer to section 2.3.1)

  4. After purging the unit completely, unbraze the suction and discharge tubes at the compressor connections.

  5. Remove the 3 nuts and the 3 washers which fasten the compressor.

  6. Remove the compressor. (See Figure 8)

  7. Re-install the components by referring to the removal procedure, above.

CAPACITOR

  1. Remove the control box. (Refer to section 2.1.3)
  2. Remove the knobs and the screw which fasten control panel from control box.
  3. Remove the screw which is located in the front.
  4. Open the bottom side of control box.
  5. Remove the screw and the clamp which fasten the capacitor.
  6. Disconnect all the leads of capacitor terminals.
  7. Re-install the components by referring to the removal procedure, above. (See Figure 9)

POWER CORD

  1. Remove the control box. (Refer to section 2.1.3)

  2. Open the control box. (Refer to section 2.3.3)

  3. Disconnect the grounding screw from the control box.

  4. Disconnect the 2 receptacles.

  5. Remove a screw which fastens the clip cord.
    (See Figure 10)

  6. Remove the power cord.

  7. Re-install the component by referring to the above removal procedure, above.
    (Use only one ground-marked hole  for ground connection.)

  8. If the supply cord of this appliance is damaged, it must be replaced by the special cord. (The special cord means the cord which has the same specification marked on the supply cord attached at the unit.)

THERMOSTAT

  1. Remove the control box. (Refer to section 2.1.3)
  2. Open the control box. (Refer to section 2.3.3)
  3. Remove the 2 screws which fasten the thermostat.
  4. Disconnect 2 leads of thermostat terminals.
  5. Remove the thermostat.
  6. Re-install the components by refereing to the above removal procedure. (See Figure 11)

ROTARY SWITCH

  1. Remove the control box. (Refer to section 2.1.3)
  2. Open the control box. (Refer to section 2.3.3)
  3. Remove the 2 screws which fasten the rotary switch.
  4. Disconnect all the leads of the rotary switch terminals.
  5. Remove the rotary switch.
  6. Re-install the components by referring to the above removal procedure. (See Figure 12)

MOTOR

  1. Remove the cabinet. (Refer to section 2.1.2)
  2. Remove the evaporator. (Refer to section 2.2.1)
  3. Remove the orifice. (Refer to section 2.2.1)
  4. Remove the blower. (Refer to section 2.2.1)
  5. Remove the fan. (Refer to section 2.2.2)
  6. Remove the control box cover and housing of the motor in the control box. (Refer to section 2.1.3)
  7. Remove the 2 screws which fasten the motor from the mount motor. (See Figure 13)
  8. Remove the motor.
  9. Re-install the components by referring to the removal procedure, above.(See Figure 13)

Goldstar-R1003-Room-Air-Conditioner-\(15\)

REFRIGERATING CYCLE
CAUTION
Discharge the refrigerant system using a FreonTM Recovery System.
If there is no valve to attach the recovery system, install one (such as a WATCO A-1) before venting the FreonTM. Leave the valve in place after servicing the system.

CONDENSER

  1. Remove the cabinet. (Refer to section 2.1.2)
  2. Remove the 3 screws which fasten the brace.(Refer to section 2.2.1)
  3. Remove the screw which fastens the cover cond.
  4. Remove the 5 screws which fasten the condenser and shroud.
  5. After discharging the refrigerant completely, unbraze the interconnecting tube at the condenser connections.
  6. Remove the condenser carefully.
  7. Re-install the components by referring to the removal procedure.
    (See Figure 14)

EVAPORATOR

  1. Remove the cabinet. (Refer to section 2.1.2)

  2. Remove the 2 screws which fasten the evaporator.

  3. Move the evaporator sideways carefully.
    (Refer to section 2.2.1)

  4. After discharging the refrigerant completely, unbraze the interconnecting tube at the evaporator connections.

  5. Remove the evaporator carefully.

  6. Re-install the components by referring to the removal procedure.(See Figure 15)

CAPILLARY TUBE

  1. Remove the cabinet. (Refer to section 2.1.2)
  2. After discharging the refrigerant completely, unbraze the interconnecting tube at the capillary tube.(See caution above)
  3. Remove the capillary tube.
  4. Re-install the components by referring to the removal procedure.

NOTES
Replacement of the refrigeration cycle.

  1. When replacing the refrigeration cycle, be sure to Discharge the refrigerant system using a FreonTM recovery System.
    If there is no valve to attach the recovery system, install one (such as a WATCO A-1) before venting the FreonTM. Leave the valve in place after servicing the system.

  2. After discharging the unit completely, remove the desired component, and unbraze the pinch-off tubes.

  3. Solder service valves into the pinch-off tube ports, leaving the valves open.

  4. Solder the pinch-off tubes with Service valves.

  5. Evacuate as follows.

  6. Connect the vacuum pump, as illustrated figure 16A.

  7. Start the vacuum pump, slowly open manifold valves A and B with two full turns counterclockwise and leave the valves open. The vacuum pump is now pulling through valves A and B up to valve C by means of the manifold and entire system.
    CAUTION
    If high vacuum equipment is used, just crack valves A and B for a few minutes, then open slowly with the two full turns counterclockwise. This will keep oil from foaming and being drawn into the vacuum pump.

  8. Operate the vacuum pump for 20 to 30 minutes, until 600 microns of vaccum is obtained. Close valves A and B, and observe vacuum gauge for a few minutes. A rise in pressure would indicate a possible leak or moisture remaining in the system. With valves A and B closed, stop the vacuum pump.

  9. Remove the hose from the vacuum pump and place it on the charging cylinder. See figure 16B.
    Open valve C.
    Discharge the line at the manifold connection.

  10. The system is now ready for final charging.

  11. Recharge as follows :

  12. Refrigeration cycle systems are charged from the High-side. If the total charge cannot be put in the High-side, the balance will be put in the suction line through the access valve which you installed as the system was opened.

  13. Connect the charging cylinder as shown in figure 16B.
    With valve C open, discharge the hose at the manifold connection.

  14. Open valve A and allow the proper charge to enter the system. Valve B is still closed.

  15. If more charge is required, the high-side will not take it. Close valve A.

  16. With the unit running, open valve B and add the balance of the charge.

    * Do not add the liquid refrigerant to the Low-side.
    * Watch the Low-side gauge; allow pressure to rise to 30 lbs.
    * Turn off valve B and allow pressure to drop.
    * Repeat steps b. and c. until the balance of the charge is in the system.
  6. When satisfied the unit is operating correctly, use the pinch-off tool with the unit still running and clamp on to the pinch-off tube. Using a tube cutter, cut the pinch-off tube about 2 inches from the pinch-off tool. Use sil-fos solder and solder pinch-off tube closed. Turn off the unit, allow it to set for a while, and then test the leakage of the pinch-off connection.

Equipment needed: Vacuum pump, Charging cylinder, Manifold gauge, Brazing equipment. Pin-off tool capable of making a vapor-proof seal, Leak detector, Tubing cutter, Hand Tools to remove components, Service valve.

Goldstar-R1003-Room-Air-Conditioner-\(18\)

Goldstar-R1003-Room-Air-Conditioner-\(19\)

INSTALLATION

SELECT THE BEST LOCATION

  1. To prevent vibration and noise, make sure the unit is installed securely and firmly.

  2. Install the unit where the sunlight does not shine directly on the unit.

  3. The outside of the cabinet must extend outward for at least 11″ and there should be no obstacles, such as a fence or wall, within 20″ from the back of the cabinet because it will prevent heat radiation of the condenser.
    Restriction of outside air will greatly reduce the cooling efficiency of the air conditioner.
    CAUTION
    All side louvers of the cabinet must remain exposed to the outside of the structure.

  4. Install the unit a little slanted so the back is slightly lower than the front (about 1/2″). This will help force condensed water to the outside.

  5. Install the unit from the bottom about 30″~60″ above the floor level.

CHECK OF INSTALLATION
The setting conditions must be checked prior to initial starting.
The undermentioned items are especially important checking points when the installation is finished.

  1. Grounding wire (Green or Green and Yellow) is provided in the power cord. The green wire must be grounded.
  2. Connect to a single-outlet 15A circuit.
  3. To avoid vibration or noise, make sure the air conditioner is installed securely.
  4. Avoid placing furniture or draperies in front of the air inlet and outlet.

HOW TO DRAIN (When using drain pipe)
The air conditioner must be installed horizontally or tilted slightly to the outside for proper water drainage.
On exceptionally hot and humid days the air conditioner may overflow condensed water.
If the air conditioner is used in a hot and high humidity zone, exchange the ① HOLE RUBBER for the ② DRAIN PIPE.(See figure 18, figure 19.)

HOW TO INSTALL
WHEN USING GASKET

Goldstar-R1003-Room-Air-Conditioner-\(23\)

  1. WINDOW (WIDTH-A, HEIGHT-B)
  2. GASKET
  3. WALL
  4. DETAILS 5.1 x 30 ROUND HEAD WOOD SCREWSGoldstar-R1003-Room-Air-Conditioner-\(24\)
A B C D E F G H J K
495mm (191/2″) 366mm (147/16″) 250mm (10″) 30mm (11/16″) 0~25mm (0~1″)
OVER 420mm (OVER 1617/32″) 12mm (1/2″) 32mm (11/4″) 5~10mm (3/16″~3/8″)

0~5mm (0~3/16″)

WHEN USING INSTALLATION KITS

WINDOW REQUIREMENTS
This unit is designed for installation in standard double hung windows with actual opening widths from 22″ to 36″.
The top and bottom window sash must open sufficiently to allow a clear vertical opening of 15″ from the bottom of the upper sash to the window stool.

INSTALLATION KITS CONTENTS

NO. NAME OF PARTS Q’TY
1 FRAME CURTAIN 2
2 SILL SUPPORT 2
3 BOLT 2
4 NUT 2
5 SCREW(TYPE A) 16
6 SCREW(TYPE B) 3
7 SCREW(TYPE C) 5
8 FOAM-STRIP 1
9 UPPER GUIDE 1
10 FOAM-PE 1
11 FRAME GUIDE 2
12 WINDOW LOCKING BRACKET 1
13 FOAM-PE 1
14 DRAIN JOINT PIPE 1
15 DRAIN WASHER 1

SUGGESTED TOOL REQUIREMENTS

SCREWDRIVER(+, -), RULER, KNIFE, HAMMER, PENCIL, LEVEL
PREPARATION OF CHASSIS

  1. Remove the screws which fasten the cabinet at both sides and at the back.

  2. Slide the unit from the cabinet by gripping the base pan handle and pulling forward while bracing the cabinet.

  3. Cut the window sash seal to the proper length.
    Peel off the backing and attach the foam-pe ⑬ to the underside of the window sash.

  4. Remove the backing from the top upper guide Foam PE ⑩ and attach it to the bottom of the upper guide ⑨.Goldstar-R1003-Room-Air-Conditioner-\(27\)

  5. Attach the upper guide onto the top of the cabinet with 3 type A screws.

  6. Insert the frame guides ⑪ into the bottom of the cabinet.

  7. Insert the Frame Curtain ① into the upper guide ⑨ and frame guides ⑪.

  8. Fasten the curtains to the unit with 4 Type A screws.

Goldstar-R1003-Room-Air-Conditioner-\(28\)

CABINET INSTALLATION

  1. Open the window. Mark a line on center of the window stool(or desired air conditioner location). Carefully place the cabinet on the window stool and align the center mark on the bottom front with the center line marked in the window stool.

  2. Goldstar-R1003-Room-Air-Conditioner-\(29\)Pull the bottom window sash down behind the upper guide until it meets.
    NOTE:
    Do not pull the window sash down so tightly that the movement of Frame Curtain is restricted.Goldstar-R1003-Room-Air-
Conditioner-\(30\)

  3. Loosely assemble the sill support using the parts in Figure 22.

  4. Select the position that will place the sill support near the outer most point on sill (See Figure 23)
    NOTE: Be careful when you install the cabinet (frame guides ⑪ are broken so easily).

  5. Attach the sill support to the cabinet track hole in relation to the selected position using 2 Type A screws in each support(See Figure 23).

  6. The cabinet should be installed with a very slight tilt(about 1/2″) downward toward the outside (See Figure 24). Adjust the bolt and the nut of sill support for balancing the cabinet.

  7. Attach the cabinet to the window stool by driving the screws ⑥(Type B: Length sixteen millimeters and below.) through the front angle into window stool.

  8. Pull each Frame curtain fully to each window sash track, and repeat step 2.

  9. Attach each Frame curtain the window sash using screws ⑦(Type C).(See Figure 25)Goldstar-R1003-Room-Air-Conditioner-\(33\) CAUTION: DO NOT DRILL A HOLE IN THE BOTTOM PAN.
    The unit is designed to operate with approximately 1/2″ of water in bottom pan.

  10. Slide the unit into the cabinet.(See Figure 26) CAUTION: For security purpose, reinstall screws(Type A) at cabinet’s sides.

  11. Cut the foam-strip ⑧ to the proper length and insert between the upper window sash and the lower window sash.
    (See Figure 27)

  12. Attach the window locking bracket ⑫ with a type C screw. (See Figure 28)

  13. Attach the front grille to the cabinet by inserting the tabs on the grille into the tabs on the front of the cabinet. Push the grille in until it snaps into place.(See Figure 29)

  14. Lift the inlet grille and secure it with a type A screw through the front grille.(See Figure 30)

  15. Window installation of room air conditioner is now completed. See ELECTRICAL DATA for attaching power cord to electrical outlet.

HOW TO USE THE REVERSIBLE INLET GRILLE

  1. If you want to pull out the filter upward, open the inlet grille slightly. Turn inside out the front grille.
    Disassemble the inlet grille from the front grille with separating the hinged part by inserting a “—” type screw-driver tip.
    Rotate the inlet grille 180 degrees and insert the hooks into the lower holes of front grille.
    Then, insert the filter. (See Figure 32, 33)Goldstar-R1003-Room-Air-
Conditioner-\(38\)

  2. Attach the front grille to the cabinet by inserting the tabs on the grille into the tabs on the front of the cabinet. Push the grille in until it snaps into place.(See Figue 34)

  3. Lift the inlet grille and secure it with a type A screw through the front grille.(See Figure 35)

  4. If you want to pull out the filter downward, use the reversible inlet grille without change.
    (The grille is already assembled for that way.)

TROUBLESHOOTING GUIDE

OUTSIDE DIMENSIONS

unit: mm(inch)

Goldstar-R1003-Room-Air-Conditioner-\(41\)

PIPING SYSTEM

Goldstar-R1003-Room-Air-Conditioner-\(42\)

Following is a brief description of the important components and their function in what is called the refrigeration system. Reference should made to Figure 36 to follow the refrigeration cycle and the flow of the refrigerant in the cooling cycle.

Goldstar-R1003-Room-Air-Conditioner-\(43\)

TROUBLESHOOTING GUIDE
In general, possible trouble is classified in two kinds.
The one is called Starting Failure which is caused from an electrical defect, and the other is ineffective Air Conditioning caused by a defect in the refrigeration circuit and improper application.
Unit runs but poor cooling.

Goldstar-R1003-Room-Air-Conditioner-\(44\)

Goldstar-R1003-Room-Air-Conditioner-\(45\)

ROOM AIR CONDITIONER VOLTAGE LIMITS

NAME PLATE RATING MINIMUM MAXIMUM
**** AC 115V ± 10% **** AC 103.5V **** AC 126.5V
COMPLAINT CAUSE REMEDY
--- --- ---
Fan motor will not run. No power Check voltage at outlet. Correct if none.
Power supply cord Check voltage to rotary switch. If none, check power supply

cord. Replace cord if circuit is open.
Rotary switch| Check switch continuity. Refer to wiring diagram for terminal identification. Replace switch if defective.
Wire disconnected or connection loose| Connect wire. Refer to wiring diagram for terminal identification. Repair or replace loose terminal.
Capacitor (Discharge capacitor before testing.)| Test capacitor.
Replace if not within ±10% of manufacturer’s rating. Replace if shorted, open, or damaged.
Will not rotate| Fan blade hitting shroud or blower wheel hitting scroll. Re- align assembly.
Units using slinger ring condenser fan must have 1/4 to 5/16 inch clearance to the base. If it hits the base, shim up the bottom of the fan motor with mounting screw(s).
Check fan motor bearings; if motor shaft will not rotate, replace the motor.
Fan motor runs.| Revolves on overload.| Check voltage. See limits on this page. If not within limits, call an electrician.
Test capacitor.
Check bearings. Does the fan blade rotate freely? If not, replace fan motor.
Pay attention to any change from high speed to low speed. If the speed does not change, replace the motor.
Fan motor noise.| Fan| If cracked, out of balance, or partially missing, replace it.
---|---|---
Blower| If cracked, out of balance, or partially missing, replace it.
Loose clamper| Tighten it.
Worn bearings| If knocking sounds continue when running or loose, replace the motor. If the motor hums or noise appears to be internal while running, replace motor.
Compressor will not run, but fan motor runs.| Voltage| Check voltage. See the limits on the preceding page. If not within limits, call an electrician.
Wiring| Check the wire connections, if loose, repair or

replace the terminal. If the wires are disconnected, refer to wiring diagram for identification, and replace the wires. Check the wires connections; If not, according to the wiring diagram, correct the connections.

Rotary| Check for continuity, refer to the wiring diagram for terminal identification. Replace the switch if the circuit is open.
Thermostat| Check the position of knob If not at the coldest setting, advance the knob to this setting and restart the unit. Check continuity of the thermostat. Replace the thermostat if the circuit is open.
Capacitor (Discharge capacitor before servicing.)| Check the capacitor.
Replace if not within ±10% of manufacturer’s rating. Replace if shorted, open, or damaged.
Compressor| Check the compressor for open circuit or ground. If open or grounded, replace the compressor.


Overload

| Check the compressor overload if externally mounted. Replace if open. (If the compressor temperature is high, remove the overload, cool and retest.)
Compressor cycles on overload.| Voltage| Check the voltage. See the limits on the preceding page. If voltage is not within these limits, call an electrician.
Overload| Check overload, if externally mounted.
Replace if open. (If the compressor temperature is high, remove the overload, cool, and retest.)
Compressor cycles on overload| Fan motor| If not running, determine the cause. Replace if required.
---|---|---
Condenser air flow restriction| Remove the cabinet, inspect the interior surface of the condenser. If restricted, clean carefully with a vacuum cleaner (do not damage fins) or brush. Clean the interior base before re-assembling.
Condenser fins (damaged)| If the condenser fins are closed over a large area on the coil surface, head pressures will increase, causing the compressor to cycle. Straighten the fins or replace the coil.
Capacitor| Test the capacitor.
Wiring| Check the terminals. If loose, repair or replace.
Refrigeration system| Check the system for a restriction.
Insufficient cooling| Air filter| If restricted, clean of replace.
Exhaust damper door| Close if open.
Unit undersized| Determine if the unit is properly sized for the area to be cooled.
Excessive noise.| Blower or fan| Check the set screw or clamp. If loose or missing, correct. If the blower or fan is hitting air guide, rearrange the air handling parts.
Copper tubing| Remove the cabinet carefully, rearrange the tubing not to contact cabinet, compressor, shroud, and barrier.

SCHEMATIC DIAGRAM

CIRCUIT DIAGRAM

Goldstar-R1003-Room-Air-Conditioner-\(46\)

REF. NO. DESCRIPTION & NAME Q’TY PER SET
1 POWER CORD 1
2 ROTARY SWITCH 1
3 FAN MOTOR 1
4 CAPACITOR 1
5 THERMOSTAT 1
6 OVERLOAD PROTECTOR 1
7 COMPRESSOR 1

EXPLODED VIEW

Goldstar-R1003-Room-Air-Conditioner-\(47\)

Copyright ©2007 LG Electronics. Inc.
All right reserved. Only for training and service purposes

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals