**BLUETTI AC500 Partial Home Backup System User Manual
**
Thank You!
Thank you for making BLUETTI a part of your family.
From the very beginning, BLUETTI has tried to stay true to a sustainable
future through green energy storage solutions for both indoor and outdoor use
while delivering an exceptional eco-friendly experience for our homes and our
world.
That’s why BLUETTI makes its presence in 70+ countries and is trusted by
millions of customers across the globe.
- NEMA 14-50 Outlet
- NEMA SS2-50 Power Inlet Box
- AC500 Input Cable
- AC500 Output Cable
NOTE:
- The backup system must be properly installed by a licensed electrician.
- Please check the voltage at outlets before plugging in your household appliances.
- It is a electrical schematic. For the actual wiring diagram, please refer to Reliance PRO/TRAN2 installation instructions.
240 Volts AC500+B300S Backup System
You can build the 240V Split Phase System by pairing two sets of AC500+B300S together. The system also has double the available output power and capacity. Besides TWO sets of AC500+B300S, you also need the following:
Before installing the Reliance Controls transfer switch system, please make a emergency energy plan that includes which appliances you need during a power outage. It is highly recommended to “balance the load” between the two phases of transfer switch, that’s to say, do not connect high-wattage appliances centrally to a single AC500+B300S set.
- NEMA 14-50 Outlet
- NEMA $52-50 Power Inlet Box . AC500 Split-phase Input Cable
- ACS00 Split-phase Output Cable
Split Phase Backup System
Caution! The backup split phase system must be properly installed by a
licensed electrician.
How to configure the AC500+B300S sets:
Step1: Pull the AC input cable , turn off both AC500+B300S sets .
Step 2: Connect AC500+B300S sets to transfer switch via the AC500 split-
phase output cable. One NEMA 14-50 plug goes to a set.
Step 3: Connect two AC500 units via the communication cable.
Step 4: Turn on either AC500+B300S set.
Step 5: Go to “Settings” and tap “Next”.
Step 6: Tap “Single Phase”, the machine type option pops up and
select “Split phase”.
- Machine Type: Select Split Phase
Step 7: Select the “Master” in the Machine Address pop up.
Step 8: Turn on the other AC500+B300S set. Repeat step 5 and 6 to set its
machine type to “Split phase”.Working Mode set to “Standard UPS”
Step 9: Select the “Slave” in the Machine Address pop up.
If the connection fails, clear the alarm history, wait for a moment and check
again.
Please watch the video from:https://www.youtube.com/watch?v=quvcX8mEUCo
NOTE:
- Disconnect the AC charging cables from AC500+B300S sets before connecting to the transfer switch.
- The split phase system can be controlled ONLY on the “Master” set.
- If one of the AC500+B300S sets is out of power, the split phase system fails automatically
NOTE:
- The backup system must be properly installed by a licensed electrician.
- Please check the voltage at outlets before plugging in your household appliances.
- It is a electrical schematic. For the actual wiring diagram, please refer to Reliance PRO/TRAN2 installation instructions.
- In the main panel, two Neutral/Ground bus bars have been connected together with copper strips.
Connect the AC500+B300S sets to the main panel
Charge the 240V split phase system with AC500 split
phase AC charging cable. Plug the cable to a NEMA 14-50 socket (240V )and the
other two connectors into AC500s’ AC input ports.
The AC input ports should be connected to L1/N/PE and L2/N/PE, respectively.
The current capacity of AC input plug shall be ≥ 50A.
WRONG CONNECTION
Warning! DO NOT charge AC500+B300S with standard AC charging cable in
the split phase system, as this may cause damage to the batteries inside
B300s and invalidate your warranty
L: Live wire
N: Neutral wire
NOTE:
The split phase system supports charging via solar panels. You can charge
it by PV and the AC500 split-phase AC charging cable simultaneously. (AC
input only through the AC500 split-phase AC charging cable but not the
standard AC charging cable).
Accessories
-
Transfer switch
Recommendation: Reliance Controls TRK0505BR transfer switch.
https://www.bluettipower.com/collections/accessories -
50A AC Charging Cable
https://www.bluettipower.com/collections/accessories
50A AC Charging Cable -
BLUETTI AC500 split-phase output cable
https://www.bluettipower.com/collections/accessories
-
BLUETTI AC500 split-phase AC charging cable
https://www.bluettipower.com/collections/accessorie
-
Communication cable for split-phase function
Please buy it from BLUETTI official store.
https://www.bluettipower.com/products/communication-cable-for-split-phase- function -
NEMA 14-50R socket
For charging the 240V AC500+B300S split phase system.
https://www.bluettipower.com/collections/accessories -
NEMA 14-50P to SS2-50R extension cord
For connecting AC500+B300S to the sub panel.
https://www.bluettipower.com/collections/accessories
How to install Reliance Controls
Please refer to Reliance Controls website: www.reliancecontrols.com
More information
Website: www.bluettipower.com
Email: service@bluettipower.com