BLUETTI AC500 Partial Home Backup System User Manual

July 6, 2024
Bluetti

**BLUETTI AC500 Partial Home Backup System User Manual

**

Thank You!

Thank you for making BLUETTI a part of your family.
From the very beginning, BLUETTI has tried to stay true to a sustainable future through green energy storage solutions for both indoor and outdoor use while delivering an exceptional eco-friendly experience for our homes and our world.
That’s why BLUETTI makes its presence in 70+ countries and is trusted by millions of customers across the globe.
Instruction

  1. NEMA 14-50 Outlet
  2. NEMA SS2-50 Power Inlet Box
  3.  AC500 Input Cable
  4.  AC500 Output Cable
    Backup System
    Backup System

NOTE:

  • The backup system must be properly installed by a licensed electrician.
  • Please check the voltage at outlets before plugging in your household appliances.
  • It is a electrical schematic. For the actual wiring diagram, please refer to Reliance PRO/TRAN2 installation instructions.

240 Volts AC500+B300S Backup System

You can build the 240V Split Phase System by pairing two sets of  AC500+B300S together. The system also has double the available output power and capacity. Besides TWO sets of  AC500+B300S, you also need the following:

Before installing the Reliance Controls transfer switch system, please make a emergency energy plan that includes which appliances you need during a power outage. It is highly recommended to “balance the load” between the two phases of transfer switch, that’s to say, do not connect high-wattage appliances centrally to a single  AC500+B300S  set.

  1. NEMA 14-50 Outlet
  2. NEMA $52-50 Power Inlet Box . AC500 Split-phase Input Cable
  3. ACS00 Split-phase Output Cable

Split Phase Backup System
Split Phase Backup System

  Caution!  The backup split phase system must be properly installed by a licensed electrician.
How to configure the AC500+B300S sets:
Step1: Pull the AC input cable , turn off both AC500+B300S sets .
Step 2: Connect AC500+B300S sets to transfer switch via the AC500 split- phase output cable. One NEMA 14-50 plug goes to a set.
Step 3: Connect two AC500 units via the communication cable.
Step 4: Turn on either AC500+B300S set.
Step 5: Go to “Settings” and tap “Next”.
Split Phase Backup System
Step 6:  Tap  “Single Phase”,  the machine type option pops up and select  “Split phase”.

  • Machine Type:  Select Split Phase
    Machine Type

Step 7:  Select the “Master” in the Machine Address pop up.
Machine Type
Step 8: Turn on the other AC500+B300S set. Repeat step 5 and 6 to set its machine type to “Split phase”.Working Mode set to “Standard UPS”
Step 9: Select the “Slave” in the Machine Address pop up. Machine
Type
If the connection fails, clear the alarm history, wait for a moment and check again. Machine Type
Please watch the video from:https://www.youtube.com/watch?v=quvcX8mEUCo
NOTE:

  • Disconnect the AC charging cables from  AC500+B300S sets before connecting to the transfer switch.
  • The split phase system can be controlled ONLY on the “Master” set.
  • If one of the  AC500+B300S sets is out of power, the split phase system fails automatically

NOTE:

  • The backup system must be properly installed by a licensed electrician.
  • Please check the voltage at outlets before plugging in your household appliances.
  • It is a electrical schematic. For the actual wiring diagram, please refer to Reliance PRO/TRAN2 installation instructions.
  • In the main panel, two Neutral/Ground bus bars have been connected together with copper strips.

Connect the AC500+B300S sets to the main panel
Charge the 240V split phase system with  AC500 split phase AC charging cable. Plug the cable to a NEMA 14-50 socket (240V )and the other two connectors into AC500s’ AC input ports.
The AC input ports should be connected to L1/N/PE and L2/N/PE, respectively. The current capacity of AC input plug shall be ≥ 50A.
Wiring Connection

WRONG CONNECTION

Warning! DO NOT  charge  AC500+B300S with standard AC charging cable in the split phase system, as this may cause damage to the batteries inside B300s and invalidate your warranty
L:  Live wire
N:  Neutral wire
Wiring Connection
NOTE:
The split phase system supports charging via solar panels. You can charge it by PV and the  AC500 split-phase AC charging cable simultaneously. (AC input only through the  AC500 split-phase AC charging cable but not the standard AC charging cable).
Wiring Connection

Accessories

  1. Transfer switch
    Recommendation:
    Reliance Controls TRK0505BR transfer switch.
    https://www.bluettipower.com/collections/accessories

  2. 50A AC Charging Cable
    https://www.bluettipower.com/collections/accessories
    50A AC Charging Cable

  3. BLUETTI AC500 split-phase output cable
    https://www.bluettipower.com/collections/accessories
    split-phase output cable

  4. BLUETTI AC500 split-phase AC charging cable
    https://www.bluettipower.com/collections/accessorie

  5. Communication cable for split-phase function
    Please buy it from  BLUETTI official store.
    https://www.bluettipower.com/products/communication-cable-for-split-phase- function

  6. NEMA 14-50R socket
    For charging the 240V AC500+B300S split phase system.
    https://www.bluettipower.com/collections/accessories

  7. NEMA 14-50P to SS2-50R extension cord
    For connecting AC500+B300S to the sub panel.
    https://www.bluettipower.com/collections/accessories
    SS2-50R extension cord

How to install Reliance Controls

Please refer to Reliance Controls website: www.reliancecontrols.com

More information

Website:  www.bluettipower.com
Email:  service@bluettipower.com

How to build a partial home backup system with  AC500+B300S (Only for US standard).BLUETTI
Logo

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals