TEZE MB51400-200A-HWB Roller Type Mobile ESS Battery User Guide

July 2, 2024
TEZE

TEZE MB51400-200A-HWB Roller Type Mobile ESS Battery

TEZE-MB51400-200A-HWB-Roller-Type-Mobile-ESS-Battery-
product

FAQ

  • Q: Can the battery be connected in series?
    • A: While parallel connection (up to 15 groups) is supported for application expansion, serial connection is not recommended.

Shenzhen Teze Power is a focus on new energy battery research and development, production and sales as one of the high-tech enterprises.

Safe Energy Quality Life

COMPANY PROFILE

ShenZhen Teze power Co., Ltd. was established in 2022; The main products are lithium iron phosphate battery, 12V, 24V, 36V, 48V, lithium battery pack. Energy storage battery pack, portable power supply, mainly provides new energy battery products related to solar energy storage and outdoor power supply, widely used in household energy storage, UPS, industrial energy storage and so on. Is a new energy battery research and development, manufacturing and sales of high-tech enterprises. The company continues to expand the international market with high quality products and sell to all over the world. The company has strengthened quality management and established a set of advanced quality assurance system. The company has strong technical force and has a semi- automated production line with international level. The company has passed IS09001 certification, and the products have passed CE, TUV, CB, KC, UN38.3, UL and other certifications.

The company’s production base covers an area of nearly 2000 square meters, with more than 60 employees. The company has introduced advanced equipment and instruments at home and abroad, and has carried out a number of technical exchanges and cooperation with well-known battery companies at home and abroad. Technological innovation to provide customers with perfect solutions. In response to the national goal of achieving carbon neutrality, reducing carbon emissions, and bringing green new energy to the world.

Feature

TEZE-MB51400-200A-HWB

  • Using lithium iron phosphate core technology, higher safety, 80% DOD charging and discharging under standard conditions, more than 6000 cycles.
  • High integrated analog front end, isolated power circuit.
  • Integrated serial port IC, high voltage accuracy (≤ 20mV), high current accuracy (≤ 2% @ FS).
  • 4-way battery temperature detection (≤ 2 ℃), SOC estimation function, SOH estimation function.
  • Short circuit protection function, adjustable overcurrent protection, multiple sleep and wake-up modes, low power consumption.
  • Dual RS485 communication, parameter adjustable setting, buzzer alarm function, LED status indication function, charging equalization function.
  • Temperature range of battery: – 20 ℃~60 ℃.  Support parallel (up to 15 groups) application expansion.

Application

  • Standby power supply and household energy storage.Solar and wind energy systems.

Safety tips

Preface

Thanks for choosing T E Z E New Energy power wall battery. In order to make you better use and maintain this product, please read the user manual carefully before use. The features of this product are as follows:

  1. Adopt brand new lithium iron phosphate cell; Higher security; In the standard state, 80% DOD charge-discharge ≥6000 times cycle;
  2. Highly integrated analog front end; Isolating power supply circuit;
  3. Integrated serial port IC, high voltage accuracy (≤20mV), high current accuracy (≤2%@FS);
  4. Four-channel battery temperature detection (≤2℃), SOC estimation function, SOH estimation function;
  5. Short-circuit protection function, adjustable overcurrent protection, a variety of sleep and wake up mode, low power consumption;
  6. Dual-port RS485 communication, parameter adjustable setting, buzzer alarm function, LED status indicator function, with charge balance power;
  7. Wide temperature range: -20℃~60℃;
  8. Parallel connection (up to 15 groups) application expansion is supported, but serial connection is not recommended.

Safety disclaimer

  • When installing, using and maintaining this product, users must read this chapter carefully and follow the safety precautions required in this chapter.
  • Any injuries and losses caused by illegal operation are not related to our company.

NOTE

  • It is strictly forbidden to dismantle the case if Non-professionals, and no warranty service will be provided after.

Description of safety matters

  1. Keep the battery out of the reach of children and babies;
  2. Do not put the battery in the oven or other similar equipment;
  3. Do not remove the product label;
  4. Do not try to open the battery pack;
  5. Do not be exposed to the environment above 60℃(300F);
  6. Do not short-circuit the positive and negative terminals of the battery with wires or other metal objects. Do not transport or store batteries with metal objects;
  7. Do not expose the battery to direct heat or flame. Do not use or store batteries near fire or high temperature;
  8. Do not immerse the battery in water, salt water or any other liquid or make it wet;
  9. Do not pierce the battery with any sharp object, knock it with a hammer or similar device, step on it, fall it or get strong vibration;
  10. Do not use the battery if it is damaged or deformed;
  11. If the battery produces odor, smoke or abnormal heat, please stop using it immediately;
  12. If the battery liquid leaks and comes into contact with your eyes, please don’t rub your eyes, and immediately rinse them with plenty of water before seeking medical assistance.

Product Description

Product dimension

TEZE-MB51400-200A-HWB-Roller-Type-Mobile-ESS-Battery-
fig-1

Model Size(LWH)
TEZE-MB51400-200A-HWB 785520450mm

Product details

TEZE-MB51400-200A-HWB-Roller-Type-Mobile-ESS-Battery-
fig-2

Electrical schematic diagram

Technical specifications

Table 1: Technical specification table

No.| Project|
---|---|---

1

|

Model

| TEZE-MB51400-200A-HWB
2| Nominal capacity| 400AH
3| Nominal voltage| 51.2V

4

|

Charging voltage

|

56.8-57.6V

5

|

Operating voltage

|

43.2V~58.4V

6

| Charging Standard Current| 0.2C 80A
Maximum Charging Current| 180A

7

|

Standard charging mode

| At a temperature of 25°C, charge to 58.4V with a constant current of 0.2C5A, and then change continuously with a constant voltage of 58.4V until the current is not greater than 0.02C5A 10.

8

| Maximum discharge current|

200A

---|---|---

9

|

Charging temperature

|

0°C to 45°C (32°F to 113°F) @60±25% relative humidity

10| Discharge

temperature

| -20°C to 60°C (-4°F to 140°F) @60±25% relative humidity

11

|

Storage temperature

|

-20°C to 60°C (-4°F to 140°F) @60±25% relative humidity

12

|

Line joint

|

250A Self-Locking Fitting Quick Release Connector

14

| Net Weight Approx.|

208KG

15

| Communication protocol|

RS485、RS232、CAN

16

| Support inverter brand| Growatt、Deye、Goodwe、Voltronic power、Sofar、

VICTRON、Solis、Megarevo、SRNE

BMS characteristics

Instructions for LED lights\

  • Four green capacity indicators, a red alarm indicator, a green running indicator and a switch indicator.

SOC capacity indicator

Condition Charge Discharge
Capacity indicator lamp

L1

|

L2

|

L3

|

L4

|

L1

|

L2

|

L3

|

L4

power

(%)

| 0~25%| Flash 2| OFF| OFF| OFF| ON| OFF| OFF| OFF
25~50%| ON| Flash 2| OFF| OFF| ON| ON| OFF| OFF
50~75%| ON| ON| Flash 2| OFF| ON| ON| ON| OFF
75~100~| ON| ON| ON| Flash 2| ON| ON| ON| ON
Running indicator light|

ON

|

Flash 3

Status indicator

Table 3: Status indicator status table

Status

|

Warning/Normal/ Protection

| ON/

OFF

|

Run

|

Alert

| LED Battery Level

Indicator

|

Explain

---|---|---|---|---|---|---

|

|

|

|

|

|

Shut down|

Sleep mode

|

ON

|

OFF

|

OFF

|

OFF

|

OFF

|

OFF

|

OFF

|

Light off

Standby

|

Normal

|

ON

| Flash 1|

OFF

|

According to the electricity indication

|

Standby mode

Warning

|

ON

| Flash 1| Flash 3|

Module low voltage

charge

| Normal| ON| ON| OFF| According to the power indicator (the maximum LED of the power indicator

flashes 2)

| The maximum power LED flashes (flash 2),and the ALM does not flash during the overshoot.

Warning

|

ON

|

ON

|

Flash 3

Overcharge Protection

|

ON

|

ON

|

OFF

|

ON

|

ON

|

ON

|

ON

| If there is no mains

supply,the indicator turns to standby

Temperature,over current,failure, protection|

ON

|

OFF

|

ON

|

OFF

|

OFF

|

OFF

|

OFF

|

Stop charging

discharg e

|

Normal

|

ON

| Flash

3

|

OFF

|

According to the electricity indication

|
---|---|---|---|---|---|---

Warning

|

ON

| Flash

3

| Flash

3

UVLO| ON| OFF| OFF| OFF| OFF| OFF| OFF| Stop discharge
Temperature, over current, short out, reversed

polarity ,FAIL-SA

FE

|

ON

|

OFF

|

ON

|

OFF

|

OFF

|

OFF

|

OFF

|

Stop discharge

Invalid

|  |

OFF

|

OFF

|

ON

|

OFF

|

OFF

|

OFF

|

OFF

| Stop charging and discharging

Table 4: LED flashing description

Flashing mode ON OFF
Flash 1 0.25s 3.75s
Flash 2 0.5s 0.5S
Flash 3 0.5s 1.5s

Boot and sleep mode

Sleep mode: the battery will be in sleep mode if any of the following conditions are met

  1. The battery or battery pack over discharge protection lasts for 30 seconds and is not released.
  2. Press the power on / off button for 3 seconds and release.
  3. The minimum voltage of the battery is lower than the “sleep voltage” setting in the setting, without charging and discharging.
  4. Standby for more than 24 hours without charging and discharging.
  5. Switch to the upper computer for sleep manually.

Wake up: the battery will exit sleep mode if any of the following conditions are met

  1. Charger is plugged in; The charger voltage is greater than 48V.
  2. Press the power on / off button for 3 seconds and release.
  3. Plug in the communication cable and open the upper computer software (not available if it is under over discharge protection).

Note: if over discharge protection is enabled, the battery will be in sleep mode. The battery will wake up automatically every 4 hours and turn on the charge / discharge MOS. If charging is available, the battery will be charged, otherwise it will return to sleep mode. If it has been awakened 10 times but cannot be charged, the battery will not wake up again automatically.

Communication area

TEZE-MB51400-200A-HWB-Roller-Type-Mobile-ESS-Battery-
fig-5

  1. RS232: BMS can communicate with upper computer through RS232 interface, so as to monitor various information of battery, including battery voltage, current,temperature, status and battery production information, etc. the default baud rate is 9600bps.
  2. RS485: with dual RS485 interface, you can view the information of pack. The default baud rate is 9600bps.If it is necessary to communicate with the monitoring equipment through RS485, the monitoring equipment is used as the host, polling data according to the address, and the address setting range is 1 ~ 15.
  3. CAN: CAN communication, baud rate 9600bps.
  4. DCT:dry contact interface.
  5. Rst: reset button.
  6. ADS: dial switch
  7. Interface diagramTEZE-MB51400-200A-HWB-Roller-Type-Mobile-ESS-Battery-fig-7
  8. Definition of electrical interface

RS232 — 6P6C vertical RJ11 plug

RJ11 pin| Definition Description
2| NC
3| TX(Single board)
4| RX(Single board)
5| GND

Table 1 RS485 and CAN Interface

RS485 – 8P8C vertical RJ45 socket CAN – 8P8C vertical RJ45 socket
RJ45 pin Definition Description

1、8

|

RS485-B1

| 9、10、11、14、

16

|

NC

2、7| RS485-A1| 12| CANL
3、6| GND| 13| CANH
4、5| NC| 15| GND

Table 2 Parallel communication port

RS485 – 8P8C vertical RJ45 socket RS485 – 8P8C vertical RJ45 socket
RJ45 pin Definition Description
1、8 RS485-B
2、7 RS485-A
3、6 GND
4、5 NC

Description of parallel connection

Parallel connection diagram

If parallel batteries are required, connect the wires according to the diagram,maximum support for 15 batteries in parallel

TEZE-MB51400-200A-HWB-Roller-Type-Mobile-ESS-Battery-
fig-8

Description of parallel connection

The signal line connected to the inverter should use RS485 communication line or CAN communication line. If it is necessary to use batteries in parallel:

  1. RS485 cable shall be used to connect the parallel communication port. Refer to the communication line parallel diagram;
  2. The address of the battery needs to be set. Refer to the dial switch setting table for address setting

Table 4 The Dial Switch Setting Table

Address Dial switch position
  #1
0 OFF
1 ON
2 OFF
3 ON
4 OFF
5 ON
6 OFF
7 ON
8 OFF
9 ON
10 OFF
11 ON
12 OFF
13 ON
14 OFF
15 ON

TEZE-MB51400-200A-HWB-Roller-Type-Mobile-ESS-Battery-
fig-9

Operating instructions

Operating instructions of the display screen

Introduction of LCD

  • Button Description:
    • MENU: enter the management system.
    • Enter: enter the submenu.
    • Down: moves the cursor down or to the next page.
    • ESC: returns to the previous one.

Boot screen

  • Battery protection status:
    • Overvoltage: OV
    • Low voltage: LV
    • Overtemperature: OT
    • Low temperature: IT
    • Over current: OC
    • Short circuit: SC

Note: when the battery is protected,the corresponding protection status will be displayed; otherwise,the protection status will not be displayed as the protection state.

  1. Press “MENU” to enter the main menu.

Note:“》” indicates that there is a submenu. Press”ENTER” to enter the submenu

Analog Info
BMS Status
Para Setting
Sys Setting
  1. Move the cursor to “Analog info” and press “Enter”

Pack V|
---|---
Im|
Temperature| 》
Cell Voltage| 》

Move the cursor to “Temperature” and press “Enter” to check the battery temperature information, then press “DOWN” to turn the page

T1 XX℃
T2 XX℃
T3 XX℃
T4 XX℃
PCB-T XX℃
ENV-T XX℃

Move the cursor to “Cell Voltage” and press “Enter” to check the battery voltage information, then press “Down” to turn the page

Cell 01 xxxxmV
Cell 02 xxxxmV
Cell 03 xxxxmV
Cell 04 xxxxmV
Cell 05 xxxxmV
Cell 06 xxxxmV
Cell 07 xxxxmV
Cell 08 xxxxmV
Cell 09 xxxxmV
Cell 10 xxxxmV
Cell 11 xxxxmV
Cell 12 xxxxmV
Cell 13 xxxxmV
Cell 14 xxxxmV
Cell 15 xxxxmV

Move the cursor to “CellCapacity” and press “Enter” to check the battery capacity information

SOC X%
FCC XAH
Rm XAH
CC 0
  1. Move the cursor to “BMS Status”, press “Enter” to check the battery status, and press “▼” to turn the page

Status|
---|---
Record|

BMS Status|

Move the cursor to “Record”, then press “Enter” to check the battery alarm information, then press “DOWN” to turn the page.

SCP|
---|---
0/UTP|
0CP|
UVP|
0VP|

Move the cursor to “BMS Status”, then press “Enter” to check the battery protection information, and then press “DOWN” to turn the page.

UV Y/N
UVP Y/N
OC Y/N
OCP Y/N
OT Y/N
OTP Y/N
OV Y/N
OVP Y/N
SCP Y/N
Failure Y/N
  1. Move the cursor to “Para Setting” and press “Enter”to check the gyroscope information, then press “▼” to turn the page.
  2. Move the cursor to “Sys Setting”, then press “Enter” to check the version information, and then press “▼” to turn the page.
  3. Hibernation and activation functions
    • After 1 minute of button-free operation in normal operation, the display will turn off (backlight only), and pressing any button while the screen is off will allow the screen to light up and function normally

Product list and tools

Product packing lists

Home energy storage system series power supply has been strictly inspected before delivery, but may be damaged in transit, therefore, after unpacking the box, please check whether the following items are complete, confirm the model, capacity, input voltage and output voltage, and whether the specified content when ordering; If anything abnormal or inconsistent occurs, please contact the distributor as soon as possible.

TEZE-MB51400-200A-HWB-Roller-Type-Mobile-ESS-Battery-
fig-22

Instruction manual

TEZE-MB51400-200A-HWB-Roller-Type-Mobile-ESS-Battery-
fig-23

  1. Place the battery in an appropriate position, plug the positive/negative connector into the positive/negative socket.
  2. Connect the other end of the positive and negative lead to the inverter.
  3. Turn on the Rocker switch and the Air Switch.

Active Equilibrium Function

Overview

Because the battery capacity, internal resistance, voltage and other parameter values are not completely consistent, this difference causes the battery with the smallest capacity to be easily overcharged and discharged during charging, and the smallest battery capacity becomes smaller after damage, entering a vicious cycle. The performance of single battery directly affects the charge and discharge characteristics of the whole battery and the reduction of battery capacity. BMS without balance function is just a data collector, which is hardly a management system. BMS active equalization function can realize the maximum continuous 1A equalization current.

Transfer the high-energy single battery to the low-energy single battery, or use the whole group of energy to supplement the lowest single battery. During the implementation process, the energy is redistributed through the energy storage link, so as to ensure the battery consistency to the greatest extent, improve the battery life mileage and delay the battery aging.

Technical indicators of the main parameters

TEZE-MB51400-200A-HWB-Roller-Type-Mobile-ESS-Battery-
fig-25

About Us

  • Email
  • TEL/FAX
    • 86-755-23225527
  • FAX: 0755-23225537
  • Whatsapp
    • +86 18814301918
  • Wechat
    • +86 18814301918
  • Add: Building A, Xinida Industrial Park, Junzibu Village,Guanlan Stree, LonghuaDistrict ,Shenzhen, Guangdong

Scan

Documents / Resources

| TEZE MB51400-200A-HWB Roller Type Mobile ESS Battery [pdf] User Guide
MB51400-200A-HWB Roller Type Mobile ESS Battery, MB51400-200A-HWB, Roller Type Mobile ESS Battery, Type Mobile ESS Battery, Mobile ESS Battery, ESS Battery, Battery
---|---

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals