PEAK Balustrade POP_II40 Glass Panels with Heavy Duty Base Installation Guide

June 28, 2024
PEAK Balustrade

POP_II40 Glass Panels with Heavy Duty Base

“`html

Specifications

  • Product: Glass Panels with Base Rail Supports for Glass
    Panel

  • Manufacturer: Peak Products Corporation

  • Fasteners Supplied:

    • 19 mm Pan head self-drilling screw
    • 80 mm Coach screw with washer

Product Usage Instructions

Anchoring Fasteners for Australia

For detailed anchoring fasteners information, refer to:
Peak Aluminium Balustrade Installation Guide

Base Rail Supports for Glass Panel

Deck Structure:

  • Timber: JD3, J3, JD4, J4 Timber (Seasoned/Unseasoned Mixed
    Australian Hardwood, Mixed Softwood, Pine, Radiata, Australia)

  • Concrete: Minimum strength 25 MPa

Fasteners Required:

  • 2 x RamsetTM AnkascrewTM M5 x 30 mm

Minimum End and Edge Distance:

  • Timber: End of Stud – 49 mm, Edge of Stud – 25 mm
  • Concrete: 25 mm (End), 40 mm (Edge)

Glass Panel Installation

This symbol indicates important
information.

  1. Measure and mark the position of all posts and space
    equally.

  2. Maximum post spacing: 1.80 m for 2.5 kPa design wind pressure,
    1.20 m for 4.02 kPa design wind pressure.

  3. Put the first post in position. For timber attachment, secure
    post to deck using four M10 coach screws through each corner of the
    post base. Ensure that the post is plumb.

FAQ

Q: Are the glass panels suitable for outdoor use?

A: Yes, the glass panels are designed for outdoor
applications.

Q: Can the base rail supports be installed on uneven

surfaces?

A: It is recommended to install the base rail supports on level
surfaces for proper stability and support.

“`

Installation Guide
for Glass Panels
with Base Rail Supports for Glass Panel

Tools and Materials Needed

· Mitre saw (recommended) or hacksaw with non-ferrous metal cutting blade
· Spirit level · Measuring tape · Drill · Drill bits for timber: 10 mm

· Drill bits for metal: 3 mm · Philips #2 driver bit · Socket or nutsetter:
8 mm, 17 mm · Adjustable spanner · Dish soap (for glass panels)

Fasteners Supplied

· Non-corrosive exterior silicone caulking
· Anchoring fasteners (see pages 3-4)

19 mm Pan head self-drilling screw

80 mm Coach screw with washer

See our helpful installation videos on our website: peakbalustrade.com.au · peakbalustrade.com.nz
Refer to the Peak Aluminium Balustrade Installation Guide for all other installation requirements

Dear Customer,
We’d like to take a moment to say “thank you and congratulations” for choosing our products. At Peak® your satisfaction is very important to us. That is why we work very hard to provide you with products of exceptional quality, value, and beauty. And that is also why we want to hear from you.
Please contact us with your comments or suggestions at: support@peakproducts.com.au · support@peakproducts.co.nz
Finally, we’d like to remind you to always work safely. Then, take pride, relax with your family and experience years of enjoyment with Peak® products.
Peak Products Corporation

IMPORTANT INFORMATION

· Before beginning work, read this installation guide in its entirety including all warnings and important information.

· This installation guide is updated occasionally. Please refer to the latest version at https://peakproducts.com/en-au/peak-aluminium-balustrade /installation-videos-guides/ https://peakproducts.com/en-nz/peak-aluminium- balustrade/installation-videos-guide/

· Maximum post spacing: decks: 1.80 m stairs: 1.75 m

· For commercial use including multi-residential housing, please contact Peak Customer Service at:
Australia: 1300 734 714 · support@peakproducts.com.au New Zealand: 0800 800 040 · support@peakproducts.co.nz

· Complies with: Australian/New Zealand Standard AS/NZS 1170.0:2002 Structural design actions Conditions apply. For details visit: https://peakproducts.com/en-au/peak-aluminium-balustrade/compliance/ https://peakproducts.com/en-nz/peak-aluminium-balustrade/compliance/ Complete Peak® Aluminium Balustrade system required.
· Always understand and comply with your local building codes.

· To prevent timber splitting and rot, drill pilot holes and coat fastener screw threads with non-corrosive exterior silicone caulking.

· Ensure that the opening between each of the following is less than 100 mm:

– balusters

– glass panels

– balusters and posts

– glass panels and posts

– balusters and walls

– glass panels and walls

– balusters and glass panels – base rail and deck surface

WARNING No representation or warranty is given that your particular application of these products
complies with relevant building codes or that the fasteners provided or used are appropriate for your application. Consult with professionals and local building officials before beginning work: (i) to ensure compliance with relevant building codes for your application and for your proposed use of fasteners; (ii) to ensure the integrity of the structural components in connection with which these products are to be used; (iii) to identify appropriate safety gear that is to be used during installation such as a safety harness when working above ground; (iv) to ensure that the work area is free from utilities, services and hazards; and (v) to clarify any instructions or warnings that may not be clear. Work in a safe manner wearing protective gear such as gloves, eyewear, headwear, footwear and clothing. When using tools comply with operation manuals and instructions. Metal and glass may have sharp edges and could fragment or splinter during or as a result of handling or cutting. Do not use these products in connection with any substance that is or may be harmful or corrosive to the products. Inspect and maintain these products and the structural components that they are used in connection with on a regular basis, using professionals when appropriate.
Peak Products Corporation shall not be liable for any loss or damage resulting from the improper installation or improper use of this product, subject to any contrary provision of the Australian Consumer Law in Australia or the Consumer Guarantees Act in New Zealand. Peak products and associated materials are protected by patents, designs, copyrights and/or trademarks used under license from Peak Innovations Inc.
PB_BRSGP_InstallGuide_V5
2

ANCHORING FASTENERS FOR AUSTRALIA
WARNING Engineering design has determined appropriate fasteners for the attachment of the post base, wall bracket, and base rail support to concrete or timber structures designed by others. While the types of material are defined in the table below, the ability of the supporting structure to provide adequate support to Peak® Aluminium Balustrade system and its fasteners must be independently verified for each installation. To meet certain balustrade load requirements within AS/NZS 1170.1:2002, use the fasteners specified in the tables below. Building codes may vary. Always understand and comply with your local building codes.
For further information visit: https://peakproducts.com/en-au/peak-aluminium- balustrade/compliance/

Deck Structure

POST BASE Typical Anchoring Fasteners

Fasteners Required

Minimum Embedment¹

Minimum End and Edge Distance

JD3 Timber e.g. Seasoned, Mixed Australia Hardwood

4 x M10 Coach Screw²

100 mm

End of Joist: 50 mm Edge of Joist: 40 mm

J3 Timber e.g. Unseasoned, Mixed Australian Hardwood
JD4 Timber e.g. Seasoned, Mixed Softwood Species
J4 Timber e.g. Unseasoned, Pine, Radiata, Australia
Concrete, Minimum strength 25 MPa

4 x M10 Coach Screw²
4 x M10 Coach Screw²
4 x M10 Coach Screw² 4 x RamsetTM WERCS AnkascrewTM or RamsetTM AnkascrewTM, M10 x 100 mm

125 mm 145 mm 185 mm 72 mm

End of Joist: 50 mm Edge of Joist: 40 mm
End of Joist: 50 mm Edge of Joist: 40 mm
End of Joist: 50 mm Edge of Joist: 40 mm
70 mm

BASE RAIL SUPPORTS FOR GLASS PANEL4 Typical Anchoring Fasteners

Deck Structure

Fasteners Required

Minimum Embedment¹

Minimum End and Edge Distance

JD3, J3, JD4, J4 Timber e.g. Seasoned/Unseasoned Mixed Australian Hardwood, Mixed Softwood, Pine, Radiata, Australia

2 x M6 Coach Screw² (provided with product)

35 mm

End of Stud: 49 mm Edge of Stud: 25 mm

Concrete, Minimum strength 25 MPa

2 x RamsetTM AnkascrewTM M5 x 30 mm

25 mm

40 mm

1 Depth of the threaded portion of the screw into the innermost member. 2 Material of steel coach screws shall be given in AS/NZS 4291.1, for property classes 4.6 and 4.8. 3 Material of 14g Type 17 screws shall be given in AS 3566. 4 `Base Rail Supports for Glass Panel’ applications are limited to; maximum AS/NZS 1170.2 Design Ultimate Wind
Pressures of 4.02 kPa; and, AS4055 N1, N2, N3, N4, C1 & C2 buildings based on equivalent wall pressures.
3

GLASS PANEL INSTALLATION
This symbol indicates important information.
Always use two people to handle glass panels. Always lift a glass panel by its sides. Toughened glass is extremely fragile ­ do not bump the edges. Always use protective gear including eyewear and gloves when handling glass panels.
1 Measure and mark the position of all posts and space equally.
Maximum post spacing 1.80 m for 2.5 kPa design wind pressure (1.20 m for 4.02 kPa design wind pressure). For details visit: https://peakproducts.com/en-au /peak-aluminium-balustrade/compliance/ https://peakproducts.com/en-nz/peak- aluminium-balustrade/compliance/
Put the first post in position. For timber attachment, secure post to deck using four M10 coach screws (refer to page 3 for required length) through each corner of the post base. Ensure that the post is plumb.
To prevent splitting of deck boards, drill four 10 mm holes through deck boards (but not into deck structure). To prevent timber rot, coat fastener screw threads with non-corrosive exterior silicon caulking. For concrete attachment, refer to page 3 for anchoring fastener recommendations.

A

B

2

A: Remove the plastic baluster gaskets from both rails.

B: Temporarily position the second

post but do NOT secure it yet.

Cut the hand and base rails to

fit between the posts.

3

A: Cut the glass gaskets the same length as the rails.

A

B: Drill 3 mm holes into the base rail

glass gasket (the smaller gasket)

every 300 mm for water drainage.

C: Press the glass gaskets into the rails.

The smaller of the two glass gaskets goes into the base rail.

4 Position second post and two base rail
supports, then insert handrail and base rail into posts and base rail supports.

B

C

4

5

A: Fasten the second post in place, ensuring that the post is plumb (see

B

step 1 for full details).

A

B: Slide base rail supports to the third

W

positions (space them equally).

C: Secure base rail supports to the base rail using 19 mm pan head self- drilling screws.
D: For timber attachment, fasten base rail

W÷3

W÷3

W÷3

supports to the deck using two 80 mm

coach screws each. C

For concrete attachment, refer

to page 3 for anchoring fastener

recommendations.

To ensure the glass panel remains

D

engaged in the rails, you must

2x

install two base rail supports for

each balustrade section.

2x

6

Secure the rails to both posts with 19 mm pan head self-drilling screws.

7

Install the glass panel by inserting it into the handrail gasket then lowering

it into the base rail gasket.

Ensure that the glass gaskets and the top and bottom edges of the glass panel are well lubricated with liquid soap before installing the glass panel.
Ensure that the glass is fully seated in the gaskets. Wash away excess soap with clean water.
The opening between a glass panel and a post must not exceed 100 mm.
Maximum of one glass panel between posts.

8 Repeat all steps for remaining sections.
Optional: Install post base covers.

5

WALL BRACKET INSTALLATION
This symbol indicates important information.

1

Measure and mark the position of all brackets on the wall.

Maximum wall bracket spacing of 1.80 m.

1005 mm

2

For timber attachment, secure hand and base rail brackets to wall using four M6 coach

screws with washers.

To prevent timber rot, coat fastener screw threads with non-corrosive exterior silicone caulking.

For concrete attachment, refer to pages 3-4 for anchoring fastener recommendations.

60 mm

3 Follow the Glass Panel installation process as shown on pages 4-5.

HORIZONTAL ANGLE BRACKET INSTALLATION
This symbol indicates important information.

1

Measure and mark the hole positions of all brackets on the post.

Maximum post spacing of 1.80 m.

938 mm 46 mm

2

A: Drill 5.5 mm pilot holes at the marked locations.

A

B

B: Attach the hand and base rail

brackets to the post using four

25 mm flat head screws.

Then assemble the base rail bracket

using the connector bolt.

3 Follow the Glass Panel installation process
as shown on pages 4-5.
6

GATE INSTALLATION
B This symbol indicates important information.
Before beginning work, measure and ensure the Gate Opening (W) does not exceed 1150 mm. Then please carefully follow the steps below to ensure the gate is not cut too short for your project.

1

A: Remove latch side of gate frame.

A

B: With latch side of

gate frame removed,

cut top and bottom

gate rails 190 mm

shorter than gate

opening W.

W (1150 mm max.) W minus 190 mm

2

Attach the latch side of the gate frame using

the 19 mm pan head

self-drilling screws.

A

3

A: Align the top of the gate with the top of the post and mark the hole

positions for the hinges on the post.

B: Drill 5.5 mm pilot holes at the

marked positions.

C: Install the top 50 mm coach screw

on each hinge.

D: Install the bottom 50 mm coach

C

screw on each hinge by releasing

the bolt and nut (HINT: do not

completely disassemble hinge).

4

Use 19 mm pan head self drilling screws for these steps:

A

A: Secure the retainer to

the gate at the marked

position.

B: Insert the latch through

the retainer.

C: Secure the latch to the

gate at the marked

position.

B

D: Check and mark the

position for the latch

plate on the post.

Secure the latch plate to

the post.

B D
D C
7

NOTES

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals