Lowes E21005 Rigid Core Vinyl Waterproof Plank Instruction Manual

June 22, 2024
lowes

E21005 Rigid Core Vinyl
Waterproof Plank

Instruction Manual

Installation Instructions

Before You Start/ Preparations
Please read all the instructions before you begin the installation.
Improper installation will void warranty.
Important Notice
After installation. make sure to keep the room within a temperature range of 60°F to 80°F. Excessively high or low temperatures may cause this product to expand or contract and lead to visual defects of the floor that will not be warranted.
Installation in areas with sustained direct sunlight:
In cases where the flooring is in direct sunlight for much of the day (Sunrooms. etc.) it is recommended that the planks be glued down in those spots/areas. The planks are still clicked together as per the floating installation instructions. but an approved premium Luxury Vinyl flooring adhesive should be used in areas as needed. Be sure to follow the adhesive manufacturer’s instructions, including correct trowel size.
For the best result. make sure to always work from 2 to 3 cartons at a time mixing the planks during the installation.
Safety
Always ensure to wear safety glasses, hearing protection and otherpersonal protective equipment during the installation process.
Preparation
Ensure you properly prepare the site prior to installation.
Installotion
Follow the install guidelines for placing and install of all moldings.

  • Calculate the room surface prior to installation and plan an extra 10% of flooring for cutting waste.

  • If the boxes of flooring were exposed over 2 hours to extreme temperatures (under 50 ‘For over 100 • F) within the 12 hours before the installation, acclimation is required. In this case, keep the boards in room temperature for at least 12 hours in unopened package before you start the installation. The room temperature must be maintained consistent between 60 · to 80 · F before and during installation.

  • For floor surfaces exceeding 4000 ft2 and or lengths exceeding 60 ft, use expansion moldings.

  • Inspect your subfloor before you begin. It must be clean and level to 3/16″ within a 10 ft span.

  • Although this floor is waterproof, it is not aimed to be used as a moisture barrier. The subfloor must be dry (max 2.5% moisture content CM method). This product is also not to be installed in areas that have a risk of flooding such as saunas or outdoor areas.

  • You must install a 6-mil poly underlayment before installing the flooring.

  • If this flooring is intended to be installed over an existing wooden floor, it is recommended to repair any loose boards or squeaks before you begin the installation

  • With a floating floor you must always ensure you leave a 1/4″ gap between walls and fixtures such as pipes and pillars. stairs, etc. These gaps will be covered with trim moldings after the floor is installed. Tip: When installing around pipes, drill the holes 3/4″ larger than the diameter of the pipes

  • Decide the installation direction. It is recommended to install the length direction of the planks parallel to the main light direction.

  • It is strongly suggested that upon delivery of product to the jobsite, two or three boxes/bundles be opened and laid out before the end user. The end user/homeowner should compare the contents of each box/bundle to their floor sample to verify that it is the expected product. Reseal these boxes with tape after inspection is completed. If there is any discrepancy between what was expected/purchased and the actual product received, DO NOT PROCEED WITH THE INSTALLATION’ Notify the retailer or contractor immediately.

  • Production runs may vary due to variances in the manufacturing process. Aspen Flooring cannot honor claims due to a lack of on-site product inspection/acceptance by the homeowner/purchaser. Proceeding with the
    installation is an acceptance of the product as delivered.

  • Measure the area to be installed:The board width of the last row shall not be less than 2″. If so, adjust the width of the first row to be installed. In narrow hallways, it is recommended to install the floor parallel to the length of the hall.

  • Inspect each individual plank one by one before installation. No claims on surface defects will be accepted after installation.

  • Due to the speed of sudden temperature changes, which has the potential to negatively affect this flooring, it is not recommended to install over any electrical radiant heating system. Installation over electrical radiant heating systems will not be covered
    by the manufacturer’s heating systems using water. warranty. Below instructions are for radiant

  • Do not use this product over electric coil heater. Ensure the radiant heat surface temperature never exceeds 8l°F. Before installing over newly constructed radiant heat systems, operate the system at maximum capacity to force any residual moisture from the cementitious topping of the radiant heat system. The maximum moisture content of the screed is 1.5% (CM method). Shut down the floor heating at least 48 hours prior to installation. Make sure that the temperature in the room is at least 60°F during installation. It is recommended that the radiant heat be applied in a gradual manner after installing the floor. Refer to the radiant heat system’s manufacturer recommendations for additional guidance ..

Tools Required
·Spacer ·Rubber Mallet ·Ruler ·Pencil ·Tape Measure ·Utility Knife ·6 Mil Poly Underlayment
Step One After thoroughly cleaningthe subfloor. lnstallthe 6-milpoly underlayment Polythenyou should begin laying in the left-hand corner. Place the floorboard 1/4″ from the left wall. Use spacers between the wall and the floorboard.
Step Two Second Plank, first row. Drop the plank and gently press down the end with a rubber mallet so it firmly locks into the previous plank until both are at the same height. Make sure both planks are perfectly aligned. NOTE: If you notice both planks aren’t at the same height or are not well locked together. please follow the disassembling instructions at the bottom of the apage. disassemble and check if ny debris stuck inside the lock is obstructing.
Step Three
WARNING: FAILURE TO PROPERLY LINE UP THE END JOINT AND ATTEMPTING TO FORCE IT IN WHILE OUT OF ALIGNMENT COULD RESULT IN PERMANENT DAMAGE TO THE END JOINT.
Step Four

At the end of the first row. leave an expansion gap of 1/4″ to the wall and measure the length of the last plank to fit.
Step Five To cut the plank, use a simple utility knife and ruler. and with the top side facing up. cut heavily and several times on the same axis.
The knife will not go through the surface but make a deep cut. You can then lift one half of the plank using your other hand to hold down the second placing it very close to the cut. The plank will split naturally.
Step Six Start the second row with the leftover cut part of the last plank of the previous row. This small plank should measure at least 12″. Otherwise. use another plank that should be cut in two. The end joints of each adjoining row should not be closer than 8″ to each other.
Step Seven Click the long side of the plank into the previous degrees. Drop the plank and gently press row and place it tight to the short end of the previous plank with an angle of 30 down the end with a rubber mallet so it firmly locks into the previous plank until both are
at the same height. Make sure both planks are perfectly aligned.
NOTE: If you notice both planks aren’t at the same height or are not well locked together. please follow the disassembling instructions at the bottom of the page. disassemble and check if any debris stuck inside the lock is obstructing.
Step Eight

Helpful Hint
After finishing the installation of the row, use scrap pieces and a small hammer or  rubber mallet to gently tapthe planks into the click of the previous row to make sure they are tightly clicked together and make sure there is no gap between the long side of the planks installed. ANY GAPPING CAN COMPROMISE THE WHOLE
INSTALLATION
Step Nine

After 2-3 rows. Adjust the distance to the front wall by leaving an expansion gap of 1/4″. Always ensure that the end joints are staggered at least 8″. both when in the same row as when from one row to the next one. Step Ten

To lay the last row: position a loose board exactly on top of the last row laid. Place another board on top. with the tongue side touching the wall. Draw a line along the edge of this boards, to mark the first board. Cut along this line to obtain of the required width. Insert this cut board least 2″ wide. The spacers against the wall. The last row should be at can then be removed.
Step Eleven Holes for pipes: measure the diameter of the pipe and drill a hole that is 7 /8″ larger.
Saw off a piece as shown in the figure andlay the board in place on the floor. Then lay the sawed-off piece in place.
Step Twelve Door molding and skirting: lay a board (with the decorative side down) next to the door molding and as shown in the figure. Then slide the floorboard under molding.

Maintenance

  • Sweep or vacuum daily using soft bristle attachments.
  • Clean up spills and excessive liquids immediately.
  • Damp mop as needed & use cleaners recommended with no-wax or oil
  • Protect floor from constant direct sunlight. Close blinds or drapes during peak sunlight hours
  • Use proper floor protection devices such as felt protectors under furniture
  • Use a mat at entrance ways (please ensure the mat doesn’t have rubber backing).
  • Do not use abrasive cleaners, bleach or wax to maintain the floor.
  • Do not drag or slide heavy objects across the floor

Separate the whole row by lifting it up delicately at an angle. To separate the planks, leave them flat on the ground and slide them apart. If planks do not separate easy, you can slightly lift up the planks (5°) when sliding them apart.

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

lowes User Manuals

Related Manuals