FiberWood MIRA0707 Mirage Shed 7 Nordic Grey Instruction Manual
- June 14, 2024
- FiberWood
Table of Contents
FiberWood MIRA0707 Mirage Shed 7 Nordic Grey
INSTALLATION INSTRUCTIONS AND RECOMMENDATIONS
- Remove all parts from the packaging and lay them out on a clean work surface in Zone I/II and III.
- Please read the list of components BEFORE assembly, making sure that no parts are damaged or missing.
- In the unlikely event you receive defective materials, the product warranty does not cover labor. Once you alter a board (cut, rip, rout, screw, etc.) it cannot be returned.
- Assemble all parts according to the instructions published by Fiberwood and do not skip any steps. Since Fiberwood’s limited warranty does not apply to all conditions attributable to improper shed installation.
- For shed construction and handling, please use only the tools listed in the assembly instructions.
- Always wear work gloves, safety glasses, and any other type of long-sleeved clothing during shed assembly or any type of maintenance work.
- Treat wall panels with extreme care before and during assembly. Place them carefully on the ground.
- Avoid walking on them or placing objects on them.
- At least two people are required to assemble the shed.
- Allow sufficient space at the installation site outside the shed to access it from the outside during assembly.
- Do not install in cold or windy weather. Wind direction is an important factor that must be considered when placing the shed on your property. Choose a suitable location where there are no excessive winds to prevent high wind pressure on the doors.
- Due to the high proportion of composite material, the surface may have different color shades. This does not mean that special treatment is required or that it will affect the shed’s lifespan.
- You need to get a tube of 100% transparent silicone sealant.
CARE, MAINTENANCE AND SAFETY INSTRUCTIONS
- The shed is generally used for storing objects. The shed is not especially designed for residential purposes.
- Regularly check the shed for stability and ensure that the shed location is level.
- Be careful when handling parts with metal edges.
- For the construction and handling of the shed, please only use tools that are listed in the assembly instructions.
- Avoid using lawnmowers and mechanical scythe in the immediate vicinity of the shed.
- To clean the shed, start by rinsing it with a garden hose to remove surface debris. Then you can use a soft-bristled brush with warm soapy water.
- Do not damage, gouge, scrape or puncture any surface of the shed, using metal shovels or sharp-edge tools to remove snow and ice on any surface of the garden shed or in any other way. Instead, use a plastic shovel and recommended calcium chloride or rock salt to melt snow and ice.
- Do not paint, stain or apply other coating materials or any other chemical substances, including detergents or pesticides to the shed.
- Clean oil or grease spills as soon as possible and at the latest within seven days. Start by rinsing with a garden hose and use warm soapy water and a soft-bristled brush. If that’s not enough, you can use recommended all-purpose cleaners, including for composite, and follow the manufacturer’s instructions carefully.
- Do not store any hot objects in the shed, such as recently used grills or blowtorches, or any volatile chemicals.
- Do not lean heavy objects against the walls of the shed, as it could deform the entire structure.
- Keep the roof free of snow and accumulated foliage. Large amounts of snow can damage the shed and make it dangerous for entering.
- Ensure there is adequate ventilation in the shed to prevent excess moisture.
- Always keep the doors closed and locked when the composite shed is not in use to avoid any kind of wind damage.
- If there is mold present, you can use a garden hose and warm soapy water with a soft-bristled brush. If that’s not enough, you can use recommended cleaners, including for mold, and follow the manufacturer’s instructions carefully.
- Avoid direct water projection from an automatic watering system onto the composite boards or other parts of the shed, as this water could cause stains where it hits the surface.
PARTS
COMPOSITE SHED THREE-VIEW DRAWING
TOOLS REQUIRED FOR INSTALLATION
GROUND REQUIREMENTS
Composite shed should be installed on the hard ground like concrete foundation, the surface of ground should be flat and the size should follow the dimension of drawing.
Bottom Frames Dimension Drawing.
Install aluminum bottom frames according to dimensions and positions as the sketch map shown above, then fix them with plastic expansion bolts. Please make sure the leveling of the bottom frames.
Install the shed from the front side, please insert column (left & front) and composite wall panel into the groove of aluminum bottom frames, then fasten column and planks with screws. Two operators are required for this step, one needs to hold the column so as to avoid any broken caused by tilt. (We suggest to install composite shed under the calm weather, and more operators are needed if install under windy weather). Use a sealant gun to apply a bead of sealant inside the column, following the red line.
Install the composite wall panel one by one.
Install the column (left & rear) into place. Use a sealant gun to apply a bead of sealant inside the column, following the red line.
-
Insert the aluminum H-shaped beam (left/right) into the column, then install composite wall panel into the place one by one.
-
Install the aluminum column (right & rear) into the place, then insert the aluminum H-shaped beam (rear) into the column. Use a sealant gun to apply a bead of sealant inside the column, following the red line.
-
Install the aluminum column (right & front) into the place, then insert the aluminum H-shaped beam (left/right) into the column. Level, then screw 2 screws per board.
-
Install front composite wall panel and aluminum H-shaped beam (front) into the place.
-
Insert the left and right aluminum door frames into the position, then install the aluminum threshold, and adjust perpendicularity and dimension between the two frames shown as the above sketch map.
-
After adjustement, please fix the composite wall panels, aluminum bottom frames and aluminum H-shaped beams with screws, four screws are required in the connection of every composite wall panels with bottom frames and beams.
-
Install windows into the place. (Please note different sides of window, the side with rivets should be toward the inside)
-
Fasten the window with columns and H-shaped beams by using screws.
-
Connect the aluminum beams with L brackets by applying screws in advance.
-
Connect the aluminum beams with window (left & right side) by using (B)-screws.
-
Install the PVC roof panel, the extension length of roof panel should be 2.20” in the shed’s front side, while the left and right side should be 4.845”. Please note that the length of screws for roof panels fixing is different from those for the connection with aluminum beams.
IMPORTANT : When installing the roof, you must respect the measurements on page 19. When the panels are installed, screw a first screw on the right and another on the left, respecting the measurements on page 19. Make a line at using a chalk-line or a level to be sure to follow the aluminum beam of the roof and put the screw in it.
-
Install roof tiles one by one, please pay attention to the connection method shown as the above sketch map.
-
Install all aluminum fascia boards in line with the diagram as above.
-
Insert the small stick into the regulating hole, then move the stick to left. Take out the locating pin, then put the door to the door frame position, and raise the door to suitable height by putting a brick or other objects underneath the door, and apply a drill to drill holes and fix with screws. Close the door firstly, then insert the small stick into the regulating hole again, and move the stick to left. Adjust suitable strength in accordance with the door’s weight, finally, insert the locating pin.
-
Install the latch of door.
-
Install the door lock, then cut the first section of the safety latch block.
IMPORTANT
To prevent water infiltration issues, you must add a sealant at the bottom of the shed:
- Perform a thorough cleaning of the shed: remove any dust and debris from the floor and ensure the floor is completely dry.
- Apply a bead of sealant all around the interior of the shed between the floor and the bottom aluminum frames (refer to page #10 in the installation guide).
- Apply a bead of sealant all around the interior of the shed between the composite wall and the bottom aluminum frames as well.
- Apply a sealant from the floor upwards with a minimum of 4 inches in all corners. It is recommended to use a sealant of the Flextra type (thermoplastic rubber-based).
WARRANTY
Scan the QR code to find out about all your shed’s warranty in the SUPPORT section on the Fiberwood website. Scannez le code QR pour découvrir tous les détails concernant la garantie de votre cabanon dans la section SUPPORT sur le site de Fiberwood.
For any problem with your shed, please contact us directly at:
Toll Free :888-360-1866
829, boul. Industriel, Bois-des-Filion, QC, J6Z 4T3 –
info@fiberwood.ca
829, Industriel Blvd, Bois-des-Filion, Quebec, Canada, J6Z 4T3.
514-360-1866 /
888-360-1866.
fiberwood.ca
Documents / Resources
|
FiberWood MIRA0707 Mirage Shed 7 Nordic
Grey
[pdf] Instruction Manual
MIRA0707 Mirage Shed 7 Nordic Grey, Mirage Shed 7 Nordic Grey, Shed 7 Nordic
Grey, Nordic Grey, Grey
---|---
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>