WKE 200-400 Junction Box
Instructions
WKE 200-400 Junction Box
Installation on wall and ceiling
The WKE 200-400 SL is installed on the wall and on the ceiling as described in
the “General building inspection test certificate” (AbP-Nr. P-1040 DMT DO).
The screw anchors that come with a fire protection approval are approved for
cracked and uncracked concrete of strength categories C20/25 to C50/60 (See
Figures 01 and 02). Drainage openings must be integrated as needed as per DIN
EN 60670.
Connection of lines (depending on the enclosure size)
Rated cross section| Cable cross section (single wire)| Push-in Cage Clamp
(directly pluggable)| Strip length| Rated insulation voltage| Rated current|
Power loss
---|---|---|---|---|---|---
mm2| mm2
0,5 – 6| mm2
2,5 – 6| mm
13 – 15| 600V| 41 A|
6
10| 0,5 – 10| 4-10| 17 – 19| 600V| 57A|
16| 0,5 – 16| 6-16| 18 – 20| 600V| 76A|
6mm2 (Sicherungsklemme / fuse terminal block)| 0,2 – 6| | 12-13| 500 V| 10 A|
2,5 W
Cable gland| Sealing area
---|---
M20| 6 – 13
M25| 6 – 15
M32| 9 – 19
M40| 17 – 27
M50| 23 – 34
Günther Spelsberg GmbH + Co. KG
Im Gewerbepark 1, D-58579 Schalksmühle
Phone: +49 2355 892-0
Fax: +49 2355 892-299
E-Mail: info@spelsberg.de
Internet: www.spelsberg.de