Before you start using this product please follow these basic guidelines:
Please carefully read the manual before beginning with the installation process!
The EK Fittings require only a small amount of force to screw them firmly in place since the liquid seal is ensured by the rubber O-ring gaskets.
The use of corrosion inhibiting coolants is always recommended for any liquid cooling system. EKWB recommends any of the EKCryofuel for worry-free usage.

BOX CONTENTS

EK Water Blocks Reflection2 PC O11D XL D5 PWM D RGB - FIGURE
1EK-Quantum Reflection² PC-O11D XL D5 PWM D-RGB
Mounting Mechanism EAN: 105250

EK Water Blocks Reflection2 PC O11D XL D5 PWM D RGB - FIGURE
2

DISTRIBUTION PLATE DIMENSIONS

EK Water Blocks Reflection2 PC O11D XL D5 PWM D RGB - FIGURE
3

TECHNICAL SPECIFICATIONS AND PRODUCT PARTS

EK Water Blocks Reflection2 PC O11D XL D5 PWM D RGB - FIGURE
4

Technical Specification:
Dimensions with the attached pump (W x D x H): 215.1 x 77.8 x 471.9 mm

  • D-RGB LED count:
  • D-RGB cable length: 500 mm
  • D-RGB connector standard 3-pin (+5V, Data, Blocked, Ground)
Position EAN Description Quantity
1 104634 TOP Plexi -(Block part) 1
2 104635 TOP Plexi  (Lid part) 1
3 104639 LED Cover (Black e.) 1
4 104642 Metal plate (Black) 1
5 104644 Metal holder (Black) 2
6 104599 Mylar sticker 2
7 100663 EK – Badge 2
8 9061 Screw  M3 x 25 DIN7991 5
9 9017 Screw M3 x 18 7991DIN 2
10 9023 Screw  M4 x 6 DIN7984 4
11 8312 Screw  M4 x 16 DIN7991 64
12 8311 Screw  M4 x 20 DIN7984 4
13 101803 Pump holder 1
14 5154 OR 52 x3 NBR50 1
15 3.831E+12 EK D5 Pump 1
16 102639 EK – Plug G1/4 14
17 104697 OR – 438 x 2 mm 1
18 104698 OR -105 x 2 mm 1
19 104699 OR – 90 x 2 mm 1
20 104700 OR -140 x 2 mm 1
21 104701 OR -77 x 2 mm 1
22 104702 OR -61 x 2 mm 1
23 104703 OR – 85 x 2 mm 1
24 104704 OR -65 x 2 mm 1
25 100815 LED D-RGB strip 800/600 mm 1
26 3.831E+12 Push in adapter 6
27 3.831E+12 Plug cover (Acetal) 14

PREPARING THE 011D XL CHASSIS

Before installing the distribution plate, carefully read the PC case manual.
STEP 1
Unscrew the factory provided screws and remove the top panel from the case.

EK Water Blocks Reflection2 PC O11D XL D5 PWM D RGB - FIGURE
5

STEP 2
Remove both side panels and the front panel from the case.

EK Water Blocks Reflection2 PC O11D XL D5 PWM D RGB - FIGURE
6

STEP 3
The SSD Trays also need to be removed from the back side of the chassis. Once the distribution plate is secured they can be reinstalled as required.

EK Water Blocks Reflection2 PC O11D XL D5 PWM D RGB - FIGURE
7

STEP 4
Unscrew the 2(two) marked factory screws and remove the bottom Radiator bracket.

EK Water Blocks Reflection2 PC O11D XL D5 PWM D RGB - FIGURE
8

STEP 5
From the original bottom Radiator bracket, remove two (2) marked plastic tabs attached by four (4) cross pattern screws.

EK Water Blocks Reflection2 PC O11D XL D5 PWM D RGB - FIGURE
9

Plastic tabs and screws reattach to the replacement bottom Radiator bracket and secure them with Philips head screwdriver. Tighten the screws evenly.
After securing the distribution plate, replacement bottom Radiator bracket can be installed with the bottom radiator and fans.

PREPARING AND INSTALLING THE DISTRIBUTION PLATE

STEP 1
Before installing the distribution plate, unscrew two (2) M3 x 18 DIN7991 Screws and remove the metal plate. Save the removed parts for later steps.
For this step you will need:

EK Water Blocks Reflection2 PC O11D XL D5 PWM D RGB - FIGURE
10

STEP 2
Carefully place the EK-Quantum Reflection PC-O11D XL D5 PWM D-RGB distribution plate into the PC case and align the mounting holes.

EK Water Blocks Reflection2 PC O11D XL D5 PWM D RGB - FIGURE
12

STEP 3
Secure the distribution plate to the chassis with two (2) M4 x 8 DIN7984 and M4 nuts (as shown in the diagram).

EK Water Blocks Reflection2 PC O11D XL D5 PWM D RGB - FIGURE
13

STEP 4
After the distribution plate is secured, the stored metal plate can be reattached using two (2) M3 x 18 DIN7991 Screws. Tighten the screws evenly.
For this step you will need:

EK Water Blocks Reflection2 PC O11D XL D5 PWM D RGB - FIGURE
14

RECOMMENDED DISTRIBUTION PLATE CONFIGURATIONS

EK Water Blocks Reflection2 PC O11D XL D5 PWM D RGB - FIGURE
16

To complete your loop, all ports must be used as marked in the image.
All remaining unused ports must be closed with supplied plugs, using the EK- Loop Multi Allen Key.
If one of the prescribed components will not be installed (ie. bottom radiator or GPU block) then one INLET and one OUTLET port must still be joined together in order for this distribution plate to function!
Only one INLET and one OUTLET port for the GPU connection can be used, while all other INLET and OUTLET GPU ports must be closed with G1/4 plugs (enclosed in the package).

EK Water Blocks Reflection2 PC O11D XL D5 PWM D RGB - FIGURE
17

ATTACHING THE PUSH-IN ADAPTER (OPTIONAL)

EK Water Blocks Reflection2 PC O11D XL D5 PWM D RGB - FIGURE
18

The push-in adapters can be attached to the marked places in the diagram.
For easier installation of the push-in adapters, EK recommends to lubricate the O-rings with a few drops of coolant or water.

CONNECTING THE D-RGB LED STRIP

EK Water Blocks Reflection2 PC O11D XL D5 PWM D RGB - FIGURE
19

Plug the 3-pin connector of the distribution plate D-RGB LED light to the D-RGB HEADER on the motherboard. The LED will work if the pin layout on the header is as follows: +5V, Digital, Empty, Ground.

CONNECTING THE PUMP

EK Water Blocks Reflection2 PC O11D XL D5 PWM D RGB - FIGURE
20

The EK-D5 PWM pump has two connectors.

  1. SATA Connector: It must be connected directly to your PSU at all times as it is used to power the pump.
  2. 4-pin PWM fan: It can be connected to your motherboard’s CPU_ Fan or designated water pump header. It can also be connected to a controller. This cable is used to control and report the rotational speed of the pump. If it’s not connected, the pump will run at maximum speed (100% PWM).

TESTING THE LOOP
To make sure the installation of EK components was successful, we recommend you perform a leak test for 24 hours.
When your loop is complete and filled with coolant, connect the pump to a PSU outside of your system. Do not connect power to any of the other components. Turn on the PSU and let the pump run continuously. It is normal for the coolant level to drop during this process as air collects in the distribution plate.
Inspect all parts of the loop, and in the eventuality that coolant leaks, fix the issue and repeat the testing process. Ensure that all hardware is dry before the system is powered on in order to prevent any damage.

SUPPORT AND SERVICE
In case you need assistance or wish to order spare parts or a new mounting mechanism, please contact: https://www.ekwb.com/customer-support/
For spare parts orders, refer to the page with “TECHNICAL SPECIFICATIONS AND PRODUCT PARTS” where you can find the EAN number of each part you might need.
Include the EAN number with quantity in your request. Mounting Mechanism EAN can be found under “BOX CONTENTS”
Thermal pads are readily available in the EK shop

SOCIAL MEDIA
EKWaterBlocks
@EKWaterBlocks
ekwaterblocks
****EKWBofficial
ekwaterblocks

EK Water LOGO

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals