Penn Lighting Associates Soffit Under cabinet LED Task Light Installation Guide
- June 3, 2024
- Penn Lighting Associates
Table of Contents
Penn Lighting Associates Soffit Under cabinet LED Task Light
PARTS/TOOLS NEEDED
IMPORTANT SAFETY INSTRUCTIONS. READ CAREFULLY FOR YOUR PROTECTION AND SAVE ALL INSTRUCTIONS
- Disconnect power before installing, adding or changing any component.
- To avoid a hazard to children, account for all parts and destroy all packing materials.
- Use only with UL approved power supply.
Wood Overhead Installation
Clean the mounting surface with a 50/50 mixture of alcohol and water prior to
installation. For more detailed instructions* please refer to the 3M website.
The light and switch will come with the mounting plates (optional mounting
screws included) already attached to the light, simply remove the tape backing
and press in place
Metal Overhead Installation
If installing on a metal overhead, remove the mounting plates and attach the light and switch to the overhead
- Plug the connector on the power supply cord into the light. If using the larger power supply you will also need to plug in the cord on it as well.
- The wire management clip will come pre-installed on the wire. Install by removing the paper backing and pressing in place
- If using more than one light, plug the jumper cable into the ends of the lights. Plug in power supply and turn on lights. Attach wire clips as required to secure wire.
3030 Corporate Grove Dr.
Hudsonville, MI 49426
Phone: 616.396.1355
itc-us.com
For warranty information please visit www.itc-us.com/warranty-return-
policy
DOC #: 710-00058 • Rev E • 04/09/18
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>