Danfoss AQ111586461567 Outdoor Heating Mats and Cables Installation Guide
- June 8, 2024
- Danfoss
Table of Contents
Danfoss AQ111586461567 Outdoor Heating Mats and Cables
Introduction
In this installation manual, the word “element” refers to both heating cables and heating mats.
- If the words “heating cable” or “heating mat” are used, the instruction in question applies only to this type of element.
The intended uses of the heating elements covered by this installation manual are shown in the following.
For other applications please contact your local sales Office.
Safety Instructions
Never cut or shorten the heating element
-
Cutting the heating element will void the warranty.
-
Cold leads can be shortened to suit requirements.
Elements must always be installed according to local building regulations and wiring rules as well as the guidelines in this installation manual.
-
Any other installation may hamper element functionality or constitute a safety risk, and will void the warranty.
Elements must always be connected by an authorised electrician using a fixed connection. -
De-energize all power circuits before installation and service.
-
Each heating element screen must be earthed in accordance with local electricity regulations and connected to a residual current device (RCD).
-
RCD trip rating is max. 30 mA.
-
Heating elements must be connected via a switch providing all pole disconnection.
-
The element must be equipped with a correctly sized fuse or circuit breaker according to local regulations.
The presence of a heating element must
- be made evident by affixing caution signs or markings at the power connection fittings and/or frequently along the circuit line where clearly visible
- be stated in any electrical documentation following the installation.
**Never exceed the maximum heat density (W/m2 or W/m) for the actual application.
Installation guidelines
** Prepare the installation site properly by removing sharp objects, dirt,
etc.
Regularly measure ohmic resistance and insulation resistance before, during
and after installation
Do not lay heating elements under walls and fixed obstacles. Min. 6 cm space
is required.
Keep elements clear of insulation material, other heating sources and
expansion joints.
Elements may not touch or cross themselves or other elements and must be
evenly distributed on area’s
The elements and especially the connection must be protected from stress and
strain.
The element should be temperature controlled and not operate at ambient
temperature higher than 10°C in outdoor applications.
- Store in a dry, warm place at temperatures between +5 °C to +30 °C.
System overview
Standards | ECsafe | ECsnow (EFTCC) | ECasphalt (DTIK) | ECsport (DSM3) |
---|---|---|---|---|
60800:2009 (cable) | M2 | M2 | M2 | M2 |
M2
For use in applications with high risk of mechanical damage.
Product selection: | ECsafe | ECsnow (EFTCC) | ECasphalt (DTIK) | ECsport (DSM3) |
---|---|---|---|---|
Frost protection of roof and gutter systems | + | + | – | – |
Snow and ice melting on ground areas | (+) | + | + | + |
Field / seed bed heating | – | + | – | + |
Calculating C-C distance for heating cables
The C-C distance is the distance in centimetres from the centre of one cable
to the centre of the next.
For heating of gutters, please refer to the number of cables per metre, see
section 3.1.
C – C [cm] = Area [m2] x 100 cm Cable length [m]
or
C – C[cm] = Cable output [W/m] x 100 cm Heat density [W/m2]
Max. C-C distance
Roof and gutter systems | 10 cm |
---|---|
Ground areas | 20 cm |
Field / seed bed heating | 25 cm |
- Heating cable bending diameter must be at least 6 times cable diameter.
- The actual cable length may vary +/- 2 %.
230V/400V
C-C [cm]| W/m² @ 20 W/m| W/m² @ 25 W/m W/m| ² @ 30 W/m
5| 400| 500| –
7,5| 267| 333| 400
10| 200| 250| 300
12,5| 160| 200| 240
15| 133| 167| 200
20| 100| 125| 150
25| 80| 100| 120
Planning the installation
Draw a sketch of the installation showing
- element layout
- cold leads and connections
- unction box/cable well (if applicable)
- sensor
- connection box
- thermostat
Save the sketch
- Knowing the exact location of these components makes subsequent troubleshooting
and repair of faulty elements easier.
Please observe the following:
- Observe all guidelines – see section 1.2.
- Observe correct C-C distance (heating cables only) – see section 1.4.
- Observe required installation depth and possible mechanical protection of cold leads according to local regulations.
- When installing more than one element, never wire elements in series but route all cold leads in parallel to the connection box.
- For single conductor cables, both cold leads must be connected to the connection box.
Preparing the installation area
- Remove all traces of old installations, if applicable.
- Ensure that the installation surface is even, stable, smooth, dry and clean.
- If necessary, fill out gaps around pipes, drains and walls.
- There must be no sharp edges, dirt or foreign objects.
Installing Elements
It is not recommended to install elements at temperatures below -5 °C.
At low temperatures, heating cables can become rigid. After rolling out the
element, briefly connect it to the mains supply to soften the cable before
fastening.
Measuring resistance
Measure, verify and record element resistance during installation.
- After unpacking
- After fastening the elements
- After the installation in finalized
f ohmic resistance and insulation resistance are not as labelled, the element must be replaced.
- The ohmic resistance must be within -5 to +10 % of the value labelled.
- The insulation resistance should read >20 MΩ after one minute at min. 500V DC.
Installing heating elements
Observe all instructions and guidelines, see section 1.1 and see section 1.2.
Heating elements
- Position the heating element so that it is at least half the C-C distance from obstacles.
- Elements must always be in good contact with the heat distributor (e.g. concrete), see section 3 for details.
Heating mats
- Roll out heating mats with the heating cables facing up. If this is an asphalt application roll out the heating mats with plastic mesh over the heating cables.
- When the heating mat reaches the area boundary, cut the liner/net and turn the mat before rolling it back.
Extending cold leads
- Avoid extending cold leads if possible. Wire cold leads to e.g. junction boxes or cable wells.
- Be aware of power loss in the cable according to local regulations.
Sensor installation
- The sensor should be mounted in an insulating conduit, sealed at the end, for easy replacement of the sensor if required.
- The sensor must be considered a LIVE cable; therefore any extension made to the sensor wiring should be treated in the same way as normal mains voltage cabling.
- The sensor can be extended up to a total of 50 m using 1.5 mm2 installation cable.
- The minimum bending radius for the pipe is 50 mm (1).
- The sensor cable must be placed between two loops of the heating cable (2).
- Route the conduit to the connection box.
Applications
Frost protection of roof and gutters
- Roof Edge /Eave
- Gutter
- Downpipe to Frost-free Well
- Gutter Valley
- Flat Roof with Drain
- Roof with Baffles
- Downpipe with Open End
To provide sucient heat in gutters and down pipes, the heat density and the
number of cable
lines [n] depends on:
- design temperature
- the gutter/pipe diameter
Gutter/pipe diameter | No. of cable lines [n] |
---|---|
75 – 120 mm | 1 |
120 – 150 mm | 2* |
150 – 200 mm | 3 |
- Two lines of 30 W/m (60 W/m) require minimum
Ø120 mm downpipe and a moisture sensitive controller, e.g. ECtemp 850.
Design temperature| Heat density| ECsnow 20T (EFTCC)| ECsnow 30T (EFTCC)|
ECsafe 20T (EFTPC)
---|---|---|---|---
[°C]| W/m2| [n]| [C-C in cm]| [n]| [C-C in cm]| [n]| [C-C in cm
0 to -5| 200 – 250| 1| 9| –| –| 1| 9
6 to -15| 250 – 300| 2| 7 – 8| 1| 12| 2| 7-8
16 to -25| 300 – 350| 2| 6| 2| 10| 2| 6
26 to -35| 350 – 400| 4| 5| 2| 8| 3| 5
Installation summary.
Install ECtemp 850 sensor, if any, in gutter according to sensor manual.
Extend sensor cables and cold leads, and place connections in a dry place. Seal all penetrations through e.g. roofs and walls.
Inform the end user to check for and remove sharp edges, leaves, and dirt from the heated roof and gutter systems ever yautumn.
Snow melting on ground areas
Free constructions, e.g. platforms, steps, bridges, and terraces
- Top layer of concrete slab or mastic asphalt.
- Heating cable.
- Danfoss CLIP fastening accessory or mesh reinforcement.
- Underlying free construction.
- Insulation (optional)
Ground areas, e.g. ramps and car parks
- Top layer of concrete slab or asphalt concrete.
- Sand bed or concrete or asphalt concrete.
- Heating cable.
- Danfoss CLIP fastening accessory or mesh reinforcement.
- Supporting layer of crushed stones/concrete /old asphalt.
- Insulation (optional, ensure supporting layer is suitable).
- Soil.
Ground areas, e.g. driveways, walkways, and pavements
- Top layer of pavement blocks or concrete slab
- Sand bed
- Heating cable
- Danfoss CLIP fastening accessory or mesh reinforcement
- Supporting layer of crushed stones
- Insulation (optional, ensure supporting layer is suitable)
- Soil
Ground thermostat is mandatory
- In sand bed: mat output from 250 W/m2 and cable output from 25 W/m.
- In mastic asphalt or concrete bed: cable output from 30 W/m with a heat density > 500 W/m2 (C-C < 6 cm) (ECasphalt (DTIK))
Limited power supply
- Reduce the area to be heated, e.g. by heating tire tracks instead of the whole driveway.
- Divide and prioritise the area into 2 zones by means of ECtemp 850 .
- Install less W/m² than recommended. Snow melting performance will be reduced. Do not install less W/m2 than recommended in areas of drainage, e.g. in front of heated steps.
Do not install cables in sand only
- The heating cables must be protected by a hard top layer
Embedding in concrete, mortar or screed
- The bedding must not contain sharp stones.
- Must be sufficiently wet, homogeneous, free of air voids:
- Pour at a moderate delivery speed to avoid displacement of the element.
- Avoid excessive use of rakes, shovels, vibrators, and rollers.
- Allow a drying time of approximately 30 days for concrete and 7 days for moulding compounds.
Embedding in mastic or asphalt concrete (road asphalt)
- Use ECasphalt (DTIK) only, fully embedded.
- Use mastic asphalt cooled down to max. 240°Co
- 3 cm hand rolled asphalt concrete (max. 8 mm. stone size), cooled down to max. 80°C before applying a second layer with a max. 500 kg drum size (no vibrator).
- Apply ground sensor dummy Ø100 x H 100 mm, made from heat resistant material, e.g. cellular glass insulation.
- Apply Sensor conduit 5/8”-3/4” made from heat resistant material, e.g. metal.
Installation summary
Prepare installation surface with Danfoss CLIP fastening accessories and/or mesh reinforcement. Fix conduit for sensor cable and sensor tube/dummy for ECtemp 850 sensor, if any.
Extend cold leads with connection sets and place connections in a dry place. Seal all penetrations through walls or similar structures. Apply caution tape above cold leads.
After laying blocks or pouring concrete/asphalt, install external sensor(s), and extend sensor cable(s) according to sensor manual.
Field/seed bed heating
A heated field is considered a workplace e.g
- football pitches
- golf greens
- greenhouses
Safety instruction, see section 1.1.
The installation depth must always be considered carefully
- Agree with local electrical and safety authorities before installing the cables.
- Observe local requirements for installation depth, possible mechanical protection for cold leads and markings.
- Observe insertion depth of objects like lawn aerators, vertidrains, spades, javelins, pegs, anchor bolts etc.
- For efficient heating the installation depth should be max. 25-30 cm.
- Any work in the soil after installation must be done by instructed personnel only.
Field/seed bed heating should be established with multiple zones, depending on field size, sun and shadow. Each zone must be provided with
- 2 x sensors or 1 sensor probe for measuring average top soil temperature.
- Sealed junction box or cable well for connecting cold leads to power supply.
- Max distance to junction box or cable well 20 m from each zone.
Free constructions, e.g. platforms, steps, bridges, and terraces
- Grass.
- Topsoil.
- Sensor in steel conduit.
- Sand/soil.
- Heating cable.
- Fitting band (for installation on new constructions).
- Ground with drainage system
Installation summary
Roll out and fix elements on base construction. For retrofit installation cables can be plowed into the soil.
Fix conduit as high as possible for sensor cables or sensor probe in each zone
Wire cold leads in cable trench in 1 layer only (no bundling, no pipes). Apply caution tape above cold leads and cover with sand. Connect cold leads and sensors to sealed junction boxes or cable wells max. 20 m from each zone.
Optional settings
If the element is connected to a thermostat such as a EC temp, configure basic settings according to the table below and as described in the thermostat installation manual.
If applicable, adjust the temperature limit in accordance with the manufacturer’s recommendations in order to prevent damage.
| | | |
---|---|---|---|---
Thermostat| Max. load| Frost protection of roof and gutter systems|
Snow and ice melting on ground areas| Field/seed bed heating
ECtemp 316| 16A| -7° C < On < +3° C| –|
ECtemp 330| 16A| On < +3° C| On < +3° C| Defrosting +3° C Growing +7° C
ECtemp 610| 10A| On < +3° C| On < +3° C|
ECtemp 850| 2 x 15A| Melting < +3° C| Melting < +3° C Standby < -3° C|
- Heating cable
- Thermostat
- Sensor
- Screen
- RCD
- All-pole switch
- Fuse
- Junction box
Danfoss A/S Nordborgvej 81 6430 Nordborg, Syddanmark Denmark
DanfossA/S
Climate Solutions• danfoss.com • +45 7488 2222
Any information, including, but not l limited to information on selection of
product, its application or use, product design, weight, dimensions, capacity
or any other technical data in product manuals, catalogues descriptions,
advertisements, etc. and whether made available in writing, orally,
electronically, online or via download, shall be considered informative, and
is only binding if and to the extent, explicit reference is made in a
quotation or order confirmation. Danfoss cannot accept any responsibility for
possible errors in catalogues, brochures, videos and other material. Danfoss
reserves the right to alter its products without notice. This also applies to
products ordered but not delivered provided that such alterations can be made
without changes to form, fit or function of the product.
All trademarks in this material are property of Danfoss A/Sor Danfoss group
companies. Danfoss and the Danfoss logo are trademarks of Danfoss A/S. All
rights reserved.
088L0805 & AQ111586461567en-020501 Produced by Danfoss © 05/2024
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>