Goetland Installation Guide
- June 7, 2024
- Goetland
Table of Contents
Goetland
Installation
Step 1: Fixed the silicone sealing ring on the stainless steel keg in
case of the air leaking. And ensure the thermometer is fixed also (It’s
installed while produce in our factory).
Step 2: Cover the lid and fasten with the 4 locks to make sure the thump
keg is sealed entirely. Put the copper pipe on top of the cover just like the
photo shown.
Step 3: Condenser
Step 4: Thump Keg: for double condenser model, there will also be silicone
sealing ring and fasten lock.
Step 5: Connecting the thump keg and the condenser as the image
shown.
Attention: On the first time of using this product set, please boil the water and then sterilize the keg with alcohol or vinegar. The first distilled liquid should be throw away, otherwise there will be some strange taste after the sterilization and may affect the flavor.
Usage:
Step 1: open the lid, pour the water in.
Step 2: cover the lid, connect the condenser with the fermentation keg
and the silicone connection tube.
Step 3:
The silicone tube connects the upper mouth of the condenser and the cold water faucet, another tube connects the nether mouth of the condenser. (The cold water in from the upper tube, the hot water out from the below mouth).
Step 4: Heating the thump keg. Turn on the cold water faucet when the
steaming temperature up to 90℃ and let the cold water in via the silicone
tube.
Step 5: Collect the distilled water
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>