Goetland Installation Guide

June 7, 2024
Goetland

logo

Goetland

product

Installation

Step 1: Fixed the silicone sealing ring on the stainless steel keg in case of the air leaking. And ensure the thermometer is fixed also (It’s installed while produce in our factory).image 1

Step 2: Cover the lid and fasten with the 4 locks to make sure the thump keg is sealed entirely. Put the copper pipe on top of the cover just like the photo shown.image 2

Step 3: Condenser image 3

Step 4: Thump Keg: for double condenser model, there will also be silicone sealing ring and fasten lock.image 4

Step 5: Connecting the thump keg and the condenser as the image shown.image 5

Attention: On the first time of using this product set, please boil the water and then sterilize the keg with alcohol or vinegar. The first distilled liquid should be throw away, otherwise there will be some strange taste after the sterilization and may affect the flavor.

Usage:

Step 1: open the lid, pour the water in.image 6

Step 2: cover the lid, connect the condenser with the fermentation keg and the silicone connection tube.image 7

Step 3:image 8

The silicone tube connects the upper mouth of the condenser and the cold water faucet, another tube connects the nether mouth of the condenser. (The cold water in from the upper tube, the hot water out from the below mouth).

Step 4: Heating the thump keg. Turn on the cold water faucet when the steaming temperature up to 90℃ and let the cold water in via the silicone tube.image 9

Step 5: Collect the distilled waterimage 10logo

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals