Safety Guidelines
- Follow the installation instructions.
- Use the appliance
- according to its intended use
- in good condition
- with due regard to safety and risk of danger.
- Note that the appliance is exclusively for use in the applications detailed in these installation instructions (see 2 Technical Data). Any other use will not be considered to comply with requirements and would invalidate the warranty.
- Please take note that any assembly, commissioning, servicing and adjustment work may only be carried out by authorized persons.
- Immediately rectify any malfunctions which may influence safety.
Technical Data
E121S
Media
Medium:| Water
Operating temperatures
Max. operating temperature medium:| 150 °C
(not suitable for steam)
Pressure values
Nominal pressure:| 10 bar
Max. operating pressure:| 0.5 – 10 bar
Connections/Sizes
Connection sizes:| G3/8″ or G1/2″
E125S
Media
Medium:| Water or water-glycol mixture, quality according to VDI 2035 (up to
50 % glycol)
Operating temperatures
Max. operating temperature medium:| 150 °C*
Pressure values
Max. operating pressure:| 0.5 – 10 bar
Nominal pressure:| max. 18 bar
Connections/Sizes
Connection sizes:| G 3/8″ or G 1/2″
***** Not suitable for steam
Options
For Options visit homecomfort.resideo.com/europe
Assembly
Installation Guidelines
Install at the highest points of the system, as well as anywhere where air
accumulations can form
- Installation in the flow pipe on the pressure side of the pump is recommended
- The valve cap should remain on the air vent in order to prevent functional disruption due to dirt particles that have entered from the outside
- Therefore the air vent is drip free
Assembly instructions
- Blow out or rinse pipe line out well
- Mount shut-off valve under the air vent
- enables maintenance without emptying the system
- The air vent must be installed vertically
- The lower part of the shut-off valve must be installed in a sufficiently large free cross-section of the pipe
- Sealing is produced by means of the O-rings (3/8″) or sealing’s (1/2″) at the housing floor
Commissioning
- Open knurled cap two rotations
Maintenance
In order to comply with EN 806-5, water fixtures must be inspected and serviced on an annual basis. As all maintenance work must be carried out by an installation company, it is recommended that a servicing contract should be taken out. In accordance with EN 806-5, the following measures must be taken:
Inspection
The air vent must be examined regularly, since malfunctions can occur due to
dirt accumulation
Disposal
Observe the local requirements regarding correct waste recycling/disposal!
Accessories
For Accessories visit
homecomfort.resideo.com/europe
Manufactured for and on behalf of Pittway Sàrl, Z.A., La Pièce 4, 1180 Rolle,
Switzerland by its authorised representative Ademco 1 GmbH
For more information
homecomfort.resideo.com/europe
Ademco 1 GmbH, Hardhofweg 40, 74821 MOSBACH, GERMANY Phone: +49 6261 810 Fax:
+49 6261 81309
© 2020 Resideo Technologies, Inc. All rights reserved. Subject to change.
MU1H-13059GE23 R0420
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>