IC Chip LTA1002 Patch 8 feet Installation Guide

June 7, 2024
IC Chip

1. slotting in the wall the depth of hole is from 80 to 95mm

slotting in the wall

2. put the installation box in the slot and connect water pipe

2 put the installation box

3. connect the pipes according to functions

outlet 2 -B

4. put the installation box, and drill holes on the wall, insert the plastic expansile screws

4 put the installation box

5. tight self-tapping screws

5 tight self-tapping screws

6. take out the two caps, install handles, do water testing make sure there is no leakage problem

6 take out the two caps

7. uninstall the handles, and replace the caps, then cement up the wall

7 uninstall the handles

8. tile the wall

8 tile the wall

9. cut the bulged edge

9 cut the bulged edge

10. take out the caps, install the plate

10 take out the caps

11. install the handles, lock screw of handles with inner hex key screw

11 install the handles

INSTALLATION MANUAL LTA1002

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals