KOHLER Mira Atom ERD Thermostatic Bar Valve User Guide

June 7, 2024
Kohler

KOHLER Mira Atom ERD Thermostatic Bar Valve User Guide

KOHLER Mira Atom ERD Thermostatic Bar Valve User Guide

Introduction

Thank you for purchasing a quality Mira product. To enjoy the full potential of your new product, please take time to read this guide thoroughly, having done so, keep it handy for future reference.

Guarantee

For domestic installations , Mira Showers guarantee the Mira Atom against any defect in materials or workmanship for a period of five years from the date of purchase (shower fittings for one year).

For non-domestic installations , Mira Showers guarantee the Mira Atom against any defect in materials or workmanship for a period of one year from the date of purchase.
Failure to follow the instructions provided with the shower will invalidate the guarantee.

For Terms and Conditions refer to the ‘ Customer Service

Design Registration & Patents

Design Registration: GB 001225254-0003
Patents: GB 2 407 138

Recommended Usage

KOHLER Mira Atom ERD Thermostatic Bar Valve - Recommended
Usage

Pack Contents

KOHLER Mira Atom ERD Thermostatic Bar Valve - Pack
Contents

Safety Information

WARNING – This product can deliver scalding temperatures if not operated, installed or maintained in accordance with the instructions, warnings and cautions contained in this guide. The function of a thermostatic mixing valve is to deliver water consistently at a safe temperature. In keeping with every other mechanism, it cannot be considered as functionally infallible and as such, cannot totally replace a supervisor’s vigilance where that is necessary. Provided it is installed, commissioned, operated and maintained within manufacturers recommendations, the risk of failure, if not eliminated, is reduced to the minimum achievable. PLEASE OBSERVE THE FOLLOWING TO REDUCE THE RISK OF INJURY:

Mira thermostatic mixers are precision engineered and should give continued safe and controlled performance, provided:

  1. They are installed, commissioned, operated and maintained in accordance with the manufacturer’s recommendations.
  2. Periodic attention is given, when necessary, to maintain the product in good functional order.

Caution!

  1. Read all of these instructions and retain this guide for later use.
  2. Installation must be carried out in accordance with these instructions, and must be conducted by designated, qualified and competent personnel.
  3. Pass on this guide in the event of change of ownership of the installation site.
  4. Follow all warnings, cautions and instructions contained in this guide.
  5. Make sure that you fully understand how to operate this shower before use, read all operating instructions and retain this guide for future reference.
  6. This product is not intended for use by persons (including children) with reduced physical, sensory or mental capabilities, or lack of experience and knowledge, unless they have been given supervision or instruction concerning the use of the product by a person responsible for their safety.
  7. Children should be supervised to ensure that they do not play with the product.
  8. DO NOT perform any unspecified modifications to the shower or its accessories. When servicing only use genuine Kohler Mira replacement parts.
  9. DO NOT fit any form of outlet flow control. Only Mira recommended outlet fittings should be used.
  10. DO NOT operate the temperature control rapidly, allow 10 – 15 seconds for the temperature to stabilise before use.
  11. Care is required when adjusting flow or temperature, make sure that the temperature has stabilised.
  12. Care is required if the product is turned off and back on during showering as this may result in unstable temperature. Ensure temperature has stabilised before re-using product.
  13. Sunburn or skin conditions can increase your sensitivity to hot water. Make sure that you set the shower to a cooler temperature.
  14. The water supplies to this product must be isolated if the product is not to be used for a long period of time. If the product or pipework is at risk of freezing during this period they should also be drained of water.
  15. When this product has reached the end of its serviceable life, it should be disposed of in a safe manner, in accordance with current local authority recycling, or waste disposal policy

Specification

Pressures

  • Max Static Pressure: 10 Bar.
  • Max Maintained Pressure: 5 Bar.
  • Min Maintained Pressure: (Gas Water Heater): 1.0 Bar (for optimum performance supplies should be nominally equal).
  • Min Maintained Pressure (Gravity System): 0.1 Bar (0.1 bar = 1 Metre head from cold tank base to shower handset outlet).

Temperatures

  • Close temperature control is provided between 20°C and 50°C.
  • Optimum Thermostatic Control Range: 35°C to 45°C (achieved with supplies of 15°C cold, 65°C hot and nominally equal pressures).
  • Recommended Hot Supply: 60°C to 65°C (Note! The mixing valve can operate at temperatures up to 85°C for short periods without damage. However for safety reasons it is recommended that the maximum hot water temperature is limited to 65°C).
  • Minimum Recommended Differential between Hot Supply and Outlet Temperature: 12°C at desired flow rates.
  • Minimum hot water supply temperature: 55°C

Thermostatic Shut-down

  • For safety and comfort the thermostat will shut off the mixing valve within 2 Seconds if either supply fails (achieved only if the blend temperature has a minimum differential of 12°C from either supply temperature)

Connections

  • Hot: Left – 15mm pipework, 3/4” BSP to valve.
  • Cold: Right – 15mm pipework, 3/4” BSP to valve.
  • Outlet: Bottom , 1/2” BSP Male to flexible hose.

Note! This product does not allow for reversed inlets and will deliver unstable temperatures if fitted incorrectly.

Installation

Suitable Plumbing Systems

Gravity Fed:

The thermostatic mixer must be fed from a cold water cistern (usually fitted in the loft space) and a hot water cylinder (usually fitted in the airing cupboard) providing nominally equal pressures.

Gas Heated System:

The thermostatic mixer can be installed with a combination boiler

Unvented Mains Pressure System:

The thermostatic mixer can be installed with an unvented, stored hot water system

Mains Pressurised Instantaneous Hot Water System:

The thermostatic mixer can be installed with systems of this type with balanced pressures.

Pumped System:

The thermostatic mixer can be installed with an inlet pump (twin impeller). The pump must be installed on the floor next to the hot water cylinder.

General

  1. Installation of the shower must be carried out in accordance with these instructions by qualified, competent personnel.
  2. The installation must comply with the “Water Supply Regulations 1999 (Water Fittings)” or any particular regulations and practices, specified by the local water company or water undertakers.
  3. Make sure all pressures and temperatures comply with the requirements of the shower. See ‘Specifications’.
  4. The product must not be installed in an area where it may freeze. Pipework to the product that could become frozen must be properly insulated.
  5. DO NOT install the product in a position in which service access is restricted.
  6. For stud partitions alternative fixings may be required.
  7. Isolating valves must be installed close to the product for ease of maintenance.
  8. Pipework must be rigidly supported and avoid any strain on the connections.
  9. Pipework dead-legs should be kept to a minimum.
  10. If pipework enters the product from the rear through a hole in the wall, provision must be made to prevent water ingress back into the wall structure.
  11. The position of the shower and shower fittings must provide a minimum gap of 25 mm between the showerhead and the spill over level of any bath, shower tray or basin and a minimum gap of 30 mm between the showerhead and the spill over level of any toilet, bidet or other appliance with a Fluid Category 5 backflow risk (see diagram).

KOHLER Mira Atom ERD Thermostatic Bar Valve - The position of the shower and
shower fittings must provide a minimum gap

Note! There will be occasions when the hose retaining ring will not provide a suitable solution for Fluid Category 3 installations, in these instances an outlet double check valve must be fitted, this will increase the required supply pressure typically by 10kPa (0.1 bar). Double checkvalves fitted in the inlet supply to the appliance cause a pressure build up, which affect the maximum static inlet pressure for the appliance and must not be fitted. For Fluid category 5, double check valves are not suitable.

12. The showerhead should be positioned so that it discharges down the centre line of the bath or across the opening of a shower cubicle.
13. Only use the inlet connections supplied with the product. DO NOT use any other type of fittings.
14. All pipework must be checked for leaks before the product installation is completed. The product should be pressurised & the inlet & outlet connections
inspected.
15. DO NOT overtighten connections, screws or grubscrews as product damage may occur.
16. Upon completion of installation, or if the product is dismantled during installation or servicing, then the product must be inspected to ensure that there are no leaks.
17. Having completed the installation, make sure that the user is familiar with the operation of the product.

Installation of the Bar Valve

Before installing the pipework, please ensure that there is a minimum of 1065mm height clearance to allow for the rigid riser and overhead to be installed above. If installing in a restricted height area, a shorter riser rail can be ordered as a spare part.

KOHLER Mira Atom ERD Thermostatic Bar Valve - Installation of the Bar
Valve

KOHLER Mira Atom ERD Thermostatic Bar Valve - Installation of the Bar Valve
2

Installing the Shower Fittings

KOHLER Mira Atom ERD Thermostatic Bar Valve - Installing the Shower
Fittings

  1. Slide the hose retaining ring and the clamp bracket onto the middle bar, and then screw the middle and lower bar sections together.

  2. Screw the riser arm to the middle and lower bar section.

  3. Push the riser bar into the top of the bar valve.
    Note! The riser bar must be located correctly, push down firmly to seat it.

  4. Insert the wall fixing bracket into the riser arm mounting boss, then swivel the bar if necessary to reposition the wall fixing bracket against the wall.
    Note! The grubscrew mounting hole must be positioned at the top.

  5. Mark the holes for the wall fixing bracket.
    Note! Use a spirit level to ensure the bar is vertical.

  6. Remove the wall fixing bracket from the mounting boss then remove the riser bar from the bar valve.

  7. Drill two holes to suit the wall fixings, ensuring that the bar valve is protected from debris. Fix the bracket to the wall.

  8. Refit the riser bar into the bar valve and then put the concealing cover onto the riser arm mounting boss.

  9. Push the riser arm mounting boss onto the wall fixing bracket.

  10. Fit and tighten the grubscrew (2.5 mm hexagonal key) into the hole on top of the mounting boss then push the concealing cover over the wall fixing bracket.

  11. Tighten the grubscrew at the valve end and fit the grubscrew cover.

  12. Screw the fixed shower head onto the riser rail.

  13. Fit the shower hose onto the bottom outlet of the bar valve.
    Note! The shower hose has slightly different sized conical connections at each end (the smaller diameter / longer length conical is identified with a Red protective cover or a White label). The end with the red cover or white label connects to the showerhead, the clear end connects to the valve.

  14. Push the shower hose through the retaining ring and screw it to the showerhead.

  15. Place the showerhead into the clamp bracket, adjusting the angle and height to the users preference.

Commissioning

Maximum Temperature Setting

Before using the shower, the maximum temperature must be checked to make sure that it is at a safe level. It has been preset to a safe showering temperature under ideal conditions at the factory, appropriate for most systems. However, site conditions and personal preference may make it necessary to reset this temperature.

Note! Make sure that the hot water temperature is at least 55°C and that there is sufficient supply.
Caution! Before testing the mixer, make sure that the hot and cold water is flowing correctly by exercising the temperature selector knob between the cold and hot stops.

  1. Turn the temperature selector knob anticlockwise until it stops and test that the temperature of the water from the shower outlet is hot enough.

  2. If not, depress the override button and carefully rotate the knob further. If the water temperature is still not hot enough complete the following procedure.

  3. Rotate the temperature selector knob back to the override position.

  4. Push in and rotate the concealing cap clockwise to remove. Remove the fixing screw.

  5. Pull off the temperature selector knob without disturbing the stop assembly.

  6. Replace the temperature selector knob so that the lever is the 1 O’clock position.

  7. Rotate the temperature selector knob against the stop, wait for the water to stabilise and test that the temperature of the water from the shower outlet is hot enough.
    If the water temperature is still not hot enough repeat the procedure until a maximum safe temperature is achieved at the override position.

  8. Refit and tighten the fixing screw, refit the concealing cap.

KOHLER Mira Atom ERD Thermostatic Bar Valve - Refit and tighten the fixing
screw, refit the concealing cap

Operation

KOHLER Mira Atom ERD Thermostatic Bar Valve -
Operation

Adjusting the Temperature
The temperature is controlled by rotating the temperature selector knob.For safety reasons, the temperature is limited by an override stop. To obtain a higher
temperature, press the override button on the temperature selector knob and continue to rotate the knob.
Adjusting the Flow
The flow is controlled by rotating the flow selector knob to either the overhead or showerhead mode.

Cleaning

Cleaning
Many household cleaners contain abrasives and chemical substances, and should not be used for cleaning plated or plastic fittings. These finishes should be cleaned with a mild washing up detergent or soap solution, and then wiped dry using a soft cloth.
Important! The showerhead must be descaled regularly , keeping the showerhead clean and free from limescale will ensure that your shower and showerhead continue to perform to their maximum. A blocked showerhead can restrict the flow rate and may cause damage to your shower.

Fault Diagnosis

If you require a Mira trained service engineer or agent, refer to ‘Customer Service’.

KOHLER Mira Atom ERD Thermostatic Bar Valve - Fault
Diagnosis

Spare Parts

KOHLER Mira Atom ERD Thermostatic Bar Valve - Spare
Parts

Customer Service

Guarantee

Your product has the benefit of our manufacturer’s guarantee which starts from date of purchase. This guarantee only applies in the United Kingdom and
Republic of Ireland. To activate this guarantee, please return your completed registration card, visit our website or free phone 0800 5978581 within 30 days
of purchase (UK only).
Within the guarantee period we will resolve defects in materials or workmanship, free of charge, by repairing or replacing parts or product as we may choose.

This guarantee is in addition to your statutory rights and is subject to the following conditions :

  • The guarantee applies solely to the original installation under normal use and to the original purchaser only. The product must be installed and maintained in accordance with the instructions given in this guide.

  • Servicing must only be undertaken by us or our appointed representative.
    Note! If a service visit is required the product must be fully installed and connected to services.

  • Repair under this guarantee does not extend the original expiry date. The guarantee on any replacement parts or product ends at the original expiry date.

  • For shower fittings or consumable items we reserve the right to supply replacement parts only

The guarantee does not cover:

  • Call out charges for non product faults (such as damage or performance issues arising from incorrect installation, improper use, inappropriate cleaning, lack of maintenance, build up of limescale, frost damage, chemical attack, corrosion, system debris or blocked filters) or where no fault has been found with the product.
  • Water or electrical supply, waste and isolation issues.
  • Compensation for loss of use of the product or consequential or indirect loss of any kind.
  • Damage or defects caused if the product is repaired or modified by persons not authorized by us or our appointed representative.
  • Routine maintenance or replacement parts to repaired or modified by persons not authorised by comply with the requirements of theTMV2 or repaired or modified by persons not authorised by TMV3 healthcare schemes.
  • Accidental or wilful damage.
  • Products purchased ex-showroom display.

What to do if something goes wrong

If your product does not work correctly refer to this manual for fault diagnosis and check that it is installed and commissioned in accordance with our instructions.

If this does not resolve the issue, contact us for help and advice.

Helpdesk Service

Contact our Customer Services Team for product advice, to purchase spare parts or accessories or to set up service visit. You can contact us via phone or e-mail – contact details below. Please provide your model name, power rating (if applicable) and date of purchase.

Mira Showers Website
(www.mirashowers.co.uk)

Visit our website to register your guarantee, download user guides, diagnose faults, purchase our full range of accessories and popular spares, or request a service visit.

Spares and Accessories

We hold the largest stocks of genuine Mira spares and accessories.Contact us for a price or visit our website to purchase items from our accessory range and popular spares. (Only available in the United Kingdom )

Service/Repairs

No one knows our products better than our nationwide team of Service Technicians. We can carry out service or repair work to your product both during and after the guarantee period. (Only available in the United Kingdom and Republic of Ireland) Ask about our fixed price service repairs.

To Contact Us: UK

0844 571 5000

Calls cost 7p per minute plus your phone company’s access charge

Fax: 01242 282595

Email – Visit
www.mirashowers.co.uk/contactus

By Post: Mira Customer Services Dept, Cromwell Road, Cheltenham, Gloucestershire GL52 5EP

To Contact Us: Eire Only

01 531 9337

E-mail:
CustomerServiceEire@mirashowers.com

Mira is a registered trade mark of Kohler Mira Limited.

The company reserves the right to alter product specifications without notice.

1340912-W2-A                                                      © Kohler Mira Limited, February 2018

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals